ID Resource Name Type Material Label Initials Group Max.

Units
1 Pekerja Work P 43
2 Mandor Work M 11
3 Kepala Tukang Work K 11
4 Tukang Work T 29
5 Batu belah Material m3 B
6 Batu Pecah Material m3 B
7 Batu Bata Material bh B
8 Pasir Beton ex Palu Material m3 P

9 Pasir Urug Material m3 P


10 Pasir Pasangan Material m3 P
11 Pasir Urug lainnya Material m3 P
12 Tanah Timbunan Material m3 T
13 Semen Portland Material kg S
14 Semen Putih Material kg S
15 Semen Warna Material kg S
16 Kayu Ulin Material m3 K
10/10-400
17 Kayu Kelas III Material m3 K
18 Papan 2/20 meranti Material m3 P

19 Kayu kelas I Material m3 K


20 Balok Kayu Material m3 B
21 Papan Bangkirai Material m3 P
22 Kayu bangkirai Material K
23 Balok kayu Material m3 B
Bangkirai
24 Kaso 5x7 cm Material m3 K
25 Kayu 5/7 meranti Material m3 K
kelas III
26 Lisplank Material lbr L
27 Reng Material m3 R
28 Dolken kayu galam Material btg D
29 Kawat Wiremesh M6Material roll K
30 Kawat Wiremesh M8Material lbr K
31 Kawat Wiremesh M7Material lbr K
32 Kawat Bendrat Material kg K
33 Kawat Duri Material kg K
34 Besi Beton Material btg B
35 Besi Beton Material btg B
36 Besi Beton Material btg B
37 Baja tulangan polos Material btg B
38 Besi Beton (polos) Material kg B
39 Besi Beton Material kg B

Page 1 Proyek Rumah Pak Fajar


ID Resource Name Type Material Label Initials Group Max. Units
40 Besi Strip Material kg B
41 Beton Ready Mix Material m3 B
42 Beton Ready Mix Material m3 B
43 Beton Ready Mix Material m3 B
44 Beton Ready Mix Material m3 B
45 Beton Ready Mix Material m3 B
46 Beton Ready Mix Material m3 B
47 Beton Ready Mix Material m3 B
48 Beton Ready Mix Material m3 B
49 Sewa Concrete PumpMaterial
≥ 40 m3 m3 S
50 Sewa Concrete PumpMaterial
≤ 40 m3 m3 S
51 Triplek Material lbr T
52 Multiplek Material lbr M
53 Plywood 9 mm Material lbr P
54 Pipa PVC 3/4" Material m. P
55 Pipa PVC 4" Material m. P
56 Pipa PVC Material btg P
57 Pipa PVC Material btg P
58 Pipa PVC Material btg P
59 Pipa PVC Material btg P
60 Pipa PVC Material btg P
61 Aspal Material kg A
62 Minyak Diessel/solarMaterial liter M
63 Minyak Tanah Material liter M
64 Minyak Bekisting Material liter M
65 Paku Triplek Material kg P
66 Paku Beton Material kg P
67 Paku 12 cm Material kg P
68 Paku 5-10 cm Material kg P
69 Paku Biasa Material kg P
70 Paku Ulin Material kg P
71 List kayu profil Material btg L
72 Ampelas Material lbr A
73 Bak Cat Material bh B
74 Kuas Roll Material bh K
75 Kuas Roll Material bh K
76 Kuas Material bh K
77 Kuas Material bh K
78 Kuas Material bh K
79 Kuas 2" Material bh K
80 Thinner Material klg T
81 Cat tembok interior Material klg C
82 Cat dasar precoat Material klg C
83 Cat Dasar Exterior Material klg C

Page 2 Proyek Rumah Pak Fajar


ID Resource Name Type Material Label Initials Group Max. Units
84 Meni kayu Material klg M
85 Plamir Material klg P
86 Cat penutup interior Material klg C
87 Cat penutup Material klg C
88 Cat penutup interior IIMaterial klg C
89 Cat Kayu / Besi Material klg C
90 Keramik Ukuran 40 xMaterial
40 cm box K
91 Keramik Ukuran 20 xMaterial
20 cm box K
92 Keramik Ukuran 20 xMaterial
25 cm box K
93 Genteng Metal Material m2 G
94 Nok genteng metal (model U) bh
Material N
95 GRC Material lbr G
96 Kunci pintu biasa Material bh K
97 Kunci pintu km Material set K
98 Engsel pintu stainlessMaterial
stell bh E
99 Engsel kupu-kupu Stainlees
MaterialStell bh E
100 Handle pintu Material bh H
101 Material set
Kunci Pintu Kayu Complete K
102 Kaca Bening Material m2 K
103 Closet Duduk Material set C
104 Bak cuci piring Material bh B
105 Kran air Material bh K
106 Seal Tape Material bh S
107 Floor Drain Material bh F
108 Waterpass Material sewa W
109 Paku kayu 1-2/5 cm Material kg P
110 Paku kayu 10 cm Material kg P
111 Paku kayu 12 cm Material kg P
112 Paku 5-12 cm Material kg P
113 Paku payung/seng 7 cm Material kg P
114 Paku payung/seng 10Material
cm kg P
115 Lem kayu Material kg L
116 Paku tripleks Material kg P
117 Sealanat Material tube S
118 Waterdrain Material bh W
119 Floordrain Material bh F
120 Bath tub Material unit B
121 Stop kontak Material bh S
122 MCB Box Material bh M
123 MCB 6 A Material bh M
124 MCB 4 A Material bh M
125 Kabel NYM 3 x 2.5 Material m. K
mm2

Page 3 Proyek Rumah Pak Fajar


ID Resource Name Type Material Label Initials Group Max. Units
126 Isolasi Material bh I
127 Klem Material bh K
128 Pipa listrik 5/8" Material bh P
129 T Dus Material bh T
130 L Bow Material bh L
131 Rangka hollow Material m. R
132 Air Material ltr A
133 Aksesoris Material ls A
(perkuatan.las dll)
20 % material
134 Perlangkapan Material ls P
135 saklar tunggal Material m. s
136 mangkok saklar Material bh m
137 saklar double Material m. s
138 Bolham lampu 9 Material set B
watt
139 mangkok stop Material bh m
kontak
140 Galian tanah dalam sd Material m3 G
1m
141 Pasangan Urugan Material m3 P
pasir
142 Pasangan lantai kerja Material m3 P
beton tumbuk 1:3:5

143 Pipa PVC dia 4" Material m' P


144 Pipa PVC dia 1" Material m' P
145 Biofil Kap 10-15 orang Material bh B

Page 4 Proyek Rumah Pak Fajar


Std. Rate Ovt. Rate Cost/Use Accrue At Base Calendar Code
Rp142,800/hr Rp0/hr Rp0 Prorated Proyek Rumah Pak Fajar
Rp161,800/hr Rp0/hr Rp0 Prorated Proyek Rumah Pak Fajar
Rp171,300/hr Rp0/hr Rp0 Prorated Proyek Rumah Pak Fajar
Rp152,300/hr Rp0/hr Rp0 Prorated Proyek Rumah Pak Fajar
Rp449,400 Rp0 Start
Rp515,200 Rp0 Start
Rp1,100 Rp0 Start
Rp385,000 Rp0 Start

Rp93,600 Rp0 Start


Rp321,000 Rp0 Start
Rp184,100 Rp0 Start
Rp101,700 Rp0 Start
Rp1,164 Rp0 Start
Rp2,380 Rp0 Start
Rp19,000 Rp0 Start
Rp6,420,000 Rp0 Start

Rp2,289,800 Rp0 Start


Rp2,289,800 Rp0 Start

Rp7,169,000 Rp0 Start


Rp7,169,000 Rp0 Start
Rp8,014,300 Rp0 Start
Rp6,420,000 Rp0 Start
Rp6,420,000 Rp0 Start

Rp2,450,000 Rp0 Start


Rp2,450,000 Rp0 Start

Rp189,000 Rp0 Start


Rp2,165,900 Rp0 Start
Rp9,100 Rp0 Start
Rp2,862,300 Rp0 Start
Rp829,300 Rp0 Start
Rp626,000 Rp0 Start
Rp21,400 Rp0 Start
Rp32,100 Rp0 Start
Rp43,300 Rp0 Start
Rp79,100 Rp0 Start
Rp119,600 Rp0 Start
Rp13,000 Rp0 Start
Rp13,000 Rp0 Start
Rp67,400 Rp0 Start

Page 5 Proyek Rumah Pak Fajar


Std. Rate Ovt. Rate Cost/Use Accrue At Base Calendar Code
Rp15,800 Rp0 Start
Rp1,379,400 Rp0 Start
Rp1,439,900 Rp0 Start
Rp1,506,500 Rp0 Start
Rp2,270,260 Rp0 Start
Rp1,621,400 Rp0 Start
Rp1,688,000 Rp0 Start
Rp1,827,100 Rp0 Start
Rp1,923,900 Rp0 Start
Rp60,500 Rp0 Start
Rp4,400,000 Rp0 Start
Rp72,800 Rp0 Start
Rp122,700 Rp0 Start
Rp95,800 Rp0 Start
Rp8,575 Rp0 Start
Rp68,700 Rp0 Start
Rp34,300 Rp0 Start
Rp52,200 Rp0 Start
Rp125,800 Rp0 Start
Rp220,900 Rp0 Start
Rp274,800 Rp0 Start
Rp14,400 Rp0 Start
Rp12,400 Rp0 Start
Rp13,500 Rp0 Start
Rp4,000 Rp0 Start
Rp27,300 Rp0 Start
Rp23,300 Rp0 Start
Rp30,700 Rp0 Start
Rp30,700 Rp0 Start
Rp30,700 Rp0 Start
Rp30,700 Rp0 Start
Rp44,100 Rp0 Start
Rp6,000 Rp0 Start
Rp35,200 Rp0 Start
Rp34,700 Rp0 Start
Rp39,500 Rp0 Start
Rp21,000 Rp0 Start
Rp17,400 Rp0 Start
Rp12,100 Rp0 Start
Rp10,500 Rp0 Start
Rp39,500 Rp0 Start
Rp157,400 Rp0 Start
Rp157,400 Rp0 Start
Rp151,100 Rp0 Start

Page 6 Proyek Rumah Pak Fajar


Std. Rate Ovt. Rate Cost/Use Accrue At Base Calendar Code
Rp56,300 Rp0 Start
Rp34,700 Rp0 Start
Rp185,600 Rp0 Start
Rp315,700 Rp0 Start
Rp142,800 Rp0 Start
Rp97,000 Rp0 Start
Rp69,200 Rp0 Start
Rp108,800 Rp0 Start
Rp111,900 Rp0 Start
Rp68,200 Rp0 Start
Rp40,000 Rp0 Start
Rp140,800 Rp0 Start
Rp57,500 Rp0 Start
Rp101,700 Rp0 Start
Rp61,400 Rp0 Start
Rp24,500 Rp0 Start
Rp246,100 Rp0 Start
Rp246,100 Rp0 Start
Rp200,100 Rp0 Start
Rp2,500,500 Rp0 Start
Rp1,702,700 Rp0 Start
Rp318,700 Rp0 Start
Rp6,300 Rp0 Start
Rp430,700 Rp0 Start
Rp2,000 Rp0 Start
Rp27,500 Rp0 Start
Rp17,500 Rp0 Start
Rp17,500 Rp0 Start
Rp35,000 Rp0 Start
Rp28,500 Rp0 Start
Rp35,000 Rp0 Start
Rp42,900 Rp0 Start
Rp22,000 Rp0 Start
Rp20,833 Rp0 Start
Rp70,000 Rp0 Start
Rp82,500 Rp0 Start
Rp1,750,000 Rp0 Start
Rp20,000 Rp0 Start
Rp548,000 Rp0 Start
Rp96,900 Rp0 Start
Rp89,400 Rp0 Start
Rp13,100 Rp0 Start

Page 7 Proyek Rumah Pak Fajar


Std. Rate Ovt. Rate Cost/Use Accrue At Base Calendar Code
Rp50,000 Rp0 Start
Rp1,300 Rp0 Start
Rp15,000 Rp0 Start
Rp6,000 Rp0 Start
Rp500 Rp0 Start
Rp12,700 Rp0 Start
Rp0 Rp0 Start
Rp10,160 Rp0 Start

Rp2,500,500 Rp0 Start


Rp500 Rp0 Start
Rp500 Rp0 Start
Rp500 Rp0 Start
Rp500 Rp0 Start

Rp500 Rp0 Start

Rp111,145 Rp0 Prorated

Rp156,778 Rp0 Prorated

Rp1,146,256 Rp0 Prorated

Rp68,700 Rp0 Prorated


Rp13,050 Rp0 Prorated
Rp500 Rp0 Prorated

Page 8 Proyek Rumah Pak Fajar