list of RFIs to be submitted for Riyadh lime stone, flush Kerb and interlock

S.NO ACTIVITY DESCRIPTION REQUIRED DOCUMENTS

NEED COOORDINATE SHEETS

1 EXCAVATION RFI APRROVED GENERAL LANDSCAPE DRAWINGS

APPROVED EXCAVATION CROSS SECTIONS

NEED APPROVAL OF EXCAVATION RFI(CODE B) PRIOR TO FDT

COMPACTION SURFACE PREPRATION


2 APRROVED GENERAL LANDSCAPE DRAWINGS
FDT 95%

APPROVED TYPICAL CROSS SECTIONS

NEED EXCAVATION RFI APPROVED CODE B COPY

3 INSTALLATION POLYTHENE SHEET APRROVED GENERAL LANDSCAPE DRAWINGS

APPROVED TYPICAL CROSS SECTIONS

NEED EXCAVATION RFI APPROVED CODE B COPY

4 CONCRETE BLINDING RFI APRROVED GENERAL LANDSCAPE DRAWINGS

APPROVED TYPICAL CROSS SECTIONS

NEED CONCRETE BLINDING,EXCAVATION APPROVED CODE B RFI

5 TOP OF BLINDING CONCRETE RFI APRROVED GENERAL LANDSCAPE DRAWINGS

APPROVED TYPICAL CROSS SECTIONS

NEED TOP OF BLINDING APPROVED CODE B COPY

6 INSTALLATION RFI APRROVED GENERAL LANDSCAPE DRAWINGS

APPROVED TYPICAL CROSS SECTIONS