You are on page 1of 8

A B C D E

6.00 5.00 5.00 5.00


2.50 0.98 0.25

WF1 WF1 WF1


C1F1 C1F1 C1F1 ARKAY ENERGY AND
1 INDUSTRIAL CORPORATION
C2F1 C2F1 C2F1 C2F1

1.45
C1F1

3.00
C1F1 C1F1

0.05
2

2.00
WF1

C1F1 C1F1 C1F1


3

1.40 1.35 3.25

3.00
STRUCTURAL PERSPECTIVE WF1

1 WF1 WF1 WF1


C2F1 C2F1 C2F1 C2F1

GENERAL NOTES:
1. ALL DIMENSION ARE SHOWN IN METERS UNLESS
NOTED OTHERWISE. FOUNDATION PLAN
2
2. MODIFICATION OF SECTION AND SIZES OF 1 : 40
STRUCTURAL MEMBERS SHALL NOT BE ALLOWED
UNLESS OTHERWISE APPROVED.
A B C D E No. Description Date
3. THE CONTRACTOR SHALL VERIFYALL 1 PERSPECTIVE
2 FOUNDATION PLAN
DIMENSIONS AND CONDITION AT THE SITE, AND 6.00 5.00 5.00 5.00 3 FRAMING PLAN
SHALL NOTIFY THE ENGINEER OF DISCREPANCIES
BETWEEN ACTUAL CONDITIONS AND INFORMATION 1
C1 TB1/B1 C1 TB2/B2 C1 TB3/B3

SHOWN ON THE DRAWINGS BEFORE PROCEEDING

TB11/B11
C3 C3 C3 C3
WITH THE WORK.
3.00

TB8/B8

4. IT SHALL BE THE CONTRACTOR'S

TB10/B10

B12

B12

B12

B12
RESPONSIBILITY TO PROVIDE ADEQUATE SHORING
AND BRACING FOR THE STRUCTURE FOR ALL 2
C1 C1

LOADS THAT MAY BE IMPOSED DURING


CONSTRUCTION. TB9/B9
TB7/B7
2.00

5. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY 3


TB4/B4 TB5/B5 TB6/B6

THE OWNER/OR THE ENGINEER OF ANY CONDITION C1 C1 C1

WHICH IN HIS OPINION MIGHT ENDANGER THE PROPOSED WAREHOUSE


B12

B12

B12

B12
STABILITY OF THE STRUCTURE OR CAUSE BUILDING
3.00

DISTRESS IN THE STRUCTURE.


FRAMING AND
C3 C3 C3 C3
FOUNDATION PLAN
4
Project number

Date 05 JULY , 2021


Drawn by Z.M.G
FRAMING PLAN Checked by

3
1 : 40
S-101

Scale 1 : 40
ARKAY ENERGY AND
INDUSTRIAL CORPORATION

No. Description Date

PROPOSED WAREHOUSE
BUILDING

BEAM AND COLUMN


SCHEDULE

Project number

Date 05 JULY , 2021


Drawn by Z.M.G
Checked by

S-102

Scale NTS
ARKAY ENERGY AND
INDUSTRIAL CORPORATION

No. Description Date

PROPOSED WAREHOUSE
BUILDING

TIE BEAM ELEVATION


AND SECTION

Project number

Date 05 JULY , 2021


Drawn by Z.M.G
Checked by

S-103A

Scale AS INDICATED
ARKAY ENERGY AND
INDUSTRIAL CORPORATION

No. Description Date

PROPOSED WAREHOUSE
BUILDING

TIE BEAM ELEVATION


AND SECTION

Project number

Date 05 JULY , 2021


Drawn by Z.M.G
Checked by

S-103B

Scale AS INDICATED
ARKAY ENERGY AND
INDUSTRIAL CORPORATION

No. Description Date

PROPOSED WAREHOUSE
BUILDING

BEAM ELEVATION AND


SECTION

Project number

Date 05 JULY , 2021


Drawn by Z.M.G
Checked by

S-103C

Scale AS INDICATED
ARKAY ENERGY AND
INDUSTRIAL CORPORATION

No. Description Date

PROPOSED WAREHOUSE
BUILDING

BEAM ELEVATION AND


SECTION

Project number

Date 05 JULY , 2021


Drawn by Z.M.G
Checked by

S-103D

Scale AS INDICATED
ARKAY ENERGY AND
INDUSTRIAL CORPORATION

10mm. DIA. HOR. RSB


@EVERY 3 LAYERS OF CHB
10mm DIA. HOR. RSB
@EVERY 3 LAYER OF CHB 5" THK. CHB.

10mm DIA.VER. RSB


@0.80m O.C

5" THK. CHB. 3-10mm. DIA. RSB

3-10mm. DIA. RSB

10mm. DIA. RSB. TRANSV. BARS No. Description Date


10mm. DIA. RSB TRNSV. BARS
SPACED @ 0.30m. O.C SPACED@ 0.30m O.C

PROPOSED WAREHOUSE
BUILDING

DETAIL ED PLAN AND


SECTION

Project number

Date 05 JULY , 2021


Drawn by Z.M.G
Checked by

S-104

Scale AS INDICATED
A B C D E

6.00 5.00 5.00 5.00

1
ARKAY ENERGY AND
3.00 INDUSTRIAL CORPORATION

2
2.00

C - PURLIN
3.00

C4X7.25

4
C - PURLIN
C6X13

ROOF FRAMING PLAN


1 No. Description Date
1 : 30 1 ROOF FRAMING PLAN
2 TRUSS DETAIL

PROPOSED WAREHOUSE
BUILDING

ROOF FRAMING
PLAN
TRUSS DETAIL AND PURLIN SPACING
2 Project number

1 : 15
Date 05 JULY , 2021
Drawn by Z.M.G
Checked by

S-105

Scale AS INDICATED