TRUE or FALSE. Write the word TRUE if the statement is correct and write the word
FALSE if the statement is wrong.
_______1. The Department of Environment and Natural Resources issues a permit to cut trees.
_______2. The person who has the authority to relocate the bounderies of the costruction when
there is no existing reference point is the geodetic engineer.
_______3. Determining the building set back from the road line is not necessary.
_______4. The site of the construction must be securely fenced to protect the construction
activities.
_______5. Allocating a space for warehousing, workers’ quarter and construction office is not
usually required in the construction.
Multiple choice: Choose the letter of the correct answer.
1. A type of authorization that must be granted by a government or other regulatory
body before the construction of a new or existing building can legally occur.
a. Fencing permit b. Building permit
c. Construction materials d. Tools and equipment needed
2. A personal protective equipment worn to lessen the noise in the
workplace.
a. Hearing protection b. Respirators
c. Foot protection d. Eyes and face protection
3. These must be worn as a last resort if it is not possible to ventilate the work area
properly.
a. Hearing protection b. Respirators
c. Foot protection d. Eyes and face protection
4. A tool used to test the horizontal levelness of the sufaces of material.
a. Plumb bob b. Nylon String
c. Spirit level or level bar d. Steel square
5. This is used to indicate the sides of the building.
a. Plumb bob b. Nylon String
c. Spirit level or level bar d. Steel square
6. A horizontal board placed when laying out a building.
a. Facia board b. Batter board c. Panel board d. None
7. What is the distance between the stakes in laying out a building?
a. 2 feet b. 3 feet c. 4 feet d. 5 feet
8. When constructing a different height of foundation, how do you set the
height of the batter board?
a. according to the height of shortest foundation
b. according to the average height of the foundation.
c. according to the height of the tallest foundation.
d. both A and C
9. The term used to mark stake for the batter board?
a. grade stake b. level stake c. stake d. All of these
10. Where do you start leveling for the batter boards?
a. center stake b. Between the corner and center stake
c. corner stake d. Both A and C

Fill in the blanks: Supply the blanks with the correct word or group of words to complete the
sentence.
PROCEDURE IN SETTING BATTER BOARD
A. Determine the___________ at any of the four corners of the proposed building, Set the stakes
at 0.75 to 1m away from the pre-determined building lines, preferably where the grade stake
is.
B. On one of the corners, drive a_________ as a high as the desired height of the foundation.
C. Drive in set of posts for the____________3 feet away from the corners and along the sides.
Drive in the posts firmly. Align these posts with a __________ .
D. Move the height of the foundation from the stakes to the___________of the batter board.
This is done by stretching a string, leveled with spirit level or level bar from the stake to the
post.
E. From the mark of this post, _____________a string going around the corners of the building
and passing at the side of the batter board posts.
F. Level this string with a____________. Stretch the string tight. Start_________________from the
corner stake where the height of the foundation is established. Re-check the levelness.
G. ________________batter board posts along the line just leveled. These marks are places for
the top of the batter boards.
H.________________ the batter boards in place, the straight side up and at the marks of the
posts.
Identification: Answer the following statement.
_______________1 What do you call the horizontal boards placed at the corners and at the sides
of
the projected building when final layout takes place?
_______________2. It is a flexible strip of metal provided with the scale and used for laying out
measurement.
_______________3. This protection is worn to protect the worker from radiation.
_______________4. What do you call to marked stake for the batter board?
_______________5. Where do you start leveling for the batter boards?

Prepared by: Jymaer T. Geromo


REPUBLIC OF THE PHILIPPINES
Department of Education
REGION XI
Schools Division of Digos City
GOMA NATIONAL HIGH SCHOOL
School ID: 301906
Napan, Brgy.Goma, Digos City

1st Quarter Summative Test


CARPENTRY 9

Test I:Read and understand the statements below. Write the letter of the
correct answer on a separate answer sheet.

1.It is accurately used to test the squareness of smaller objects.


a. crow bar b. spirit level c. steel square d. try square
2,It is a testing tool used to check the vertical alignment of the form
installation.
a.chalkline b. plumb bob c. spirit level d. steel square

3,It is the most commonly used material in constructing forms.

a.G.I. sheet b. plyboard c. plywood d. T & G

4.It is a tool used to make long straight line on a surface.

a.chalkline b. crow bar c. pencil d. spirit level

5.These are the head coverings used for personal protection.


a.gloves b. hard hats c. safety belts d. safety shoes

6. It is a wide leather strap with hook used as a protection of an


individual from accidental fall.
a.gloves b. safety belt c. safety hat d. safety shoes
7. It is the darkening of the wood due to overheating by the machine knives
a. burn b. pitch c. split d. twist
8.It is a wood defect that is caused by rapid drying.
a.bow b. checks c. cup d. split
9.It refers to a head cover safety protection, usually made of hard
plastic.
a.cap b. helmet c. overseas cap d. visor
10.Mechanical properties of wood include .
a. elasticity b. strength c. variation characteristic d. all of these
Test II: Identify the following materials, tools, and equipment
1. 2.

3. 4.

DRAFT
B.Identify the different wood defects as shown below.

1. 6.

2.
7.

DRA
3. 8.
DRAF
A. Assume that you are a carpenter assistant. Prove that you
can recall the appropriate tools, materials, and equipment in
the following activities.
1. Laying-out dimensions on plywood and lumber. (At least 4)
a.
b.
c.
d.
2. Cutting plywood and stiffeners. (At least 4)
a.
b.
c.
d.

Prepared by: Jymaer T. Geromo


REPUBLIC OF THE PHILIPPINES
Department of Education
REGION XI
Schools Division of Digos City
GOMA NATIONAL HIGH SCHOOL
School ID: 301906
Napan, Brgy.Goma, Digos City
3rd
Quarter Summative Test
CARPENTRY 9
MULTIPLE CHOICE: Read the statement carefully. Choose the letter of the correct answer.

1. These materials are used for most formwork because it is high in quantity whereby
the material is easy to get.
a. Earth
b. Metal Panel
c. Timber and plywood
d. Plastic

2. These material is more economical than timber where repetitive work is necessary
a. Earth
b. Metal Panel
c. Timber and plywood
d. Plastic

3. These make the sheathing rigid and are generally made from 2 x 4 lumber.
a. Braces
b. Spacer
c. Supporters
d. Tie wire

4. It gives the forms stability.


a. Braces
b. Spacer
c. Supporters
d. Tie wire

5. Which of the following is not a member of formworks for column?


a. Rackers
b. Side & End Planks
c. Yoke
d. Nut & Bolts

ENUMERATION:

1. Explain the differences of using timber formworks from steel formworks (7 points).
1.
2.
3.
4.
5.
6.
7.
2.Enumerate at least three (3) in avoiding waste on construction materials used in fabricating
formworks.
1.
2.
3.
ENUMERATION:

1. What are the importance of formworks? Give at least 2


a.
b.
2. What are the factors influencing form designs? Enumerate at least 3
a.
b.
c.
3. What are the 2 results of loose forms?
a.
b.