You are on page 1of 2

Client: Consultant: Contractor: Form No. 3-QC-03.

Inspection and Test plan for Asphalt Road work

Project No.: Project Name: Construction and Operate Phase-1 Green Riyadh Nursery Project Legend:
ITP No.:
GRP-07-NU002 P-Perform H-Hold Point
I-Inspection R-Record Review
Revision: Date:
S-Surveillance W-Witness
Prepared By: SYED SARFARAZ ALI Reviewed By: Approved By: Aprroved Date:

Specification Type of Verifying Inspection level


No. Activity Description Acceptance Criteria Contracto
Reference Inspection Document/records Dorsch TPI Client
r
1.0 Document Review

Approved
1.1 Asphalt suplier approval RCRC Specs R Approved prequalification R R R
prequalification
Approved method Approved method
1.2 Method statement RCRC Specs R R R R
statement statement
Approved method Approved method
1.3 Work permits RCRC Requirment R R R R
statement statement
1.4 Asphalt mix design Approved mix design R Approved mix design Approved mix design H W W
2.0 material Reciewing
Prime coat, Tack Coat and Asphalt reciviening Inspection Method Method
2.1 W Checklist-2 H W W
statement/specs statement/specs
3.0 Installation
Surface Sub grade material suitability and FDT rate of 95% Method Checklist
3.1 W WIR /FDT report R R R
preparation statement/specs

Page 1
Client: Consultant: Contractor: Form No. 3-QC-03.0

Inspection and Test plan for Asphalt Road work

Project No.: Project Name: Construction and Operate Phase-1 Green Riyadh Nursery Project Legend:
ITP No.:
GRP-07-NU002 P-Perform H-Hold Point
I-Inspection R-Record Review
Revision: Date:
S-Surveillance W-Witness
Prepared By: SYED SARFARAZ ALI Reviewed By: Approved By: Aprroved Date:

Specification Type of Verifying Inspection level


No. Activity Description Acceptance Criteria Contracto
Reference Inspection Document/records Dorsch TPI Client
r
Prime coat application Method MS/Approved mix
3.2 Asphalt work W WIR/checklist W W R
statement/specs design
Reciept of asphalt mix Method
3.3 W Approved mix design Mix design W W W
statement/specs
Application and compaction of asphalt base
Method Method
3.4 Course W WIR/FDT/Checklist W W W
statement/specs statement/specs
Tack coat application Method Method
3.5 W WIR/checklist W W W
statement/specs statement/specs
Application and compaction of asphalt wearing Method Method
3.6 W WIR/checklist W W W
Course statement/specs statement/specs
Preparation of asphalt paving Method Method
3.7 W WIR/checklist W W W
statement/specs statement/specs
Euipment being used Method Method
3.8 W MS/WIR/checklist W W W
statement/specs statement/specs
Method Method
3.9 compaction Compaction rate shall be 95% H WIR/checklist/FDT H H W
statement/specs statement/specs
Check construction joint Method Method Approved
3.10 W W W W
statement/specs statement/specs drawings/checklist
Confirm paving protection Method Method
3.11 W WIR/checklist W W W
statement/specs statement/specs
Confirm the profile by crown template and strait Method Method
4.0 Survey Report edge W WIR/SURVEY REPORT W W W
statement/specs statement/specs

Page 2