( QUALITY ASSURANCE )
5
Confirm whether operator works as per WI/Machine setting
6 procedure ?
Are machine parameter checked as per plan ?
7
Availability of Limit Samples at work place and confirm
8 knowledge level of operator for the same ?
SIGNATURES :-
HOD:- ………………………………
SHRIRAM PISTONS & RINGS LTD, PATHREDI
( QUALITY ASSURANCE )
SIGNATURES :-
ED. :-……………………………………
SHRIRAM PISTONS & RINGS LTD, PATHREDI
( QUALITY ASSURANCE )
SIGNATURES :-
Auditee :-…………………………………… Auditor:-……………………………….
HOD:- ………………………………
SHRIRAM PISTONS & RINGS LTD, PATHREDI
( QUALITY ASSURANCE )
- √ x
LINE/
Section
SHIFT :-
3 Is FIFO used?
Is nonconforming or suspect product identified and placed in
4 a designated area?
Are proper containers used in production, including outgoing
5 material?
Control Plan
Are control plan checks made at the proper frequency, with
1 the correct sample size and on the correct form?
Are product/process checks within specification? If not, are
2 reaction plans being followed?
Sr. No. Checking Points Not Req. OK No Remarks
Measurement Systems
Containment/Rework
Are NG parts identified with appropriate tag with Bins to
avoid mix up ?
Are NG parts disposed off on time ?
SPC Charts
are SPC charts being filled up as per decided frequency and
event log sheet recording done ?
1
SIGNATURES :-
HOD:- ………………………………