CROWN GASKETS PVT. LTD.

PRE-FEASIBILITY STUDY
PART NAME - CUSTOMER PAGE - 1 OF 2
PART NO- MODEL / PROJECT
DRAWING NO - REV.NO
Answers / To be taken by &
S.NO Question / Checkpoints Evaluate Risk Action to be taken Resp.
Justification target date
A Product Development 1 2 3
1 Are volumes economical?
2 Is there new technology?
3 Is product similar to previous?

B Process
1 Can we do all required processes?
2 Are competent employees available?
3 Are competent suppliers available?
4 Can we train the people?
5 Are the lessons learnt?

C Material Selection
1 Is suitable material available to meet the specification?
2 Is it readily available?
3 Is an alternate material available?
4 Is there a certificate of compliance
5 Do we have material data spec. sheet?

D Material Supply (Sub-contractor)


1 Is the supplier certified/Approved?
2 Are there alternate suppliers?
3 Do we have a storage space?
4 Is Lead time sufficient enough to meet requirements?
Form No. - CG/QA/32 Rev No.- 00 Issue Date : 20.08.2019

E Testing PAGE - 2 OF 2
1 Do we understand the testing requirements?
2 Can we test in-house?
Do we have necessary equipment & fixtures for testing?
3
4 Is the tooling suitable for our machines?
5 Is the tooling available?
6 Can we use the tooling on various machines?
7 Is there back-up facility for any contingency?

F Machinery
1 Are machines available?
2 Are they capable?
5 Do we have correct power and services?

G Environmental & Safety


1 Do we need to maintain and follow MSDS?
Does any chemical can harm the personnel during
2 handling or usage?

H Facilities
1 Do we have space for the plant?
3 Can the space support the plant and the processes?
4 Do we have storage space?
6 Can we move to other facilities during contingency?

Low Risk-No further


investigation required
Modurate - Needs further
investigation & Actions

High Risk-Definite risk-full analysis required

NOTE: This sheet assists in the completion of feasibility study


Review Results :-

Feasible - Yes/No :

Remarks :

Reviewed By: Approved By :

Form No. - CG/QA/32 Rev No.- 00 Issue Date : 20.08.2020