Professional Documents
Culture Documents
DCC 20063
ENGINEERING SURVEY
TRAVERSE
FIELD WORK TITLE
NUR ZAFIRAH NABILAH BINTI SAIDON
( 03DKA20F1092 ) CRITERIA MARK
DISCUSSION
CONCLUSION
1
REPORT CONTENT
2
INTRODUCTION
N TOOLS QUANTITY
O
1 TOTAL STATION 1
2 PRISMATIC COMPASS 1
3 TRIPOD 1
4 HAMMER 1
5 PRISM 1
6 PICKET 4
7 FIELD BOOK/BOOKING FORM 1
TOTAL STATION
3
A TOTAL STATION IS AN OPTICAL INSTRUMENT COMMONLY
USED IN CONSTRUCTION, SURVEYING AND CIVIL
ENGINEERING. IT IS USEFUL FOR MEASURING HORIZONTAL
ANGLES, VERTICAL ANGLES AND DISTANCE — IT DOES THIS
BY ANALYZING THE SLOPE BETWEEN ITSELF AND A SPECIFIC
POINT.
TRIPOD
4
HAMMER
PRISM
PICKET
5
USED AS A SIGNALING TOOL TO SET UP A LEVELING TOOL.
3) THEORY
PRINCIPLES OF ELECTRONIC DISTANCE MEASUREMENT (EDM)
Λ=C/Ƒ
WHERE Λ = WAVELENGTH IN METERS
C = VELOCITY IN KM/S
Ƒ = FREQUENCY IN HERTZ (ONE CYCLE PER SECOND)
4.0 PROCEDURES
6
2. START WORK BY USING US PRISMATIC COMPASS AT FIRST STATION AND TO
GET DATUM VALUE.
7
7. FOCUS AND TARGET FIRST PRISM (BACK SIGHT)
8. MEASURE FOR BEARING, HORIZONTAL DISTANCE, VERTICAL ANGLES AND
SLOPE DISTANCE.
FIGURE 3 : STATION OF
IMMEDIATE SIGNIFICANCE
FIGURE 4: DIAGRAM OF
A TRAVERSE
8
4.2 PROCEDURES OF DETAIL PLAN
1
2
7 6
FIGURE 5: SHOWS AN AREA WHICH NEEDS TOPOGRAPHIC SURVEY. THERE ARE SOME OBJECT ILLUSTRATED IN
THAT FIGURE, SUCH AS STATION (A), BUILDING, LAMP POST AND TREE.
9
TRAVERSE FORMS
Fail No. : ________________ Figure in page :_______________
LINE
temperature
FROM TO VERTICAL ANGLE Distance Distance Ultimate
BEARING/ANGLE STN. SYN
STN (+/-) Straps distance
3 165°24’00” 345°24’00”
4 252°21’20” 4 250°00’00” 1 20.81
1 252°21’20” 72°21’20” (+2°21’20”)
10
LATITUDE AND DEPARTURE FORMS
DMD DMD
LATITUDE DEPARTURE COORDINATES
STATION BEARING DISTANCE (LATITUDE) (DEPARTURE)
N S E W N@S E@W
1 0.283 1.420 6.247 100.432
2 155°48’00” 20.81 M -18.981 8.530
DEPARTUR CORRECTI
LATITUD AND AFTER
E NG
1
2 155°48’00” 20.81 -18.698 7.110
11
PLOTTING
12
SKETCH SURVEY LOCATION
13
ANALYSIS
STATION :
AVG : P. KIRI + ( P.KANAN +@- 180 )
=156°23’00”( 336°23’20”- 180 )/ 2
= 156°23’00”
STATION 2 :
AVG : 72°22’40 ”
STATION 3 :
AVG : 345°24’20”
STATION 4 :
AVG : 252°21’20”
STATION 1= 2°21’20”/4
STATION 2 =1°10’40”
STATION 3 = 1°46’00”
STATION 4 = 2°21’20”
STATION 1= 155°48’00”
STATION 2 =71°12’00”
STATION 3 = 343°39’00”
14
STATION 4 = 250°00’00”
CONTOH :
C) B + 2+3
= 7.744 + 7.744 + 17.788
= 33.27
D) C+3–4
= 33.276 + 17.788 – 6.834
= 20.973
A ) D – 4-1
= 44.23 – 6.834 – 18.698
= 18.698
B) A -1 +2
=18.698 – 18.698 + 7.744
=7.744
15
DISCUSSION
16
CONCLUSION
17
LAMPIRAN
18
REFERENCES
1. LECTURER
2. HTTP://OCW.UTM.MY/FILE.PHP/249/5._UKUR_TERABAS.PD
F
3. HTTPS://AZLANPPD.TRIPOD.COM/T7C1005.PDF
4. HTTPS://CIVILTODAY.COM/SURVEYING/251-TRAVERSE-
SURVEYING
5. HTTPS://WWW.YOUTUBE.COM/WATCH?V=MBFAYL-_AX4
6. HTTPS://WWW.SLIDESHARE.NET/FARAHSHAM/SITE-
SURVEYING-TRANSVERSING
19