Professional Documents
Culture Documents
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
DE EXT IFI I
Eng. Phase Purpose Of Distribution (POD) Purpose Of Issue (POI) Owner's Action
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 1 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
1
2
3
4
5
6
7
8
9
10
11
12
13
14
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 2 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
1. Purpose 4 4 هــدف.1
2. Scope 4 4 محدوده کاربرد.2
3. Definitions 4 4 مفاهیم و اختصارات.3
4. HSE Requirements 6 6 بهداشت و محیط زیست، الزامات ایمنی.4
5. Responsibilities 6 6 مسئولیت ها.5
6. Safety in Workshops 8 8 ایمنی در کارگاه های ساخت.6
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 3 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
1. Purpose هــدف.1
It is to describe a minimum Health, Safety and تشریح حداقل،هدف از تدوین و برقراری این دستورالعمل
Environment (HSE) requirements in line with ایمنی و بهداشت شغلی می باشد که در،الزامات محیط زیست
PIDEC’s Integrated Management System (IMS) راستای تعهدات سیستم مدیریت یکپارچه شرکت طراحی و
which shall be considered by all vendors,
مهندسی صنایع پتروشیمی کلیه سازندگان پروژه ملزم به
manufacturers and subcontractors.
.رعایت آنها می باشند
- Accident: : حادثه-
Undesired event giving rise to death, ill health, عبارت است از یک اتفاق یا واقعه ناخواسته که منجر به
injury, damage or other loss. . صدمه یا سایر خسارات می گردد، جراحت، بیماری،مرگ
- Incident: : رویداد-
Work –related events in which an injury or ill عبارت از یک رخداد یا اتفاق که منجر به حادثه شده و یا
health (regardless of severity) or fatality .پتانسیل ایجاد حادثه را داشته باشد
occurred, or could have occurred.
- Risk: : ریسک-
Combination of the likelihood of an occurrence
ترکیبی (یا تابعی) از احتمال و پیامدهای ناشی از وقوع یک
of a hazardous event or exposures and the
.خطر و یا وضعیت مخاطره آمیز
severity of injury or ill health that can be caused
by the event or exposures.
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 4 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
- Personnel: : کارکنان-
Refers to all workers, trainees, engineers, سرپرست ها، کارآموزان، مهندسان،کلیه افراد اعم از کارگران
supervisors, managers of .و مدیران کارگاه های سازنده را کارکنان می گویند
vendors/manufacturers.
This procedure shall be considered as a حفاظت قانون کار،این رویه مکمل کلیه مقررات ملی ایمنی
supplementary of any other HSE statutory and law و بهداشت محیط کار (در ایران) می باشد و سازنده متعهد
of the vendor's country and vendor shall be obliged است از قوانینی که در این دستورالعمل به آنها اشاره نشده
to follow and consider them wherever applicable.
.است نیز پیروی نماید
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 5 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
4.1. Vendor shall have a documented HSE policy بهداشت و محیط، سازنده می بایست یک خط مشی ایمنی1-4
and shall ever try to execute it.
زیست مکتوب و مشخص داشته باشد و همواره در جهت
.پیاده سازی و اجرای آن تالش نماید
4.2. Vendor shall establish an HSE management بهداشت و، سازنده بایستی از یک نظام مدیریت ایمنی2-4
system with respect to the field of its services محیط زیست متناسب با نوع فعالیت و بر اساس مقررات و
according to the applicable statutory and laws. .الزامات ملی برخوردار باشد
4.3. Vendor shall submit HSE accidents reports سازنده در صورت درخواست نماینده خریدار ملزم به ارائه3-4
and statistics along with its analysis whenever زیست، ایمنی،آمار و ارائه گزارش حوادث بهداشت شغلی
requested by purchaser. .محیطی و همچنین تجزیه و تحلیل حوادث می باشد
4.4. Vendors shall quickly inform the purchaser any سازنده همچنین ملزم به ثبت و اطالع رسانی سریع در4-4
Serious events such as result to death of مورد حوادث حاد از قبیل حوادث منجر به فوت و آلودگی
personnel and extensive environmental pollution. .های زیست محیطی وسیع به نماینده خریدار می باشد
5.1. Vendor is responsible to consideration of all ، سازنده مسئولیت دارد ضمن رعایت کلیه مقررات ایمنی1-5
healthy, safety and environmental regulations
بهداشت شغلی و محیط زیست مشمول موارد و اقالم
related to the purchased items and train and
فرآیند اطالع رسانی و آموزش کارکنان را بنحوی،سفارش
inform all concerning personnel so that they
مدیریت نماید که آنها قادر به اجرای الزامات ایمنی و
can perform all HSE requirements during
بهداشت حرفه ای در حین ساخت و تامین اقالم مورد
fabrication and manufacturing.
.سفارش باشند
5.2. Vendor is responsible for HSE management بهداشت شغلی و محیط، مسئولیت مدیریت سیستم ایمنی2-5
system during supply of material, shop
ساخت تا تحویل بر حسب،زیست در حوزه های تامین
fabrication till delivery of products according to
قرارداد (سفارش خرید) به عهده سازنده می باشد بنابراین
the purchase order requirements therefore
سازنده میتواند جلسات منظمی جهت افزایش اثر بخشی و
vendor may hold regular meeting to increase
،کارائی این سیستم برگزار نماید تا اهمیت مسائل ایمنی
performance and effectiveness of HSE
بهداشت و محیط زیست برای کلیه کارکنان مشخص
management system and specify importance
.گردد
of HSE for all concerning personnel.
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 6 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
5.3. Vendor's safety representative is responsible بهداشت شغلی و، مسئولیت نظارت بر جنبه های ایمنی3-5
محیط زیست کارکنان خریدار بر عهده نماینده ایمنی
for purchaser’s personnel HSE aspects.
.سازنده می باشد
5.4. Vendor should not tolerate any undesirable سازنده نباید عملکردهای ضعیف کارکنان را تحمل نماید و4-5
performance and in case of deviation of HSE
،در صورت عدم رعایت مقررات و دستورالعمل های ایمنی
regulations, fabrication may be stopped till
کار باید در صورت لزوم،بهداشت شغلی و محیط زیست
corrective and preventive action to be
متوقف شده تا اقدام اصالحی و پیشگیرانه بدرستی اجراء
executed.
.گردد
5.5. In case of sub-contract the purchased items to ، در صورت ارجاع کار به سازندگان فرعی صالحیت دار5-5
the sub-vendors in part or whole, the primary سازنده موظف است همواره مراقبت الزم را بعمل آورد تا
vendor is responsible to ensure that all کلیه پرسنل موثر در فرآیند،اطمینان حاصل گردد که
concerning personnel have been informed and
تامین و یا ساخت تجهیزات از آگاهی و آموزش الزم نسبت
or trained for all HSE requirements and
بهداشت شغلی و محیط زیست و،به الزامات ایمنی
respective instructions.
همچنین مقررات و دستورالعمل های مربوطه برخوردار
.میباشند
5.6. Under any circumstances vendor shall not تحت هیچ شرایطی نباید به کارکنان وظایفی واگذار گردد6-5
assign any work to the personnel who have آموزش کافی را فرا نگرفته،که برای انجام ایمن و مؤثر آن
not been well trained for doing the work safely .باشند
and effectively.
5.7. Vendor is responsible to make available any سازنده موظف است کلیه وسائل حفاظت فردی و یا7-5
Personal Protective Equipment (PPE) which is متناسب با نوع فعالیت را برای کارکنان فراهم،جمعی
required for performing the job. .نماید
5.8. Vendor is responsible to take on time first aid سازنده مسئولیت دارد در صورت بروز هرگونه حادثه برای8-5
actions against any accident which occurred
خریدار و یا بازرسین،بازدیدکنندگان و نمایندگان کارفرما
for purchaser and client
ضمن انجام،شخص ثالث در زمان حضور در محل سازنده
visitors/representatives and/or third party
درخصوص اطالع،اقدامات امدادرسانی درست و بموقع
inspectors when they are in the vendor's
.رسانی به خریدار اقدام نماید
premises and immediately report to the
purchaser office.
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 7 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
5.9. Vendor is also responsible for performing سازنده همچنین مسئول انجام قرارداد با توجه به اثرات9-5
contract with respect to the side effects on the
کاهش جنبه های مضر و،جانبی کار بر روی محیط زیست
environment, reducing the harmful aspects of
.اعالم صریح پیامدهای زیست محیطی به خریدار می باشد
the environmental and notifying the
Environmental consequences to purchaser.
6.1. The introduction of the vendor's safety معرفی مسئول ایمنی سازنده1-6
responsible
While introducing vendor's safety responsible, بایستی اطالعات الزم،ضمن معرفی مسئول ایمنی سازنده
the essential information about safety در خصوص هشدارهای ایمنی شامل مقررات ایمنی و
warnings including safety laws and protection .حفاظت در اختیار نمایندگان و بازدیدکنندگان قرار گیرد
shall be available to visitors and
همچنین با توجه به میزان دانش بازدیدکننده و یا برنامه و
representatives. Also based on visitor’s
در صورت لزوم آموزش وطرز استفاده از،مدت بازدید
knowledge, visiting plan & schedule, if
وسایل ایمنی و سایر نکات مربوطه به ایشان ضروری
required the instruction and application of
.میباشد
safety devices and other important related
points shall be instructed.
6.2. To specify safe routes مشخص نمودن مسیر ایمن رفت و آمد2-6
Shortest routes are not always safe due to با اینکه کوتاه ترین مسیر برای رسیدن به مکانهای مورد
existence of some known and unknown risks. مسیر مستقیم است اما مواقعی بعلت وجود مخاطرات،نظر
Therefore, in these cases, threatening risks for لذا در این. امکان ترددهای مستقیم وجود ندارد،و موانع
safety and health shall be identified and بایستی موانع و مخاطراتی که ایمنی و سالمت،گونه موارد
notified to personnel, representatives and نمایندگان،را تهدید می کنند شناسائی و به اطالع کارکنان
visitors. If it is inevitable; necessary safety و بازدیدکنندگان رسانده شود و در صورت غیر قابل اجتناب
precautions shall be considered while entering بودن باید با تمهیدات ایمنی به آن منطقه وارد شد بنابراین
to those places. Hence the safest routes shall الزم است که ایمن ترین مسیرهای رفت و آمد به فضای
be shown to the visitors.
.مورد بازدید به بازدیدکنندگان شناسانده شود
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 8 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
6.3. to specify insecure areas and situations مشخص نمودن مناطق و شرایط ناایمن3-6
Insecure situations such as risk of falling گاهی نمایندگان و بازدیدکنندگان ناگزیر به ورود یا قرار
objects or environmental pollutants and بنابراین ضروری است،گرفتن در شرایط ناایمن خواهند بود
respiratory, incendiary or explosive materials, ،که مناطق و شرایط ناایمن همچون خطر سقوط اجسام
falling from a height and etc. shall be notified
وجود مواد آتش زا،خطرآالینده های محیطی و یا تنفسی
to representatives and visitors. If they are
سقوط از ارتفاع و هر نوع مخاطرات ممکن،یا منفجره
inevitable to be in these situations therefore
دیگر برای بازدید کننده شناسانده شود تا از تردد در آن
they shall be instructed and equipped with
مکان ها بدون هماهنگی و تمهیدات الزم خودداری نمایند
safety tools and devices.
پس از،و در صورت لزوم به عبور یا توقف در آن اماکن
آموزش و مجهز شدن به وسایل ایمنی مرتبط به آن مکانها
.وارد شود
6.4. Safety training proportionate to kind of آموزش ایمنی متناسب با نوع بازدید و4-6
visits مخاطرات مکان بازدیدکننده
Following safety instructions and training shall حداقل موارد ایمنی زیر بایستی در بازدیدها مورد توجه قرار
be considered as a minimum during the visits گیرد هرچند خطرات و تهدیدها به نوع بازدید بسیار بستگی
however based on risks and threats, safety .دارد
trainings can be different.
- To specify exit routes and alarm مشخص نمودن مسیرهای خروج و آژیر اضطراری-
If an event like fire, leaking toxic gases and something
بدیهی است در صورت ایجاد حادثه در محیط مثل آتش
like that occurs, the best action is to get away from بهترین عمل دوری از، نشت بخارات سمی و نظایر آن،سوزی
event and fast evacuation for establishment of حادثه و تخلیه سریع منطقه برای استقرار نیرو و تجهیزات امداد
reinforcement troops. Therefore, warning and alarm بنابراین الزم است که آژیر و زنگهای خبر دهنده مواقع.است
bells for emergency situations and exit routs shall be
.اضطراری و راههای خروجی به بازدیدکننده شناسانده شوند
notified to the visitor.
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 9 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
- Method of using safety tools and devices نحوه استفاده از وسائل و تجهیزات ایمنی-
If safety tools and equipments be used properly, وسائل و تجهیزات ایمنی با توجه به نوع بازدید و مخاطرات
are efficient and depend on type of visits and احتمالی متفاوت بوده و میتواند شامل وسائل شخصی مثل
probable hazards, are different. These کاله و لباس ایمنی یا وسائل عمومی، کفش،ماسک تنفسی
equipments are inclusive of personal protective
این وسایل و تجهیزات در،مثل کپسول اطفاء حریق باشد
equipment & tools such as breathing mask,
صورتی کارآیی الزم را خواهند داشت که به موقع و صحیح
shoes, safety hat and clothes or general items
بنابراین پیش از ورود بازدیدکننده به مناطق.استفاده شوند
such as fire fighting capsules. Therefore, visitors
به،پرخطر الزم است آموزش استفاده صحیح و بموقع از آنان
shall be trained before entering to hazardous
.وی داده شود
areas.
- The ways to prevent heat-stroke or frostbite روش های جلوگیری از گرما یا سرمازدگی-
Visitors that ought to be in places with high or low ،الزم است به بازدیدکنندگانی که در طول مدت اقامت مجبورند
temperature, for a long time, shall be trained for ،زمان طوالنی را در اماکن با درجه حرارت باال یا پایین بمانند
prevention of heat stroke or frostbite. .آموزش الزم برای جلوگیری از گرما یا سرمازدگی داده شود
All Personnel Protective Equipments(PPE) and کلیه وسایل وتجهیزات ایمنی بایستی دارای حداقل
safety tools and equipments should have at least
:مشخصه های زیر باشند
below specifications:
Standard stamp and/or international approvals دارای مهر استاندارد ویا تائیدیه های بین المللی
Safe and sound and compatible with environment سالم و متناسب با مخاطرات محیط
hazards تاریخ استفاده از آن منقضی نشده باشد
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 10 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
Easy to use and not to cause inconvenience while سهولت در استفاده و عدم ایجاد مزاحمت در حین کار
working موجب بروز اثرات سوء ثانوی نگردد
Not to cause secondary negative effects
پوشاک ایمنی هم سایز بازدیدکننده بوده و قبالً توسط شخص
Safety cloths to be in size of visitor and already
.دیگری استفاده نشده باشند
have not been used by others
It is clear that each Personnel Protective بدیهی است هر یک از لوازم ایمنی که تاریخ انقضاء آن رسیده یا
Equipments (PPE) and safety tools that reach ً باید سریعا، مستعمل و غیر کارآمد شده باشد،به هر دلیل معیوب
expire time or with any cause is defected, used and .تعویض گردند
not efficient, should be replaced very soon.
Personnel Protective Equipments & Safety Tools: :وسائل ایمنی شخصی و عمومی می توانند شامل موارد زیر باشند
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 11 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 12 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 13 of 14
EPs Contractor: ZANJAN UREA FERTILIZER PROJECT Owner:
Petrochemical
Industries Design &
Engineering Company Project HSE Requirements Manual
(PIDEC)
Project No. : 1231 Doc. No.: 1231-DE-00-QA-MNL-002 Rev.: 00 Project No. : 214
This document with all its rights is the property of ZAFIC and must be held in confidence. No disclosure,
reproduction or other use of the document in whole or parts is to be made without the prior consent of ZAFIC Page 14 of 14