Resource Material Max.

Type Initials Group Std. Rate Ovt. Rate


Name Label Units

Mandor Work M 100% Rp4.000/hr Rp7.000/hr

Pekerja Work P 100% Rp7.252/hr Rp0/hr

Kepala
Work K 100% Rp2.170/hr Rp0/hr
Tukang

Tukang Kayu Work T 100% Rp1.960/hr Rp0/hr


Pekerja Work P 100% Rp29.008/hr Rp0/hr

Dolken Kayu
Material Batang D Rp69,250
Ø 8-10/400cm

Kayu 5/7 Material m3 K Rp140,350


Paku Biasa 2''-
Material kg P Rp1,002
5''
Portland
Material kg P Rp3,035
Cement
Pasir Beton Material m3 P Rp798
Koral Beton Material m3 K Rp1,305
Seng
Material Lbr S Rp56,400
Gelombang
Meni Besi Material kg M Rp15,345
Kayu Balok
Material K Rp233,916
5/7
Paku 2''-3'' Material P Rp334
Kayu Papan
Material K Rp13,234
3/20
Kayu Material m3 K Rp362,570
Paku Biasa Material kg P Rp5,010
Plywood 4
Material m3 P Rp108,945
mm
Pasir Urug Material m3 P Rp132,480
Tukang Batu Work T 100% Rp21.560/hr Rp0/hr
Kerikil Material m3 K Rp107,300
Air Material m3 A Rp3,870
Batu Belah Material m3 B Rp194,880
Pasir Pasang Material m3 P Rp77,398
Kerikil maks
Material kg K Rp107,300
(30mm)

Tukang Besi Work T 100% Rp80.629/hr Rp0/hr

Besi Beton
Material kg B Rp1,234,110
(Polos/Ulir)
Kawat Beton Material kg K Rp29,795
Kayu Kelas III Material m3 K Rp308,800

Paku 5cm-
Material kg P Rp26,455
12cm
Minyak
Material Liter M Rp10,931
Bekisting
Balok Kayu
Material m3 B Rp115,800
Kelas III
Plywood
Material m3 P Rp163,287
Tebal 9 mm
Dolken Kayu
Material Batang D Rp438,812
Ø 8-10cm
Paku 5cm dan
Material kg P Rp19,842
10cm
Tukang Las
Work T 100% Rp5.880/hr Rp0/hr
Konstruksi

Baja Ringan
Material kg B Rp16,675
IWF (75.35.7)

Baja Ringan
Profil C Material kg B Rp13,896
(35.15.5)

Genteng Metal
Material Lbr G Rp58,650
(0.3cm)

Paku Biasa
Material kg P Rp3,340
1/2''-1''
Papan Kayu Material m3 P Rp20,797
Paku 5cm dan
Material kg P Rp1,670
7cm

Bubungan Stel
Gelombang Material m3 B Rp170,018
1.08m

Paku Sekrup
Material buah P Rp875
3.5"
Seng Plat Material m3 S Rp47,250
Paku 1-2.5 cm Material kg P Rp251

Papan Kayu
Material m3 P Rp35,921
Kelas II/III
Bata Merah Material Bh B Rp49,000
Balok Kayu Material m3 B Rp2,144,230
Paku 10 cm Material kg P Rp20,875
Lem kayu Material kg L Rp16,133
Engsel Pintu Material bh E Rp14,400
Handle Material bh H Rp14,600
Kunci Tanam Material bh K Rp83,700
Grandle Pintu Material bh G Rp13,400
Pengait Material bh P Rp11,100
Grandle
Material bh G Rp14,400
Jendela

Engsel Jendela Material bh E Rp12,200

Handle
Material bh H Rp14,600
Jendela
Kaca Tebal
Material m2 K Rp65,890
3mm
Sealant Material kg S Rp2,000
Rangka Metal
Hollow Material m3 R Rp107,600
40.40.2
Assesoris Material Ls A Rp107,600
Gypsum Material m2 G Rp26,572
Paku Sekrup Material kg P Rp28
1 Unit
Pekerjaan
Material unit 1 Rp53,000
Pemasangan
Titik Lampu
1 Unit
Pekerjaan
Material unit 1 Rp74,500
Pemasangan
Stop Kontak
1 Unit
Pekerjaan
Material unit 1 Rp24,000
Pemasangan
Saklar
1 Unit
Pekerjaan
Material unit 1 Rp11,500
Pemasangan
Sekring
1 Unit
Pekerjaan
Material unit 1 Rp35,000
Pemasangan
Box Meter
Kran Air Material buah K Rp20,000
Sealtape Material m3 S Rp50
Pipa PVC 3/4'' Material m2 P Rp11,040
Perlengkapan Material Ls P Rp112,700
Bak Fiberglass Material unit B Rp270,000
Kloset Duduk Material unit K Rp1,233,300
Fiber
Material bh F Rp8,300,000
Septictank
Wastafel Material unit W Rp854,000
Pipa PVC 3'' Material m2 P Rp42,240
Floordrain Material bh F Rp60,000
Ubin Keramik Material buah U Rp205,351
Semen Warna Material kg S Rp14,850
Railing
Material m2 R Rp350,000
Tangga
Railing
Material m2 R Rp370,000
Balkon

Tukang Cat Work T 100% Rp6.174/hr Rp0/hr


Plamuur Material kg P Rp1,750
Cat Dasar Material kg C Rp2,700
Cat Penutup Material kg C Rp6,084
Cat Menie Material kg C Rp6,080
Kuas Material buah K Rp178
Pengencer Material liter P Rp519
Ampelas Material lbr A Rp1,360
kep Work 100% Rp0/hr Rp0/hr
Peje Work P 100% Rp0/hr Rp0/hr
Tukang b Work T 100% Rp0/hr Rp0/hr
Tuang c Work T 100% Rp0/hr Rp0/hr
Base
Cost/Use Accrue At
Calendar

Rp0 Prorated Standard

Rp0 Prorated Standard

Rp0 Prorated Standard

Rp0 Prorated Standard


Rp0 Prorated Standard

Rp0 Prorated

Rp0 Prorated
Rp0 Prorated

Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated Standard
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated

Rp0 Prorated Standard

Rp0 Prorated
Rp0 Prorated
Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated Standard

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated
Rp0 Prorated
Rp0 Prorated

Rp0 Prorated

Rp0 Prorated
Rp0 Prorated
Rp0 Prorated

Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated
Rp0 Prorated

Rp0 Prorated

Rp0 Prorated
Rp0 Prorated
Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated

Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated

Rp0 Prorated

Rp0 Prorated Standard


Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated
Rp0 Prorated Standard
Rp0 Prorated Standard
Rp0 Prorated Standard
Rp0 Prorated Standard