You are on page 1of 4

CEBU INSTITUE OF TECHNOLOGY

UNIVERSITY
N. Bacalso Avenue, Cebu City,
Philippines

COLLEGE OF ENGINEERING AND ARCHITECTURE

A Research Paper in

Presented to the Faculty of Industrial

Engineering Department Cebu Institute of

Technology - University, Cebu City,

Philippines

In Partial Fulfilment

Of the Requirements for the course

IE262 METHODS ENGINEERING

By

BARTE, KENT JAY


BOLO, SHIRAVA KOLIA CELESTINE
MORALES, MARARET PEARL
POTOT, GERMALYN
TOMINES, FRANCHESKA FAYE

May 2021
WORK INSTRUCTION

a. Workstation Layou

Elements
1 Get plastic bottle and place on the refilling area.
2 Get funnel and insert to the bottle.
3 Turn on the water pump.
4 Fill the bottle with water.
5 Turn off the water pump
6 Remove the funnel
7 Place refilled bottle to sealing area.
8 Get bottle cap for sealing
9 Place finished output to storage

MTM-1 Methods Analysis


LEFT HAND RIGHT HAND
1. Get plastic bottle and place on the refilling 16.4
area.
a. Get plastic bottle
Reach – 15 inches to bottle
R14A 14.4
storage for an empty bottle
Grasp – Pick up empty bottle G1A 2.0
b. Place to refilling area.
Move – Move empty bottle to
M14C 16.9
refilling area 18.9
Release – Open fingers to
RL1 2.0
release bottle
2. Get funnel and insert to the bottle.
c. Get funnel
reach R3A 5.3
grasp G1A 2.0
d. Insert to bottle
move M3C 6.7
position P1S 5.6
release RL1 2.0
3. Turn on the water pump
reach R
Apply pressure APA 10.6
4. Fill the bottle with water
5. Turn off the water pump

6. Remove the funnel


Get funnel
Reach
Grasp
Return funnel
move
release
7. Place refilled bottle to sealing area
Get bottle
Reach
Grasp
Move
Hold bottle 8. Get bottle cap for sealing
Get bottle cap
reach
grasp
move
position
Seal the bottle

9. Place finished output to


storage

You might also like