Professional Documents
Culture Documents
DESIGN, ENGINEERING, BUILD AND COMMISSIONING OF 120 MLD CAPACITY SEWAGE TREATMENT PLANT IN
ZONE - II AT KODUNGAIYUR WITH SEQUENTIAL BATCH REACTOR (SBR) WITH POWER GENERATION FROM BIO-
GAS INCLUDING OPERATION AND MAINTENANCE FOR TEN YEARS AT CHENNAI.
CLIENT :
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD , CHENNAI- 600 002
TITLE :
NAME SIGN DATE
PRED GVG 18.01.2021 STRUCTURAL DESIGN CALCULATION OF RCC GAS HOLDER TANK FOR
CHKD VGA 18.01.2021 120 MLD STP AT KODUNGAIYUR-CHENNAI.
APPD VPS 18.01.2021
SIZE REV.
Doc.No 19_EPE-CHWSSB-STP-120MLD-GHT(RCC Part)-SDC-10
A4 0
Page 1 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Index ,
Page 2 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
1) Introduction:- ,
24.0M ID RCC tank has been provided with 22,5M ID Gas Bell as
per the process requirement to store Bio-Gas of 2580 Cum. The gas
bell moves up and down within 16 Nos of Guide columns. The RCC
tank is designed as circular tank with 16 Nos MC125 Guide channels
embedded in RCC wall for Gas bell vertical movement.
Page 3 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 4 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 5 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Refer Fig. 2(b), Page No.-3, IS 1893-Part 2 : 2014for the coefficients for, the heights
hi/h Impulsive Mass Ht. coefficient 0.375
hc/h Convective Mass Ht. Coefficient 0.510
hi*/h 1.250
hc*/h 1.250
Impulsive sewage Load hi 2.81 M
Convective sewage Load hc 3.83 M
hi*= 9.375 M
hc*= 9.375 M
Computation of Coefficients:- h/D 0.31
Refer Fig. 5, Page No.-5, IS 1893-Part 2 : 2014for the coefficients for the coefficients
Impulsive Mode coefficient, Ci 5.00
Convective Mode Coefficient, Cc 4.0
Computation of Time Periods:-
Impulsive mode time period is computed as per CL. 4.3.1.1, Page No.-4 of
IS 1893-2014 ( Part2)
Conc Grade 35 E= 5000x(sqrt(fck)) 29580.4 N/Sqmm
2.96E+10 N/M2
Mas Density 1019.368 Kg/M3
Wall thickness 300 mm
Average Ht (M) 7.500 Time Period, Ti 0.06 Sec.
Time Period for Convective mode :- as per CL. 4.3.2.2 (a) of IS:1893(Part-II)-2014
Tc= Cc x Sqrt(D/g)
Tc= 6.26 Sec
Design Horizontal Seismic Coefficients:-
Parameters as per DBR for Civil & Structural Works
Ah= Z/2 x I /R x ( Sa/g)
Z= Zone factor 0.16
Page 6 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 7 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
0.787
5.5470 5.510
Actual Adopted
Convective Hydrodynamic Pressure on Wall Refer
:- CL 4.9.2 (a) of IS 1893-Part 2 -2014
Convective pressure at wall Base Y=0
Qcw at Y=0
Page 8 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Cosh(3.674xY/D) , 1.0
Cosh(3.674xh/D) 1.735
Qcw= 0.3242
Pcw at y=0 1.0374 Kn/sqm
Qcw at Y=h
Cosh(3.674xY/D) 1.735
Cosh(3.674xh/D) 1.735
Qcw= 0.5625
Pcw at y=h 1.800 Kn/sqm
Equivalent Pressure:-
Refer CL 4.9.4 IS 1893-Part2 qc= 10.800 Kn/m
( Convective) Pressure top 1.5264 Kn/Sqm
Pressure bottom 1.354 Kn/Sqm
1.800 1.5264
1.0374 1.354
Actual Adopted
Pressure due to wall Inertia:- Refer CL 4.9.5 of IS 1893-Part 2 -2014
Pww (uniform) 0.615 Kn/sqm
Pressure due to vertical Excitation:- Refer CL 4.10.1 of IS 1893-Part 2 -2014
Time period vertical excitation 0.3
Sa/g 2.5
Ah=2/3x(Z/2xI/RxSa/g) 0.05
Pressure at base due to vertical ground acceleration 3.75 Kn/Sqm
Page 9 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
,
Resultant Hydrodynamic Pressure as per clause 4.10.2, Page-15 of IS:1893(Part-II)-2014
Max pressure at wall base :- Pr1 at h = 7.500 7.308 Kn/Sqm
Max Pressure at top service water Level:- Pr2 2.0727 Kn/Sqm
Wall is checked conservatively for UDL 7.5 Kn/sqm
under service condition
6) Design of The RCC Container Wall:-
Check for Ultimate Condition:-
a) Normal Condition:- ( Tank Full, Fixed at base )
Tank Full Condition:- H= 8.0 M
D= 24 M
For B,M higher Thickness T= 0.45 M
adopted H x H /( D x T ) 5.93
Say 6.00 M
Check for B.M at Base:-
Refer IS 3370- Part Table 10 for Coeffcient
B.M coefficient at base 0.0187
B.M at Base= M 95.74 Kn-M
D= 450 MM
d= 450-50-8 392 MM
Mu= 1.5 M 144 Kn-M
Mu/b/d/d 0.935 Mpa
Fe 500 Pt= 0.242 %age
Ast= 949 Sqmm/M
Min Pt 0.350 %age
Ast Min 788 Sqmm/M
Steel Required 949 Sqmm/M
Provided T12-180+ T12-180 1255 Sqmm/M
Pt Provided 0.320 %age
Page 10 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 11 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 12 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
D= , 350 MM
d= 450-50-6 294 MM
Mu= 1.5 M 40.248 Kn-M
Mu/b/d/d 0.466 Mpa
Fe 500 Pt= 0.120 %age
Ast= 353 Sqmm/M
Min Pt 0.350 %age
Ast Min 613 Sqmm/M
Steel Required 613 Sqmm/M
Provided T12-180 627 Sqmm/M
Steel Provided at bottom : T12-180 + T12-180 on Inner Face
T12-180 + T10-180 on Outer Face
Steel Provided in Span : T12-180 on Both Faces.
c) Service Water :- ( Tank Service, Fixed at base )
H= 8.0 M
D= 24 M
For B,M higher Thickness T= 0.45 M
adopted H x H /( D x T ) 5.93
Say 6.00 M
Check for B.M at Base:-
Refer IS 3370- Part Table 10 for Coeffcient
B.M coefficient at base Triang. 0.0187
Refer Table 10 B.M coefficient at base UDL 0.0000
B.M at Base= M 89.76 Kn-M
Check for Span B.M:- B.M Coefficient Triang. Load 0.0051
B.M Coefficient UDL Load 0.0000
B.M in Span M 24.480 Kn-M
Page 13 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
<< 0.2MM OK
Page 14 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
<<< 0.2 MM OK
Page 15 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
H= 8.0 M
D= 24.0 M
T= 0.35 M
H x H /( D x T ) 7.619
Say 8.0000
Tank Full case : Triangular Load 80 Kn/Sqm
UDL 0.0 Kn/Sqm
Ast. Provided
Ht Coeff Tr. Coeff Udl Force ( T)Force (Tu) Ast
Kn Kn Sqmm
T12-150 0.0H -0.015 0.985 -14.4 -21.60 0.00
T12-150 0.1H 0.096 0.996 92.16 138.24 317.79
T12-150 0.2H 0.208 1.088 199.68 299.52 688.55
T12-150 0.3H 0.324 1.024 311.04 466.56 1072.55
T12-150 0.4H 0.443 1.043 425.28 637.92 1466.48
T12-100 0.5H 0.564 1.064 541.44 812.16 1867.03
T12-100 0.6H 0.661 1.061 634.56 951.84 2188.14
T16-125 0.7H 0.697 0.997 669.12 1003.68 2307.31
T16-125 0.8H 0.621 0.821 596.16 894.24 2055.72
T12-150 0.9H 0.386 0.486 370.56 555.84 1277.79
Page 16 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 17 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
<< 0.2MM OK
Check For Crack width Hoop Force 594.5 Kn
Provided T12-100 Both Faces
<< 0.2MM
<< 0.2 MM OK
Page 19 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 20 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 21 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 22 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 23 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 24 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 25 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 26 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 27 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
B= , 1000 MM
Mu/b/d/d 0.821674 Mpa
Refer table 3 SP16,Fe 500 Pt= 0.2 %age
Ast= 388 Sqmm
Min. Pt for Section 0.35% Ast Min. 437.5 Sqmm
Required Ast 437.5 Sqmm
Provided at bottom T12-100
Ast Provided 565 Sqmm OK
Check for Shear Force :- Shear Force V = 62.59725 Kn
Ultimate Shear = 1.5 X V 93.89588 Kn
Shear Stress T 0.483999 Mpa
Pt provided 0.291237 %age
Refer table 61 SP16 Allowable Shear Stress Tc 0.4 Mpa OK
Design of section Vertical Span :-
B.M at Span = M 6.228357 Kn-M
Ultimate B.M = 1.5 x M 9.342535 Kn-M
D provided 250 MM
d= D-50-6 194 MM
B= 1000 MM
Mu/b/d/d 0.248234 Mpa
Refer table 3 SP16,Fe 500 Pt= 0.1 %age
Ast= 194 Sqmm
Min. Pt for Section 0.35% Ast Min. 437.5 Sqmm
Required Ast 437.5 Sqmm
Provided at span T12-200
Ast Provided 565 Sqmm OK
Design of section at Horizontal ends :-
B.M at ends = M 23.23269 Kn-M
Page 28 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 29 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 30 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 31 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 32 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
Page 33 of 34
Design, Engineering, Build and Commissioning of 120 MLD Capacity STP Doc.,No. Rev 0
PROJECT: in Zone II at Kodungaiyur with SBR, with Power Generation from Bio Gas 19-EPE-CHWSSB-STP-120MLD-
including Operation and Maintenance for Ten Years at Chennai. GHT(RCC)-SDC-10
Designed Checked Approved
TITLE: Structural Design Calculations of Gas Holding Tank ( RCC part)
VPS VGA VGA
This bracket supports supports the Steel Guide and bolts of the
Guides are anchored in the bracket.
Bracked Width Provided 550 MM
Depth Provided 900 MM
As such Guides will be sitting on the Main wall and bolts will be
anchored in the bracket. Cantilver span of the bracket from wall
face being only 0.25M. Nominal Steel is provided.
( In 550 Width) Steel Provided 6 Nos T16 1200 Sqmm
Stps Provided in 250 2 Nos T12
Design of Bracket BR2:-
( Reaction from Beam) Reaction on the Bracket 178.40 Kn
Max Cantilever 0.175 M
B.M 31.22072 Kn-M
b= 750 MM
D= 800 MM
d= 744 MM
Mu/b/d/d 0.112805 Mpa
Nominal 0.2%, Ast 1116 Sqmm
Provided 6 Nos T16 1200 Sqmm
Vu= 267.6062 Kn
Vu/d 3.596857 Kn/Cm
Refer Table 62 SP16 Provided T10 6 L 100 16.8 Kn/Cm
Capacity