Project No.: Project Name: Construction and Operate Phase-1 Green Riyadh Nursery Project Legend:
ITP No.:
GRP-07-NU002 P-Perform H-Hold Point
I-Inspection R-Record Review
Revision: Date:
S-Surveillance W-Witness
Prepared By: SYED SARFARAZ ALI Reviewed By: Approved By: Aprroved Date:
Approved
1.1 Asphalt suplier approval RCRC Specs R Approved prequalification R R R
prequalification
Approved method Approved method
1.2 Method statement RCRC Specs R R R R
statement statement
Approved method Approved method
1.3 Work permits RCRC Requirment R R R R
statement statement
1.4 Asphalt mix design Approved mix design R Approved mix design Approved mix design H W W
2.0 material Reciewing
Prime coat, Tack Coat and Asphalt reciviening Inspection Method Method
2.1 W Checklist-2 H W W
statement/specs statement/specs
3.0 Installation
Surface Sub grade material suitability and FDT rate of 95% Method Checklist
3.1 W WIR /FDT report R R R
preparation statement/specs
Page 1
Client: Consultant: Contractor: Form No. 3-QC-03.0
Project No.: Project Name: Construction and Operate Phase-1 Green Riyadh Nursery Project Legend:
ITP No.:
GRP-07-NU002 P-Perform H-Hold Point
I-Inspection R-Record Review
Revision: Date:
S-Surveillance W-Witness
Prepared By: SYED SARFARAZ ALI Reviewed By: Approved By: Aprroved Date:
Page 2