Try to shut the NHT unit in a control way with DSN from T006 (ln this moment H201
temperature will suddenly rise, so close the valve opening of Tlc 0223).
ii. Take Hz storage tank on line and start H2 generator.
iii. Decrease the H201 outlet
iv. By pass R-201when H201temp decreased down to L40oC
lf any sound observe in heater blower then try to adjust VFD accordingly
vi. Finally cool down reactor bed by sweeping with Hz
vii. lf K-301 is ready to run then again line up DSN to C201-D305-C-301 and again start
up the CRU section,