Task 2
Manage project quality
BSBPMG532
Student Declaration
To be filled out and submitted with assessment responses
◻ I declare that this task and any attached document related to the task is all my own work
and I have not cheated or plagiarised the work or colluded with any other student(s)
◻ I understand that if I am found to have plagiarised, cheated or colluded, action will be
taken against me according to the process explained to me
◻ I have correctly referenced all resources and reference texts throughout these
assessment tasks.
◻ I have read and understood the assessment requirements for this unit
◻ I understand the rights to re-assessment
◻ I understand the right to appeal the decisions made in the assessment
Unit Title
Unit Code
Student
name
Student ID
number
Student Date 08/08/2021
signature
Task Number
Marking Comments
DNS
N
Y
Completed successfully
The student has satisfactorily completed ☐ ☐ ☐
and submitted the following:
DNS
N
Y
Completed successfully
Adopted a collaborative approach
Agreed on changes to the project quality ☐ ☐ ☐
plan were applied.
The student attended the meeting with ☐ ☐ ☐
the marketing team and the project
sponsor in week 3:
Identify the quality objectives and
standards in consultation with the
marketing team
Consult with the marketing team on
quality requirements
Consider inputs from the project
sponsor, played by the trainer and
assessor in simulated work conditions
Listened actively
DNS
N
Y
Completed successfully
Notes from the briefing session in
week 1 in Task 2.1A
Summary of feedback and inputs into
the project quality plan in Task 2.2
Active participation in the briefing
session with the project sponsor
(Refer to marking sheet)
Active participation in the meeting
with relevant stakeholders in Task
2.1C and Task 2.2.1 (refer to marking
sheet)
Student Name:
Assessor Name:
Assessor Signature:
Date:
Table of Content
Student Declaration........................................................................................... 2
Task 2 – Determine quality requirements.................................................. 6
Task 2.1 Determine quality requirements........................................................... 10
Task 2.2 Case Study.......................................................................................... 15
What is this Refer to and read the documents saved in a separate folder:
assessment task
about? MMI company profile and project task
Policies and Procedures
Scope
Time
Quality
Cost
Human Resources
Information system and communication
Risk
Project Integration
Communicate with influence
Facilitate continuous improvement in project work
Develop project workplace policy and procedures for
sustainability
Lead and manage project team effectiveness
Having a clear vision of the project and its structure will help
you plan and implement it in simulated work conditions.
You will work in a project team of max four students. You will
Task summary and instructions
Student Name
Student Name
Student Name
Student Name
Although you will lead and collaborate with the project team,
your assessment's work must be individual, and it will be
marked as such.
Industry standards
Organisational policy, systems and procedures
Regulations and legislation.
Project overview
Provide an overview of the project: name of the project, why it is undertaken, timelines
and budget. (40-80 words)
The company's COLLABORATIVE ALLIANCE project XYZ Pty Ltd trading as MMI Professional
Education is an Australian boutique education provider in Melbourne consists of making
alliances between internal departments to enhance resources and support the achievement of
organizational objectives, also to make alliances with external partners to improve competitive
advantage, acquire additional resources, experience and achieve common objectives.
This is why the company xyz has decided to expand its headquarters in the city of Sydney, and
for which they decided to hire me as Project Manager (PM), for this new project the Board of
Directors (BoD) has allocated 3 million dollars, which will be destined for:
1) hire four new staff members to be part of the project team for its duration
2) Find a location in Sydney CBD (800-1000 square meters, on-site parking for staff, natural
light)
3. To expand the course offering by adding new qualifications to the scope of registration:
the Diploma of Leadership and Management and the Advanced Diploma of Program
Management
5. To position the company as leader for quality business education in Australia within the
next three years.
REQUIREMENTS
We need to generate recognition before the student community, generate more marketing, and
make ourselves known as one of the best universities
Project deliverables
COLLABORATIV
E ALLIANCE
project XYZ Pty
Ltd
Final
develop the 19 JULY 2021
project - identify and meet
construction of stakeholders
the new campus
go a ls
greenwichcolleg
Sponsor (PS) e .e du.au
COLLABORATIV E
ALLIANCE
project XYZ Pty Ltd
02 AUGUST
22 JULY 2021
2021
set and prioritize goals
final presentation to the
Project Sponsor (PS)
Project stakeholders
Identify 8-10 project stakeholders (groups and/or individuals).
Estimating pricing
Engineer building work
Planner selecting the
most cost
and time
effective
method of
carrying out
the work
Quality Management Approach
programming
each activity
of work in a
coordinate
order
providing
details of site
requirements
Construction develop a
Contractor schedule for
all
construction
activities in
accordance
with the
contract
documents
Structural design the
Engineer building
structure,
including the
drainage
installation
Quality control The project manager, together with the project
stakeholders, will develop the project quality checklist.
Outline all the following in a cohesive and
comprehensive series of paragraphs:
Also, with the help of the construction company, the Project
o The plan for QC and QA: when they Manager will conduct audits to ensure conformity of the
will be performed, tools and project with the stakeholders’ expectations. The project
techniques that will be utilised, key
personnel that will perform them. Any
manager will also develop quality checklists to be used by
relevant information on how you will the team members.
analyse the data. The project manager must ensure that the quality
o Process for recording the QC and QA
data and how they will be
procedures implemented during the design phase of a
communicated to relevant construction project effectively meet the company-
stakeholders. established standards for quality service, performance and
o What process is in place if it is
determined that quality standards do
production. The core specs focus on qualifications
not comply with the standards established for architects, designers and engineers, and the
defined in the plan at the end of the assurance that specified materials complies with company-
project?
(100-150 words)
established quality standards.
To comply with this, Quality control processes such as visit
and inspection of supplier facilities, materials testing, keep
quality management documents current, ensure that all
workers and suppliers remain compliant with current
requirements and monitor, train, and track in real time must
be implemented.
Non-conformances will be managed by the Project Manager
if they are insignificant and do not affect project objectives.
Quality Management Approach
Any other form of non-conformance must be escalated and
reviewed by the Project Sponsor. By the end of the project if
quality issues remain unresolved the project can be finalised
if the project’s product is accepted by the Project Sponsor.
Otherwise, rework needs to be planned by the Project
Manager to get the issues resolved and get the Project
Sponsor’s approval.
for the new feel management - Certify that - Review of Six Sigma
campus requirement is plan; the project is Methodology usage in the
achieved and -Present completed project
that the reports and that the
customer is regarding client’s
satisfied; construction demand is
- Elaborate a issues, achieved.
checklist to photographic - Application
ensure the records and of physical
best customer eventual and technical
experience. design oy criteria and
layout guidelines;
changes.
Schedule a time with the trainer and assessor in week 3 of class to present the project
quality management plan to the project sponsor (played by the trainer and assessor) and
a group of relevant stakeholders (members of the project team and the project steering
committee played by a group of classmates) in a simulated work environment.
When presenting your work:
Confirm quality objectives and standards
Discuss and confirm quality metrics and requirements for each project deliverable
Negotiate proposed roles and responsibilities for project quality management
Confirm quality assurance and control processes and practices
Demonstrate support for the quality management plan
Use active listening and questioning to elicit views and opinion of others
Document feedback and inputs from the group of stakeholders
Adopt a collaborative approach
Duration: 15 minutes.
The trainer and assessor will evaluate your performance during the presentation and
provide feedback on the marking sheet.
If you are absent from class, you are responsible for making alternative arrangements
with the trainer and assessor to present the project quality management plan.
At the end of the meeting:
Finalise the project quality management plan. Document the agreed changes in the
table provided below:
Agreed changes
Stakeholders' The stakeholders’ expectations were met and the project
expectations sponsor was satisfied with the project result after establishing a
few changes regarding the layout of the building’s entrance.
The communication between the team members, relevant
stakeholders and project sponsor was a crucial factor to enable
the project completion within the time frame.
Quality Planning The quality planner register was elaborated within the terms of
Register the deliverables. Along the project, as the project sponsor
decided to change the layout of the building’s entrance, it was
necessary to adequate some quality control activities to make
sure that the project would be finalised within the initial terms.
Please note that the trainer and assessor will check that the agreed changes have been
applied to the project quality management plan submitted with your assessment.
Schedule a time with the trainer and assessor in week 3 to discuss the requirements of
the project quality management plan with the marketing team (played by a group of
classmates) in a simulated work environment:
Identify the quality objectives and standards in consultation with the marketing team
Consult with the marketing team on quality requirements
Consider inputs from the project sponsor, played by the trainer and assessor in
simulated work conditions
Develop a project quality plan
The trainer and assessor will validate your active participation in the meeting with the
marketing team and provide feedback on the marking sheet.
If you are absent from class, you are responsible for making alternative arrangements
with the trainer and assessor to present the project quality management plan.
1. Summarise the feedback and inputs received from the marketing team and the
project sponsor in the space provided below.
(50-100 words)
Quality requirements requires consultation with clients and key stakeholders, is recorded in a
quality definition table. the Quality Definition Table can include:
3) a unit of measure and standard for each item identified (these would be
descriptive)
4) any items that can be compromised if required.
Project overview
Provide an overview of the project: name of the project, why it is undertaken, timelines
and budget. (40-80 words)
The company's XYZ Pty Ltd trading as MMI Professional Education has planned the presentation of the new
campus to educational agents, from May 10, 2021 and which will take place on June 20, 2021, through a
virtual meeting by zoom, which will be organized by the team of marketing and presented by the marketing
manager, this presentation will be attended only by:
• Education agents
• MMI -CEO
• Financial Director of MMI
• Marketing manager and marketing team
• Academic manager
To carry out this meeting we will use programs such as PowerPoint and Q&A to publicize all the aspects of the
new project.
The event is estimated to last approximately 1 hour, the estimated budget for this presentation will be $ 1,500
Requirements:
1) Have all the necessary material to carry out the presentation of the new campus
3) A minute will be held in which the most important aspects of the implementation of the
new campus in Sydney will be reported.
Project deliverables
List the project deliverables (4-6)
10/05/2021
Event planning starts
19/05/2021
Determination of objectives to carry out the meeting.
30/05/2021
determination of the quality requirements for the presentation of the project to educational agents
03/06/2021
development of the quality plan for the presentation of the new campus
20/06/2021
Presenting the new campus to education agents
Launch and initiate a joint work process, of the new campus in Sydney
Project stakeholders
Identify 5-6 project stakeholders (groups and/or individuals).
Financial Director of MMI The financial Director will provide Establish goals and standards
information about costs and of performance for all team
customers, when projects could be members.
marketed to outside customers.
Academic manager If f their relationship is good, they Support the alliances with
may be able to consistently acquire other stakeholders.
the best staff and the best
equipment for their projects.
Internal customers Internal customers are individuals Those people hold the power
within the organization who are to reject or approved the
customers for projects that meet the project, so keep them
needs of internal demands informed, and stay tuned
about their concerns.
The Project team Part of the team dedicated to the Assist to meetings related
project or borrowed on a part-time with the plan; expect
basis. leadership, direction and
control.
Development
The team members had a previous meeting to
Outline all the following in a cohesive and outline the client requirements and to align the
comprehensive series of paragraphs: project management and quality plan together
o Mention what essential project with the marketing team;
requirements/objectives/needs are Inputs: The relevant stakeholders hold a meeting
considered for quality planning to discuss about the policies and procedures that
o Identify and list the significant inputs
into the plan
needed to be explained to the participants of the
o Mention any industry or organisational zoom meeting, regarding the presentation of the
quality standards that are taken into new campus to the educational agents;
consideration Inputs: The team members also considered the
o Describe the involvement of key
standard procedures related to operation
stakeholders (specifically mention
what stakeholders) in the processes, a meeting with the marketing team to
development of the quality plan. organize the event as required and a review of the
o Identify what specific policies and previous projects has been made and the lessons
procedures are taken into learned were taken into consideration to the
consideration when developing the
quality plan
present project;
(80-120 words) The marketing and communication requests were
considered when elaborating the Power Point
presentation and the Q&A so that the meeting
could occur within the customer’s expectation;
Organisation, Name Role Quality
responsibilities and Responsibiliti
interfaces es
Marketing Present
Determine and record the primary roles Manager the event
and responsibilities of the project team
and other critical stakeholders as related Marketing Team organising
to project quality management. It could the event
include coaching, mentoring, auditing to present
processes, project reviews, provision of
crucial knowledge and expertise.
the new
Add additional rows if needed. campus to
education
Quality Management Approach
agents
Education Agents Attendee
MMI -CEO Attendee
MMI CFO Attendee
Academic Attendee
Manager
Architect Attendee
and
auditor
Quality control The project manager, together with the project
stakeholders, will develop the project quality checklist.
Outline all the following in a cohesive and
comprehensive series of paragraphs:
Also, with the help of the construction company, the
o The plan for QC and QA: when they Project Manager will conduct audits to ensure conformity
will be performed, tools and of the project with the stakeholders’ expectations. The
techniques that will be utilised, key
personnel that will perform them. Any
project manager will also develop quality checklists to be
relevant information on how you will used by the team members.
analyse the data. The project manager must ensure that the quality
o Process for recording the QC and QA
data and how they will be
procedures implemented during the design phase of a
communicated to relevant construction project effectively meet the company-
stakeholders. established standards for quality service, performance,
o What process is in place if it is
determined that quality standards do
and production. The core specs focus on qualifications
not comply with the standards defined established for architects, designers and engineers, and
in the plan at the end of the project? the assurance that specified materials complies with
(80-120 words)
company-established quality standards.
To comply with this, Quality control processes such as
visit and inspection of supplier facilities, materials
testing, keep quality management documents current,
ensure that all workers and suppliers remain compliant
with current requirements and monitor, train, and track in
real time must be implemented.
Non-conformances will be managed by the Project
Manager if they are insignificant and do not affect project
objectives. Any other form of non-conformance must be
escalated and reviewed by the Project Sponsor. By the
end of the project if quality issues remain unresolved the
project can be finalised if the project’s product is
accepted by the Project Sponsor. Otherwise, rework
needs to be planned by the Project Manager to get the
issues resolved and get the Project Sponsor’s approval.