1 RO : Supplying, installing, testing and commissioning of R.O. System consists of pressure gauges at inlet & outlet, sample
cock, air vent valve with piping, U-PVC & SS 316 distribution pipe and all accessories complete. (Contractor has the
responsibility to check the Total Dissolved Solids in raw water analysis report before procuring the equipments)
2 NOTE:
1. While quoting the rate the vendor shall go through the technical specifications of the RO thoroughly along with make list of
various componets and quote accordingly.
2. While quoting the rate for a item where the multiple options for the make list is given, the vendor shall give the specific make
the vendor is providing.
3. The successful vendor upon issue of LOI has to produce within 15 days the detailed design of their RO along with details of
all components.
4. Number of pumps in the system: As per technical data sheet.
5. Flow rate of pump: As per technical data sheet.
6. Approximate Power Requirement : As required based on specified duty condition.
7. Preferred Make: As specified in technical data sheet.
8. The rate shall be inclusive of SS 316 Pipe & UPVC SCH-40 Pipe with necessary fittings and flange, nut, bolt, washer,
gasket for the suction and delivery manifold with the galvenised piping support as per the tender drawing till the outlet point
inside the pump room including coupling of required size on suction and flexible removable type (Flanged) coupling on
delivery end of pump. The pipelines after the delivery manifold shall be measured and paid for separately.
9. The sensor float valves and controllers in the treated water and the storage tanks, related instrumentation, control cable from
motor to panel and it's connection, over load protection relay power cable from panel to the pump motor and its end connections
with required lugs and other accessories required for the auto operations of the entire RO system shall be included in the rate.
10. The accessories like Strainer with by pass arrangement, pressure guage on delivery line with isolation cock, mechanical seal,
NRV, butterfly valves as shown in the tender drawings and approved shop drawings for delivery and suction headers, drain
pipe with valve for the pump and all other related accessories for monitoring and control shall be included in the cost.
11. The pump motor control panel shall be provided with the NO/NC contact for connectivity to the BAS and same shall be
included in the cost.
12. The rate shall be inclusive of Pump & motor both fitted on the common base frame / plate with balanced coupling, provision
for the support clamp/lifting device, Foundation bolts and vibration isolators with all other accessories.
MASTER BOQ FOR RO
2 of 4
TECHNICAL SPECIFICATIONS
# BOQ ITEM TECHNICAL PARAMETERS AND OTHER DETAILS
1 RO 1. Capacity: 1000 LPH RO SYSTEM.
5 HYDROPNEUMATIC PUMP TY-1 (FOR RO W1. Number of pumps in the SET: 2 Nos. (1 Working + 1 Standby) Both the Pumps on VFD
2. Flow rate of each Pump: 17 LPM @ 35 Mtr. Head
3. Approximate Power Requirement: 1.0 HP
4. Preferred Make: Grundfos/Willow/DP Holland
5. Control logic: The set shall stop to draw water once the water level goes below the specified
minimum water level in the water tank from which the pump is drawing water.
NOTE: The BOQ and Technical Specifications shall be read in conjunction with Preamble attached herewith
BOQ FOR RO CCP COMMERCIAL RO SYSTEM
SL. NO. DESCRIPTION UOM QTY Details Consideration
4 OF 4