Professional Documents
Culture Documents
1 2 3 4 5
6 7 8 9 10
11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
26 27 28 29 30
Prepared By:
TIME OF THE DAY
FAIR 11PM
12MN
1PM
10PM 2PM
CLOUDY
Project Engineer (Contractor)
31
1
2
31
N 3AM
Reviewed/Checked By:
9AM
9PM N 3PM
RAIN SHOWER
8PM 4PM
6
7PM A
M 5PM
HEAVY RAIN 6PM Project Engineer (PETRON)
DAY OF THE MONTH
WEATHER CHART
PROJECT NAME & LOCATION:
PETRON MATES STP
SLEX CANLUBANG, CALAMBA, LAGUNA
1 2 3 4 5
6 7 8 9 10
11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
26 27 28 29 30
Prepared By:
TIME OF THE DAY
FAIR 11PM
12MN
1PM
10PM 2PM
CLOUDY
Project Engineer (Contractor)
31
1
2
31 Reviewed/Checked By:
9AM N 3AM
9PM N 3PM
RAIN SHOWER
8PM 4PM
6
7PM A
5PM
HEAVY RAIN
M
6PM Project Engineer (PETRON)
DAY OF THE MONTH
WEATHER CHART
1 2 3 4 5
6 7 8 9 10
11 12 13 14 15
16 17 18 19 20
21 22 23 24 25
26 27 28 29 30
Prepared By:
TIME OF THE DAY
FAIR 11PM
12MN
1PM
10PM 2PM
CLOUDY
Project Engineer (Contractor)
31 1
31
2 3AM
Reviewed/Checked By:
9AM
9PM N 3PM
N
RAIN SHOWER
8PM 4PM
7PM 6
A 5PM
HEAVY RAIN 6PM
M
Project Engineer (PETRON)
DAY OF THE MONTH