PROJECT: CONSTRUCTION & OPERATE PHASE 1 GREEN RIYADH NURSERY PROJECT, RCRC, KSA
RISK ASSESSMENT
ACTIVITY: Concrete Works Ref: HIRA/CIV/06
RISK RESIDUAL RISK
CONTROL MEASURES L
SN. HAZARD HARM/HAZARD
LXS L M H X L M H
S
MAG will Implement permit-to-work system
for activity to be carried out,
Activity-8.1 Task will be briefed by MAG supervisor and
Dust record will be maintained.
Site / work ExposureSlip, Limit the working time of the workers
4
1 preparation Trip 3x3 9M exposed to adverse environmental Supervisor
L
Defective Equipment condition.
orMachinery Site staff and workers must be competent
High speed vehicles to execute the job.
Site traffic speed limit must be followed
Site access routes must be clearly defined.
Allocate adequate resources (personnel
and equipment) for continuous
housekeeping.
Train employees on housekeeping.
Activity-8.3 -execution Ensure an appropriate housekeepinglevel
at all times.
Poor Fire Ensure instant and regular waste removal
Slips/Trips/Fall from site.
Housekeeping 3x4 12M 4
2 sIll-health Provide proper welfare facilities such as L
Supervisor
Environmental Pollution toilets, rest area, hand wash, anddrinking
water to the employees.
Maintain an adequate housekeeping
Environmental daily checks will be
maintained and monitoring will be carried
out by professional 5 in 1
environmental meter.
RISK ASSESMENT MATRIX CONTROL SHEET
PROJECT: CONSTRUCTION & OPERATE PHASE 1 GREEN RIYADH NURSERY PROJECT, RCRC, KSA
REVIEWED BY
Syed Sarfaraz Hussain REV. DATE:
(NAME):
SIGNATURE:
APPROVED BY
(NAME): AHEMAD SNOBER
SIGNATURE: