Quality of Construction mainly depend upon

1) Construction Materials
2) Quality of Workmanship

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Quality of Material to be Assured & Control by

Control of Incoming Materials by inspection procedure:

 Submission of approved product (Material) Catalogues, Broucher with Technical


Information
 Submission of Material’s “CHALLAN” mentioning Lot no, Make/Brand, Type, Grade,
Qty, etc.
 Checking of Manufacture Testing Certificate (MTC) as per received materials on site
based on Lot no, Make, etc.
 Maintain Material Register regularly.

Lay down Testing Procedure:


Materials Sampling Frequency
 As specified in I.S. Codes, MORTH, IRC OR
 As specified in Specifications or as per Project requirements (with consultation of
Architect, PMC/Consultants, Contractor)

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Acceptance Criteria / Limits of Construction Materials


 As specified in I.S. Codes, MORTH, IRC OR
 As specified in Specifications (Ex. Fly Ash materials in RMC not more than 25 % +
1% of total Cement + Fly Ash materials)

Materials Testing & Record Keeping Procedure:


 All Construction Materials require to be tested according to QAP frequency prior to
execution of work
 Sampling procedures are follow as per I.S. Codes
 Samples of Material must be taken in presence of PMC Engineer
 Use “Sample Card” for Sampling & Record purpose
 Carrying out Calibration of Laboratory Equipment prior to test
 Samples should be tested in Approved Laboratory only
 Adopt Testing Methodology as per I.S. Codes while material testing
 Require Laboratory Testing Report (LTR), Mix Design Report in specific format with
comments: Accepted or Not Accepted

IFCI Infrastructure Development Ltd


Quality Assurance Plan

 Recommendations & Approval of materials to be issue by respective Authorities


 Remove materials immediately from site, if not Approved

Major Construction materials require to be test:


Water
Cement
Fine Aggregate (Sand)
Coarse Aggregates (Metal, Kapchi, Grit)
Bricks
Reinforcement Steel
Concrete Cube
Ready Mix Concrete
Precast Concrete Blocks
Terrazzo/Mosaic Tiles, Vitrified Tiles
Precast C.C. Paver Block
Seasoned & Chemical Treated Wood
IFCI Infrastructure Development Ltd
Quality Assurance Plan

Details of Sampling Frequency, Acceptance Criteria as per I.S.


Codes
Go To Sampling, Acceptance (3.1)

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Sample Card & Testing Formats:


A. Sample Card (8.3)

B. Testing Formats
Tests on Cements: Test on Water

1) Initial & Final Setting Time (TF C-4) 1) Chemical Analysis (TF W-1)

2) Compressive Strength of Cement (TF C-5)


Tests on Bricks:

Tests on Fine Aggregate 1) Water Absorption (TF BK-2)

1) Fineness Modulus (TF A-1) 2) Compressive strength (TF BK-3)

2) Silt Content (TF A-3) 3) Efflorescence (TF BK-4)

Tests on Coarse Aggregate Tests on Concrete

1) Gradation Analysis (TF A-4) 1) Compressive Strength (TF CO-1)

2) Aggregate Impact Value (TF A-6) 2) Slump Test TF CO-2)

3) Flakiness & Elongation Index (TF A-8)

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Quality of Workmanship to be Assured & Control by

Workmanship, Inspection & Record Keeping Procedure:

 Require detailed study of Drawings, Technical Specifications, Methodology as well


as knowledge of I.S. Codes prior to work
 Construction must be executed as per drawings (Good for Construction) & as per
Technical Specifications
 Perfection require in Line, Level, Plumb, Mixing, Compacting, Position & size of
Cover, Curing, De-Shuttering period/ Good Construction practice for achieving
Quality of Workmanship
 Request For Inspection (RFI) to be issue prior to execution for inspection of work
 List out Audit points, Remarks & Giving necessary Guidelines to agency
 Status of Compliance of Audit point

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Request for Inspection (RFI) Format:


Go to RFI (8.6)

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Checklists for various Construction Activities, Pour Card System:

 Checklists procedure in specific frequency implement for assuring the quality of


Workmanship
 Use “Pour Card” for controlling Concrete work.
 Strict execution, Technical Meeting/Discussion require by PMC team for controlling
quality

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Checklists for Various Construction Activities:


A. Activity Checklist
1. Excavation Work (CF -2)
2. Brick Masonry Work (CF-7)
3. Form Work (CF-9)
4. Reinforcement Work (CF-10)
5. R.C.C. Work – Pre Construction (CF-11)
6. R.C.C. Work – During Construction (CF-12)
7. R.C.C. Work – Post Construction (CF-13)
8. Plaster Work (CF-18)
9. Flooring Work (CF-20)
10. Painting – Cement Paint (CF-33)
11. Plumbing & Sanitary Work (CF-39)
12. Social Management (6.1)
13. Environment Management (6.2)
14. Safety (6.3)

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Format – Pour Card for Concrete Work:


Go to Pour Card (8.4)

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Dealing with Non Conforming Product:

 Issuing Non Conforming Report, if Materials are not conforming to I.S. Acceptance
limit
 issuing Non Conforming Report, if Construction Activities are not conforming to
Specifications, Drawings
 Remedial measures recommendation
 Closing the NCR by Rectification & Checking of Non Conforming Product

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Format – Non Conforming Report / Note:


Go to NCR (4.3)

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Reporting & Controlling Procedure:

 Reporting on construction activities carried out for construction - Checklists, Pour


Cards
 Reports on technical Audit, NCR, Recommendation, Approval
 Minutes of Meeting (MOM), Daily Progress Report (DPR) for routine work
 Progress Report in Each Month including Testing details, NCR details, Progress of
Work, Audit Points, etc

IFCI Infrastructure Development Ltd


Quality Assurance Plan

Other Format – Drawing Register, MOM, DPR:


Go to Drawing Register (8.1)
Go to MOM (8.2)
Go to DPR (8.5)
Go to Final Checking & Hand over Site (7.3)