Professional Documents
Culture Documents
0183-ITP-01
ARCHIRODON Revision 1
PETROJET
CONSORTIUM Offshore soil investigation Date: 7/10/2007
Page 1 of 1
Visual inspection
Misr Raymond Rep
2 Bore hole depth (length + 0.5m N/A 100% H S R N/A
Arco Rep
measurement)
No disturbance to sample
Sample extraction Misr Raymond Rep
3 Visual during extraction and N/A 100% H S R N/A
and transportation Arco Rep
transportation to lab
Legend : W = Witness (attendance expected, signature on check sheet), H = Hold Point (signature required to proceed), S = Subcontractor
S = Surveillance (random attendance, no signature), R = Review record A = Archirodon C = Client
Prepared by, Date & Signature Reviewed by, Date & Signature Approved by, Date & Signature