Manpower Loading Plan for Construction

The document is a man power loading plan for an unnamed project with no client or main contractor specified. It outlines the various roles needed for the project under direct man power including civil work, electro-mechanical work, and commissioning with a total direct man power of 0 for March. It also lists project management roles with a total direct man power of 0 for March and an overall grand total man power of 0 for March. The plan is for the months of April through November 2021 with all roles projected to be 0.

Uploaded by

Angela Leonardo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
200 views4 pages

Manpower Loading Plan for Construction

The document is a man power loading plan for an unnamed project with no client or main contractor specified. It outlines the various roles needed for the project under direct man power including civil work, electro-mechanical work, and commissioning with a total direct man power of 0 for March. It also lists project management roles with a total direct man power of 0 for March and an overall grand total man power of 0 for March. The plan is for the months of April through November 2021 with all roles projected to be 0.

Uploaded by

Angela Leonardo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Man Power Load - Direct Work
  • Project Management Team
  • Planning Table

MAN POWER LOADING PLAN

Project Name:
Client:
Main Contractor:
Location:

Description Total Man Month


Mar

I. DIRECT 1. Civil Work


Substations
1 Foreman 0
2 Masonry 0
3 Welder + Assistant 0
4 Helper 0

Power Transmission
1 Foreman 0
2 Masonry 0
3 Helper 0
Sub Total 1 0 0

2. Electro-Mechanical Work
1 Foreman 0
2 Masonry 0
3 Welder 0
4 Helper 0
Sub Total 2 0 0
2. Commissioning
1 Foreman 0
2 Masonry 0
3 Welder 0
4 Helper 0
Sub Total 3 0 0

TOTAL DIRECT MAN POWER 0 0


I. DIRECT Project Management Team
1 Project Manager 0
2 Construction Manager 0
3 Commissioning Lead Engineer 0
4 Civil Supoervisor 0
5 Electro Mechanical Supervisor 0
6 Transmission Line Civil Supervisor 0
6 Transmission Line Stringing Supervisor 0
7 Public Relation (PR) 0
8 HSE Supervisor 0
9 QA/QC Lead Engineer 0
10 Material Control 0
11 Project Control 0
12 Project Admin 0
13 Driver 0

TOTAL DIRECT MAN POWER 0 0

GRAND TOTAL MAN POWER 0 0


LOADING PLAN

2021
Apr May Jun Jul Aug Sep Oct Nov

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

MAN POWER LOADING PLAN
Project Name:
Client:
Main Contractor:
Location:
Description
Total Man Month
Mar
I. DIRECT
     1. Civ
I. DIRECT
    Project Management Team
1 Project Manager
0
2 Construction Manager
0
3 Commissioning Lead Engineer
0
4 Civil Su
LOADING PLAN
2021
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0