Professional Documents
Culture Documents
NDT Summary-Steam Turbine Inspection
NDT Summary-Steam Turbine Inspection
Scratch
5 Bearing #4
Upper v v PT = ACC. UT = ACC.
Lower v v PT = ACC. UT = ACC.
6 Thrust Bearing
T/S ( 8 pads ) v v PT = ACC ( pad#6 porous ). UT = ACC
7 MSV
Right v Found No Relevant Indication
Left v Found No Relevant Indication
Inspected by:Rudi Fuad/Ari Herdiana/Ali Akbar Chandra 1 of 5 Reviewed by: Aripin Tanjung
SUMMARY NDT WORK
SDTA STAR ENERGY GEOTHERMAL SALAK UNIT #400
8 Strainer
SBH #1
Upper
T/S
Blade # 1 v v Found No Relevant Indication
Blade # 2 v v Found No Relevant Indication
Blade # 3 v v Found No Relevant Indication
Blade # 4 v v Found No Relevant Indication
Lower
T/S
Blade # 1 v v Found No Relevant Indication
Blade # 2 v v Found No Relevant Indication
Blade # 3 v v Found No Relevant Indication
Blade # 4 v v Found No Relevant Indication
Upper
G/S
Blade # 1 v v Found No Relevant Indication
Blade # 2 v v Found No Relevant Indication
Blade # 3 v v Found No Relevant Indication
Blade # 4 v v Found No Relevant Indication
Lower
G/S
Blade # 1 v v Found No Relevant Indication
Blade # 2 v v Found No Relevant Indication
Blade # 3 v v Found No Relevant Indication
Blade # 4 v v Found No Relevant Indication
9 SBH #2
Upper
T/S
Blade # 5 v v Found No Relevant Indication
Blade # 6 v v Found No Relevant Indication
Blade # 7 v v Found No Relevant Indication
Lower
T/S v v Found No Relevant Indication
Blade # 5 v v Found No Relevant Indication
Blade # 6 v v Found No Relevant Indication
Blade # 7 v v Found No Relevant Indication
Upper
G/S
Blade # 5 v v Found No Relevant Indication
Blade # 6 v v Found No Relevant Indication
Blade # 7 v v Found No Relevant Indication
Lower
G/S v v Found No Relevant Indication
Blade # 5 v v Found No Relevant Indication
Blade # 6 v v Found No Relevant Indication
Blade # 7 v v Found No Relevant Indication
Inspected by:Rudi Fuad/Ari Herdiana/Ali Akbar Chandra 2 of 5 Reviewed by: Aripin Tanjung
SUMMARY NDT WORK
SDTA STAR ENERGY GEOTHERMAL SALAK UNIT #400
10 Strainer
SBR #1
Upper
Turbine Side v v Found some crack, FOD and others
#1 = 1 crack #5 = 1 crack
#4 = 1 crack
SBR #1
Lower
Turbine Side v v Found some crack, FOD and others
Inspected by:Rudi Fuad/Ari Herdiana/Ali Akbar Chandra 3 of 5 Reviewed by: Aripin Tanjung
SUMMARY NDT WORK
SDTA STAR ENERGY GEOTHERMAL SALAK UNIT #400
11 SBR #1
Upper
Generator Side v v Found some crack, FOD and others
#22#25
= 1=crack #26 = 1 crack #28 = 1 crack
1 crack
Inspected by:Rudi Fuad/Ari Herdiana/Ali Akbar Chandra 4 of 5 Reviewed by: Aripin Tanjung
SUMMARY NDT WORK
SDTA STAR ENERGY GEOTHERMAL SALAK UNIT #400
12 SBR #1
Lower
Generator Side v v Found No Relevant Indication
13 SBR #2
Upper
T/S v v Found No Relevant Indication
Lower
T/S v v Found No Relevant Indication
Upper
G/S v v Found No Relevant Indication
Lower
G/S v v Found No Relevant Indication
Inspected by:Rudi Fuad/Ari Herdiana/Ali Akbar Chandra 5 of 5 Reviewed by: Aripin Tanjung