You are on page 1of 7

DESIGN SHEET

PROJECT: Oil & Gas Supply Base at SPARK DOCUMENT NO DATE

CLIENT : Oilfields Supply Company Saudi CIV_CAL_1002


DESIGNED CHECKED SHEET REV.
TITLE: Rigid Pavement Design for Warehouses 1 0

Reference Calculations Output

1. INTENT
The document is prepared for the design calculation of Grade Slabs
in Warehouses

2. SCOPE
The design document is prepared for Grade Slabs(Concrete Slabs).
The document is prepared based on the following input documents :

3. Traffic Data
No. of Buildings having trucks during operation: 01
Estimated No. of truck per day per building : 5
No. of passes of Truck per day : 5 x 2 = 10 (back & forth) x 1 = 10 passes
No. of passes of Forklift per day : 15 x 2=30 (back & forth) x 1 = 30 passes

Vehicle Type Total Vehicle Single Axle Single Axle No of Passes


Load (t) load (t) load (Kips) per day
DESIGN SHEET
PROJECT: Oil & Gas Supply Base at SPARK DOCUMENT NO DATE

CLIENT : Oilfields Supply Company Saudi CIV_CAL_1002


DESIGNED CHECKED SHEET REV.
TITLE: Rigid Pavement Design for Warehouses 1 0

Reference Calculations Output


DESIGN SHEET
PROJECT: Oil & Gas Supply Base at SPARK DOCUMENT NO DATE

CLIENT : Oilfields Supply Company Saudi CIV_CAL_1002


DESIGNED CHECKED SHEET REV.
TITLE: Rigid Pavement Design for Warehouses 1 0

Reference Calculations Output


DESIGN SHEET
PROJECT: Oil & Gas Supply Base at SPARK DOCUMENT NO DATE

CLIENT : Oilfields Supply Company Saudi CIV_CAL_1002


DESIGNED CHECKED SHEET REV.
TITLE: Rigid Pavement Design for Warehouses 1 0

Reference Calculations Output


DESIGN SHEET
PROJECT: Oil & Gas Supply Base at SPARK DOCUMENT NO DATE

CLIENT : Oilfields Supply Company Saudi CIV_CAL_1002


DESIGNED CHECKED SHEET REV.
TITLE: Rigid Pavement Design for Warehouses 1 0

Reference Calculations Output


DESIGN SHEET
PROJECT: Oil & Gas Supply Base at SPARK DOCUMENT NO DATE

CLIENT : Oilfields Supply Company Saudi CIV_CAL_1002


DESIGNED CHECKED SHEET REV.
TITLE: Rigid Pavement Design for Warehouses 1 0

Reference Calculations Output


O21433-FT-13(Design Sheet)(Project Specific)

(i) The ‘designed’ and ‘checked’ columns of design sheet shall have the signature of the person
responsible for design & checking respectively.

# 000000Sensitivity: LNT Construction Proprietary

You might also like