Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

E. ITEM WISE TECHNICAL SPECIFICATIONS – CIVIL WORKS

Item No. 1
Dismentaling the existing structure like Footpath, kerb and other structure comprising of
masonry, cement concrete, steelwork, including tools, plants and scaffolding wherever
necessary, sorting the dismantled material, disposal of unserviceable material and stacking
the serviceable material with all lifts and leads and as directed by engineer in charge.
(A) RCC Work
(B) Rubble/Brick Masonary

1. The relevant specifications of MORT&H fifth revision clause 202 shall apply to this item &
directed by engineer in charge.
2. The item shall be measured in Sq.mt.
3. Rate shall be included all materials, labour, equipment etc. required to execute this item.

Item No. 2
Dismantling of any type of kerb / Divider (Taking out existing kerb/ divider including removal
of rubbish etc, disposal of unserviceable material and staking of divider/ kerb as per direction
of engineer in charge with inclusion of all leads and lifts.

Relevant specification for item no. 1 shall apply to this item.

Item No. 3
Dismantling of any type of paving (CC Block) laid in mortar/ sand including stacking of
serviceable materials and disposal of unserviceable material with all leads and lifts.

1. The relevant specifications of MORT&H fifth revision clause 202 shall apply to this item &
directed by engineer in charge.
2. The item shall be measured in Sq.mt.
3. Rate shall be included all materials, labour, equipment etc. required to execute this item.

Item No. 4
Empty boring to the required depth (measured from bottom of pile cap to founding level) by
means of mechanical rotary through all strata like soil, sand, clay, murrum, gravel, pebble,
boulder, cobble, soft rock, etc. for pile of required diameter, supported without the help of
polymer slurry including all required plant & machineries, disposal of excavated material with
all leads & lifts, mobilization demobilization, remobilization if required, transportation of
required plant and machineries, etc. Method of boring shall be as per IS 2911-Part 1 - Section -
II.
1.) Bore hole Drilling shall be done by use of mechanical rotary using temporary casing of
required depth up to cut off level of pile, polymer slurry not to be used and drilling shall
be carried out as directed by the Engineer. (Use of bentonite slurry will also not
permitted)
2.) Reinforcement will be paid separately.
3.) Rate shall also include drilling and socketing in rock at required depth. The item is
without the cost of polymer to be used for stabilization of bore. i.e Dry Boring.
4.) Length of pile shall be measured from bottom of pile cap and up to the founding level.
5.) Rate is inclusive of empty boring through overburden (i.e. temporary working platform,
etc.)
For 600 mm dia.

1. MORT&H fifth revision specifications as in section 1100 shall be followed in connection with this
item. All relevant provisions as have been included in the respective IRC and IS specifications are
also applicable.
2. Measurement shall be in running meter.
3. The rate shall include all required plant & machineries, disposal of excavated material with all
leads & lifts, mobilization demobilization, remobilization if required, transportation of required plant
and machineries, etc. Method of boring shall be as per IS 2911-Part 1 - Section -II.
4. The mode of payment shall be in per Rmt. basis.

Signature of Bidder Page 95 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

Item No. 5
Providing and placing with tremie reinforced cement concrete M35 grade in RCC bored piles of
any diameter using 6 mm to 20 mm machine crushed well graded stone aggregate, natural or
crushed sand of approved quality, OPC 43/53 grade cement with contractor's own concrete
mix design, including necessary mixing in fully automatic batch mix plant, transport, curing,
casting of pile min 1.0x dia above cut off level with all leads & lifts, etc. complete as per
execution drawing & specification & as directed by engineer In charge Including mobilization,
demobilization, remobilization, transportation of required plant and machineries if required.
1) Rate is Exclude of reinforcement, initial pile load test, routine load test and M.S. Liners,
pipe for Integrity pile test using cross hole sonic logging, but including temporary liners if
required.
2) Rate is inclusive of labour charges for insert of pipe for Integrity pile test using cross hole
sonic logging method.
3) Excluding reinforcement, initial pile load test, routine load test and M.S. Liners but
including temporary liners if required.
4) Rate is inclusive of 10% additional cement to be added over & above the quantity of
cement required for design mix M-35 concrete for pile concreting in water. (Minimum
Cement content :- 467.5 kg)
5) Payment for concrete shall be done from Cut off level up to founding level and it should be
only based on theoritical dimension of Pile.

1. Relevant Specifications of MORT&H fifth revision Section – 1100, 1700 & 1600 shall apply to this
item.
2. The relevant specifications given in tender Volume-I for concrete shall apply to this item.
3. The measurement shall be in Cum basis.
4. The rate includes necessary , mixing in fully automatic batch mix plant, transport, curing, casting
of pile minimum 1 x dia. of pile above cut off level with all leads & lifts, etc. complete as per
execution drawing & specification & as directed by engineer In charge. Including mobilization,
demobilization, remobilization, transportation of required plant and machineries if required.
5. The rate is Excluding reinforcement, initial pile load test, routine load test and M.S. Liners but
including temporary liners if required.
6. The Rate is inclusive of 10% additional cement to be added over & above the quantity of cement
required for design mix M-35 concrete for pile concreting in water.
7. The mode of payment shall be in per cum. basis.

Item No. 6
Chipping and dressing of the RCC piles upto cut off level including cleaning of reinforcement
and removal of dismantled materials etc. for providing pile caps as directed by Engineer and
as per specifications.
For 600 mm dia.

1. The relevant specification for chipping and dressing of the RCC piles up to cut off level is as per
IS 2911 Part-I section-II for all diameters of pile.
2. The measurement shall be in Rmt. basis.
3. The rate includes cleaning of reinforcement and removal of dismantled materials etc. for providing
pile caps as directed by Engineer and as per specifications.
4. The mode of payment shall be in per Rmt. basis.

Item No. 7
Performing Integrity Test (low strain) on all vertical pile. The item shall include chipping of
weak concrete at the top of pile, leveling, bending of reinforcing bars, preparation of pile head
including testing with pile driving analyser or approved equivalent. To be carried out at least
15 days after concreting of piles. A specialist approved Agency shall be employed by the
Contractor for the test. The test shall be carried out as per relevant ASTM code. The item is
including complete testing with approved apparatus, analysis of results and conclusions
including submission of test reports in three hard copies with soft copy in CD.
For 600 mm dia.

1. The work of load testing, routine test shall be carried out in accordance with IRC and IS code
and MORT&H fifth revision section-1100 for testing of piles.

Signature of Bidder Page 96 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

2. Relevant specifications of load testing of piling work shall apply to this item.
3. If the test is decided to be carried out on any working pile then the cost of test pile will not be
admitted for payment under respective other item.
4. The measurement shall be in Nos.
5. The rate includes cost of required materials, labour, equipments etc. to complete the item.
6. The mode of payment shall be in per Nos. basis.

Item No. 8
Excavation for pile caps, foundation of retaining wall pile cap beam etc. in all categories of
soils, such as sand, clay, murrum, gravel, pebble, boulder, cobble, soft rock, road crust etc. as
per specification for depth below ground level as mention. Including to pay stacking of
excavated stuff within a site limit. The rate is inclusive of contractor's own machinery and
equipment, labour, taxes, temporary works, consumables. leading & lifting, shoring, strutting,
timbering and buttressing with sand / clay bags and all such measures necessary to retain in
position the sides of foundation pit and including refilling the approved excavated soil,
clearing and carting excess earth. The rate is also inclusive of dewatering by manual or
mechanical means, if require.
Depth up to 3.0 m. below GL

1. The relevant specification for excavation for foundation for open foundation given in MORT&H
fifth revision Clause-304 & RDSO specification shall applicable to this item.
2. The measurement shall be in Cum. basis.
3. The rate includes shoring, Shutting if required, dewatering, as necessary and disposing of the
excavated stuff as directed.
4. The mode of payment shall be in per cum. basis.

Item No. 9
Extra rate over item of Excavation of earth for excavation of asphalt pavement including
demolishing of asphalt carpet, metal, soiling etc complete with stacking item as directed
a) up to 0.20m thickness
b) Above 0.2m (By breaker machine including cost of operator, fuel & transportation etc
complete)

1. The relevant specification for excavation for asphalt pavement/road crust of any thickness
given in MORTH fifth revision Clause-200 shall applicable to this item.
2. The mode of measurement & payment shall be in per sqm. basis.

Item No. 10
Carting of excavated material such as murrum, earth, kapachi, gravel, brickbats, kankar,
debris, sand, dismantled material, including loading, unloading, stacking etc. complete at non
objectional place as directed by engineer in charge.
Lead up to 3 Km
Additional rate for lead above 3 and upto 5 km
Additional rate for lead above 5 and upto 10 km

1.0
f General:
1.1 The distance for lead shall be as per the item description.
1.2 All the excavated material shall be the property of the client. Where the excavated material is
directed to be used in the construction of the works for general grading, plinth filling or
embankments, the operations shall be arranged in such a manner that the capacity for cutting,
haulage and compaction are nearly the same.
1.3 All hard materials such as hard murrum, rubble etc. not intended for filling in foundations,
plinth or embankments shall be stacked neatly for future use as directed by the Engineer. The
contractor on his own risk shall dispose off unsuitable or surplus materials not intended for
use in part of the works or for reuse outside the work site.
1.4 The rates quoted shall also include for dumping of excavated materials in regular heaps,
bunds, riprap with regular slopes within the lead specified and leveling. As a rule, all softer
material shall be laid along the centre of the heaps, the harder and more weather resisting
materials forming the casing on the sides and the top. Excavated soft rock or hard rock shall
be stacked separately.

Signature of Bidder Page 97 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

2.0 Workmanship:
1.1 The surplus excavated earth shall be disposed off as and when directed by the Architect or
Engineer-in-charge. In case the excavated earth is to be stacked inside the plot, the location
of the stack shall be directed by the architect or engineer in charge. If earth is to be disposed
outside the plot, non-objectionable site shall be selected by the contractor.

1.2 The disposal of the stuff includes loading the earth in vehicle, conveyance to the specified
site, unloading, spreading and compacting with required capacity of roller the same beyond
the initial lead.

1.3 The Contractor should contact the Engineer-In-Charge before disposing the material.

3.0 Mode of measurements and payment:


3.1 The actual measurements of the disposed earth shall be calculated by taking actual levels of
the original ground before start of the work after site clearance and after compaction of the fill
as specified. Quantity of the earth so computed shall be reduced by 10% in case of
consolidated fills, 5% in case of consolidation is done by heavy equipment. No deduction will
be done in case of consolidation heavy mechanical machinery at optimum moisture content.
The quantity of the earth worked out for interim payment by taking lorry measurements; have
to be reduced by 20%.

3.2 The rate includes for spreading, dressing etc. complete at the specified site and shall be for a
unit of one cum.

3.3 The Final quantity of the transported earth shall be worked out after overall reconciliation of
excavation, filling and disposing of the earth for whole site.

3.4 The mode of payment shall be in per cum. basis.

Item No. 11
Providing and laying in positions machine mixed Plain Cement Concrete M15 grade for
leveling course below foundation or below pile cap, pile cap beam, solid slab, approach slab,
etc. at other places as directed by Engineer-in-charge with graded broken stone aggregate
from 6 mm to 40 mm including tamping, vibrating, leveling and curing complete with all
formwork, dewatering wherever required including all materials, labours, plants, machineries
& tools, all leads and lifts, etc. complete as per specification. (Minimum Cement content :- 290
kg)

1. The relevant specifications given for machine mixed plain cement concrete M15 grade as per
Section -1500 & 1700 of MORT&H fifth revision specification & as per relevant RDSO
specification.
2. The measurement shall be per Cum basis.
3. The rate includes tamping, vibrating, leveling and curing complete with all formwork,
dewatering wherever required including all materials, labours, plants, machineries & tools, all
leads and lifts, etc. complete as per specification.
4. The mode of payment shall be in per cum. basis.

Item No. 12
Providing and casting in-situ Reinforced Cement Concrete M35 grade controlled cement
concrete in pile cap and open foundation using 6 mm to 20 mm machine crushed well graded
stone aggregate, sand of approved quality, OPC 53 grade cement with contractor's own
concrete mix design etc. complete as per specification.
The rate is inclusive of all materials, including necessary dewatering, mixing in fully automatic
batch mix plant, transport, curing, vibrating, placing in position, shuttering, formworks,
deshuttering carefully, making good the damages, fixing embedment, inserts, pockets,
wherever necessary, with all lead and lift with contractor's labour, tools & plants, machineries,
as required. (Minimum Cement content :- 410 kg)
1. The relevant specifications given for machine mixed controlled cement concrete M30 grade as
per Section -1500, 1700, 2100 & 2200 of MORT&H fifth revision specification.
2. The measurement shall be per cum basis.

Signature of Bidder Page 98 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

3. The rate is inclusive of all materials, including necessary dewatering, mixing in fully automatic
batch mix plant, transport, curing, vibrating, placing in position, shuttering, formworks, de-
shuttering carefully, making good the damages, fixing embedment, inserts, pockets, wherever
necessary, with all lead and lift with contractor's labour, tools & plants, machineries, as required.
4. The mode of payment shall be in per cum. Basis.

Item No. 13
Providing and casting in-situ Reinforced Cement Concrete M35 grade controlled cement
concrete in retaining wall (stem shall be cast in single lift or as per direction of Engineer in
charge), etc. using 6 mm to 20 mm machine crushed well graded stone aggregate, sand of
approved quality, OPC 53 grade cement with contractor's own concrete mix design etc.
complete as per specification.
The rate is inclusive of all materials, including necessary mixing in fully automatic batch mix
plant, transport, curing, vibrating, placing in position, scaffolding, staging, shuttering,
formworks, deshuttering carefully, making good the damages, fixing embedment, inserts,
pockets, wherever necessary, with all lead and lift with contractor's labour, tools & plants,
machineries, as required, with including cost of finishing equivalent to F3 type exposed
concrete and form mark.
Any honeycombing/ undulation found shall be rectify to match F3 class finish. Note:- Rates in
items shall include cost of providing grooves, chamfers, moulding, cut-out etc. in formwork.
The work will include placing in position of necessary fixtures, sleeves for various purposes,
etc. complete as per drawings, specifications and as directed by the Engineer in charge.
(Minimum Cement content :- 410 kg)

Relevant specification for item no. 11 shall apply to this item.

Item No. 14
Providing and casting in-situ Reinforced Cement Concrete M30 grade controlled cement
concrete in parapet (parapet shall be cast in single lift or as per direction of Engineer in
charge), etc. using 6 mm to 20 mm machine crushed well graded stone aggregate, sand of
approved quality, OPC 53 grade cement with contractor's own concrete mix design etc.
complete as per specification.
The rate is inclusive of all materials, including necessary mixing in fully automatic batch mix
plant, transport, curing, vibrating, placing in position, scaffolding, staging, shuttering,
formworks, deshuttering carefully, making good the damages, fixing embedment, inserts,
pockets, wherever necessary, with all lead and lift with contractor's labour, tools & plants,
machineries, as required, with including cost of finishing equivalent to F3 type exposed
concrete and form mark.
Any honeycombing/ undulation found shall be rectify to match F3 class finish. Note:- Rates in
items shall include cost of providing grooves, chamfers, moulding, cut-out etc. in formwork.
The work will include placing in position of necessary fixtures, sleeves for various purposes,
etc. complete as per drawings, specifications and as directed by the Engineer in charge.
(Minimum Cement content :- 410 kg)

Relevant specification for item no. 11 shall apply to this item.

Item No. 15
Providing and fixing in position (Thermo mechanically Treated bars) TMT Fe500D conforming
to IS 1786 reinforcing bars of various diameters for Pile Cap as per detailed designs and
drawings and schedule including cutting, bending, hooking the bars, binding with 18 SWG GI
wires with cost of all labour, materials, tools, plants, equipments, supporting as required with
all lifts and leads etc. all complete as per specification and as directed by Engineer
The rate includes for supply, loading, unloading, transporting to site, cutting, bending,
hooking, placing, tying in position with contractor's own binding wire, welding, forming the
reinforcement cage etc. Welding and supporting in position to ensure lines and levels during
concreting, maintaining proper cover / spacing, all leads & lifts, etc. including contractor's
own equipment, labour, supervisor, taxes, machineries, etc. complete as per drawings and
specification.
1) The waste cut pieces shall not be included in the paying quantity.
2) Binding wire shall not be included in the paying quantity.

Signature of Bidder Page 99 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

3) The work shall be done as per approved drawing.


4) No payment shall be made for laps & couplers. Admissible lap after full length of 12m
reinforcement is payable extra only For Pile Reinforcement
a) Piles
b) Pile Caps
c) Retaining Wall
d) Parapet
e) C.C pavement

1. The relevant specifications as per IS 1786 Specification & as per relevant MORT&H fifth
revision section 1600 shall apply to this item.
2. The measurement shall be in MT basis.
3. The rate includes for supply, loading, unloading, transporting to site, cutting, bending,
hooking, placing, tying in position with contractor's own GI annealed binding wire, welding,
forming the cage and lowering it in position in pile bore etc. Welding and supporting in
position to ensure lines and levels during concreting, maintaining proper cover / spacing, all
leads & lifts, etc. including contractor's own equipment, labour, supervisor, taxes,
machineries, etc. complete as per drawings and specification.
4. The mode of payment shall be in per MT. basis.

Item No. 16
Providing and applying Coal Tar Epoxy protective paint for Pile Cap in two coats of DFT 210
microns for foundations /concrete surfaces in contact with soil complete as per Specifications
and as directed by the Engineer including all leads and lifts etc. complete.

1. GENERAL

INTENT
This Section covers the Work of chemically resistant coating to the surfaces of the RCC retaining wall.

APPLICATOR
Ensure that all Work is done by a competent applicator licensed and/or approved by the chemically
resistant coating material manufacturer. Submit the manufacturer's certification of this approval.

GUARANTEE
Furnish a written guarantee covering the materials and workmanship for a period of 5 years from the
date of acceptance of the Work, and be responsible for making good, at your expense, any and all
defects due to the failure of the coating materials or workmanship.
Provide completely corrosion resistant work with no leakage through or around the coating.

SUBMITTALS
Submit the proposed materials, schedule of applications and the manufacturer's literature for the
materials and the recommended methods of application.
Submit sketches showing standard and special details for the corrosion protection. Submit the
manufacturer's approval of the applicator.
Immediately prior to commencing Work in each Area, submit a letter of acceptance for the wall
surfaces to be coated, signed by the applicator's authorized representative.
Upon acceptance, submit a written guarantee.

2. PRODUCTS

Coating for Application on RCC Retaining wall/ pier surface


System Design – Epoxy Tar Based Coating
The coating shall be corrosion resistant coal tar epoxy coating with minimum of 50% solids content.
The dry film thickness shall not be less than 200 microns per coat and should be applied in minimum
two (2) coats. The cured film shall be tough and abrasion resistant.
The Contractor must follow the manufacturer’s guidelines for the preparation of surfaces, for mixing
and application of coating.

Signature of Bidder Page 100 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

3. EXECUTION
a. General
· Deliver materials to job site in factory sealed containers with manufacturer's identification
on each package.
· The Contractor shall store the materials to protect them from damage.

b. Surface Preparation and Inspection


· Clean surfaces of deleterious material in accordance with the manufacturer’s
recommended practice.
· Prepare surfaces to be coated in accordance with manufacturer's instructions.
· Verify the surfaces are dry. (ASTM D4263)
· Have the coating manufacturer's authorized agent inspect surfaces to be coated and
certify in writing to the Engineer-in-Charge that the surfaces are acceptable for the
application of the coating. Do not apply the coating until written certification is received
by the Engineer-in-Charge.

c. Concrete Repairs
· Chip out damaged concrete to sound concrete.
· Repair rebar if damaged.
· Clean concrete surfaces, dampen and hand place patching concrete in accordance with
the pipe manufacturer’s recommended practice. Wet cure immediately and as
recommended by the manufacturer.
d. Application of Coating
· Confirm to the coating manufacturer's instructions for application.
· Schedule the Work to allow application to be performed in a manner that it conforms to
the Manufacturer’s recommendations.
· Apply coating only when atmospheric conditions are suitable and as recommended by
the Manufacturer.

e. Protection of coating
· Protect the coating from damage.
· Allow to cure before further work or putting the coating into service.

f. Clean-up
· Promptly, as the Work proceeds and upon completion, clean up and remove from the
site, rubbish and surplus material resulting from the Work of this Section.

4. RATE
· The measurement shall in sq.mt basis.
The rate includes labour, material, equipment as per specification and as directed by the
engineer including all lead and lifts etc. complete.

The mode of payment shall be in per sq.mt. basis.

Item No. 17
Providing and laying weep holes in abutment, walls, returns etc by using PVC pipes of 100mm
dia including MS Jali on top & laying in proper grade and jointing the completed as per
detailed specifications.

1. WEEP HOLE
Weep holes shall be provided in solid plain concrete/reinforced concrete, brick/stone
masonry, abutment, wing wall and return walls as shown on the drawing or directed by the
Engineer to drive moisture from the back filling. Weep holes shall be provided with 100 mm
dia using PVC/Polysil pipes structures in plain/reinforced concrete or brick masonry. In case
of stone masonry, weep holes shall be 80 mm wide, 150 mm high or circular with 150 mm
diameter. Weep holes shall extend through the full width of concrete/masonry with slope of
about 1 vertical: 20 horizontal towards the draining face. The spacing of weep holes shall
generally be 1 m in either direction or as shown in the drawing with the lowest at about 150
mm above the low water level or ground level which is higher or as directed by the Engineer.
Approved makes for PVC weep holes is Supreme and Finolex.

Signature of Bidder Page 101 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

2. Measurements shall be given on number of weep holes provided.


3. The rate includes all materials, labors, equipments and plants etc. required for executing this
item.

Item No. 18
Providing and applying one coat Epoxy Phenolic primer of DFT 50 micron and two coats of
Epoxy Phenolic coating of DFT 100 microns each or any other equivalent epoxy coating
system to all concrete surfaces exposed to atmosphere in substructure including cost of
material, labour, transportation, scaffolding and preparing the surfaces by cleaning, washing,
brushing, sand / grit blasting etc. complete and as directed by Engineer and as per
specification. (Paint shall be got approved from Engineer and tested from approved
laboratory).

1. The relevant specifications for applying epoxy coating of approved shade, brand and
manufacture on new concrete work is given in item shall apply to this item.
2. The measurement shall be in Sq.mt basis.
3. The rate includes all labour, material, equipments etc. complete as per direction of engineer in
charge.
4. The mode of payment shall be in per sqm. basis

Item No. 19
Box cutting the road surface to proper slope and camber for making a base for road work
including removing the excavated stuff and depositing on the road side slope as directed
within site limit.

The relevant specifications as per relevant MORTH specification Section 301.

The measurement & Payment shall be per cum basis.

Item No. 20
Earthwork for embankment including breaking clods, dressing with all lead and lift and
including watering rolling and consolidation of subgrade in layers at O.M.C. to required dry
density including filling the depression which occur during the process using power roller 8t
to 10t. (A) From borrow pits within 0.5 width

The relevant specifications as per relevant MORTH specification Section 305 & 900.

The measurement & payment shall be per Cum basis.

Item No. 21
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular
sub-base by providing coarse graded material, spreading in uniform layers with motor
grader on prepared surface, mixing by mix in place method with rotavator at OMC,
and compacting with vibratory roller to achieve the desired density, complete for Grade - III
Material.

The relevant specifications given in Section –401 of MORT&H fifth revision specification shall apply to
this item.

The measurement shall be per Cum. basis.

Item No. 22
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base
course on well prepared surface and compacting with vibratory roller to achieve the
desired density as per MoRTH clause 406.

1. The relevant specifications given in Section –501 & 502 of MORT&H fifth revision
specification shall apply to this item.

Signature of Bidder Page 102 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

2. The measurement shall be per Sqm. basis.


3. The mode of payment shall be in per Sqm basis.

Item No. 23
Providing and applying primer coat with cationic bitumen emulsion SS1 grade conforming to
IS:8887 on prepared surface of wet mix macadam including clearing of Wet mix macadam
surface with air compressor to remove all loose material other foreign material. The
primer shall be sprayed uniformly at the rate of 0.70-1.0 kg/sqm. It shall be applied by a
self-propelled or towed bitumen pressure sprayer, equipped for spraying the material
uniformly at a specified rate. No dilution or heating at site of RS1 bitumen emulsion shall be
permitted.

1 The relevant specifications given in Section –501 & 502 of MORT&H fifth revision
specification shall apply to this item.
2 The measurement shall be per Sqm. basis.
3 The mode of payment shall be in per Sqm basis.

Item No. 24
Providing and applying tack coat with VG-10 Grade bitumen using bitumen pressure
distributor at the rate of 0.20 kg/sqm on the existing bituminous surface cleaned with Air
Compressor.

1. The relevant specifications given in Section –501 & 503 of MORT&H fifth revision
specification shall apply to this item.
2. The measurement shall be per Sqm. basis.
3. The mode of payment shall be in per Sqm. basis.

Item No. 25
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam
with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @ min 4.5% by
weight of total mix, transporting the hot mix to work site, laying with a self-propelled paving
machine equipped with an electronic sensing device to the required grade, level and
alignment, rolling with 8-10 tonne static weight or vibratory roller or with a pneumatic tyre
roller of 12 to 15 tonne weight to achieve the desired compaction as per approved
design mix . for Grading-II (26.5 mm nominal size)

1. The relevant specifications given in tender as per clause 501, 502, 503, 505 & 900 of MORT&H
fifth revision specification shall apply to this item.
2. The measurement shall be in Tonne basis.
3. The mode of payment shall be in per Tonne basis.

Item No. 26
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch
type hot mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ min. 5.4 % of mix,
transporting the hot mix to work site, laying with a self-propelled paving machine
equipped with an electronic sensing device to the required grade, level and alignment,
rolling with 8-10 tonne static weight or vibratory roller or with a pneumatic tyre roller
of 12 to 15 tonne weight to achieve the desired compaction as per approved design mix. for
Grading-I ( 13 mm nominal size )

1. The relevant specifications for Bituminous Concrete are as per MORT&H fifth revision Clause
501, 507, 900 & 2702 applicable to this item.
2. The measurement shall be in MT. basis.
3. The rate includes labour, material, equipment etc. complete as per direction of engineer in
charge.
4. The mode of payment shall be in per MT. basis.

Signature of Bidder Page 103 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

Item No. 27
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-20
grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or equivalent quality
for pre-cast blocks, reasonably exposed finish/ formwork , mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete,
including the cost of formwork etc. complete. The rate shall also include necessary cutting of
asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the flush pointing in CM (1:3) for all
joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed with Bituminous
concrete mixed in proper position as directed by Engineer in change to form a portable
mixture. In any case Gravel or such type of materials shall not be allowed for production. a)
Laying on 5 cm thick Sand Bedding

1. Relevant specification shall be followed as per item description and as directed by engineer in
charge
2. The mode of Measurement & payment shall be in per Rmt.. basis.

Item No. 28
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade
of any size ; shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20
mm nominal size for footpath, parking areas, service lanes and other areas as mentioned in
the drawing / instruction of engineer in charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required grading and specification. The paver
block shall be mechanically compacted. The work of paving blocks shall be executed in line
and level by skill mason of flooring work only. It should be laid in such a way that the no
cutting of the paver block to be necessary. if cutting of paver block necessary then it should
be cut by machine only and carting. The finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall be compacted and shall be relaid if
necessary. Gravel or such type of materials shall not be allowed for production. Laying on 5
cms thick sand bedding.

1. Relevant specification shall be followed as per item description and as directed by engineer in
charge
2. The measurement shall be in Sqm. basis.
3. The mode of payment shall be in per Sqm. basis.

Item No. 29
Providing and laying cement concrete M10 for foundation with vibrating, curing,ramming etc.
complete including the cost of form wor etc. complete as directed.

Relevant specification for item no. 10 shall apply to this item.

Item No. 30
Providing and laying controlled cement concrete M30 for foundation with vibrating, curing etc.
complete including the cost of form work but excluding the cost of reinforcement for RCC
work etc. complete as directed.

Relevant specification for item no. 11 shall apply to this item.

Item No. 31
Providing & laying Trimix with dewatering machine and floater machine on constructed RCC
work incl. cost of machine and labour etc compact directed.

Vacuum dewatering process

The purpose of vacuum processing is the removal of surplus water forms the concrete to provide
quicker setting & earlier maximum strength properties. Vacuum dewatering takes place immediately
after the screeding operation.

Upon the surface of the wet concrete is placed a filler pad consisting of two layers. The bottom layer

Signature of Bidder Page 104 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

is contract with the concrete is the fine nylon cloth to act as filler. The upper layer consists of a
special type of plastic net & acts as a water duct. Finally the top cover consisting of a light plastic
sheet is placed over the filler pad projecting slightly outside on all sides. The border of the top cover
rests directly upon the wet concrete to produce an airtight seal.

The suction met is connected with suction houses to a vacuum pump. The normal atmospheric
pressure in the pump is reduced by 90% & 90% of the atmospheric pressure compresses the
concrete.

Concrete is submitted to a pressure of


Air pressure .1N / mm2
Depression .01N/mm2

= Effective pressure .09 N/ mm2

This pressure of about 9000 kp/m2 compresses the concrete & compacts the aggregates. At the
same time the excess water which not necessary for the hydration process of the cement is extracted
from the concrete & consciously discharged with the air.

Apart from normal compaction through vibration, static compaction takes place during vacuum
dewatering with ensuring reduction w/c ratio. The initial w/c/ ratio is reduced by 10 to 20%. This
explains the noticeable improvement s of the concrete properties achieved through vacuum
dewatering.

Vacuuming time is about 1 to 2 min. per cm concrete thickness depending on the particle shape
in the concrete mix.

One vacuum pump with two suction met can dewater 50 to 60 m2. A 2 0 cm thick concrete slab
takes about 30 min. dewater. Accordingly a normal daily production rate is about 400 m2.

Mode of Measurement: The measurement shall be in Sq. Mt

Item No. 32
Making 15 mm groove in RCC work on road and filling it with polysulfide selant and finished it
good incl. all labour charges etc comp as directed.

General

All joints in surface slabs shall be sealed using polysulfide sealant. Joints shall not be sealed before -
14 days after construction.
Preparation of joint grooves for sealing

Joint grooves usually are not constructed to provide the minimum width specified in the drawings
when saw cut joints are adopted. They shall be widened subsequently by sawing before sealing,
depth/width gauges shall be used to control the dimension of the groove.

If rough arises develop when grooves are made, they shall be ground to provide a chamfer
approximately 5 mm wide. If the groove is at an angle upto 10 degree from the perpendicular to the
surface, the overhanging edge of the sealing groove shall be sawn or ground perpendicular. If spalling
occurs or the angle of the former is greater than 10 degrees, the joint sealing groove shall be sawn
wider and perpendicular to the surface to encompass the defects upto a maximum width, including
any chamfer, of 35 mm for transverse joints and 20 mm for longitudinal joints. If the spalling cannot be
so eliminated then the arrises shall be repaired by an approved thin bonded arris repair using
cementitious materials.

All grooves shall be cleaned of any dirt or loose material by air blasting with filtered, oil-free
compressed air. If need-arises the Engineer may instruct cleaning by pressurised water jets.
Depending upon the requirement of the sealant manufacturer, the sides of the grooves may have to
be sand blasted to increase the bondage between sealant and concrete.

The groove shall be cleaned and dried at the Lime of priming and sealing.

Signature of Bidder Page 105 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

Before sealing the temporary seal provided for blocking the ingress of dirt, soil etc., shall be removed.
A highly compressible heat resistant paper-backed debonding strip as per drawing shall be inserted in
the groove to serve the purpose of breaking the bond between sealant and the bottom of the
groove and to plug the joint groove so that the sealant may not leak through the cracks. The width of
debonding strip shall be more than the joint groove width so that it is held tightly in the groove. In the
case of longitudinal joints, heat resistant tapes may be inserted to block the leakage through bottom
of the joint.

Sealing with sealants

When sealants are applied, an appropriate primer shall also be used if recommended by the
manufacturer and it shall be applied in accordance with their recommendation. The sealant shall be
applied within the minimum and maximum drying times of the primer recommended by the
manufacturer. Priming and sealing with applied sealants shall not be carried out when the naturally
occurring temperature in the joint groove to be sealed is below 7° C.

If hot applied sealant is used it shall be heated and applied from a thermostatically controlled,
indirectly heated preferably with oil jacketed melter and pourer having recirculating pump and
extruder. For large road projects, sealant shall be applied with extruder having flexible hose and
nozzle. The sealant shall not be heated to a temperature higher than the safe heating temperature
and not for a period longer than the safe heating period, as specified by the manufacturer. The
dispenser shall be cleaned out at the end of each day in accordance with the manufacturer’s
recommendations and reheated material shall not be used.

Cold applied sealants with chemical formulation like polysulphide may be used. These shall be
mixed and applied within the time limit specified by the manufacturer. If primers are
recommended they shall be applied neatly with an appropriate brush. The Movement
Accommodation Factor (MAP) shall be more than 10 per cent.

The sealants applied at contraction phase of the slabs would result in bulging of the sealant over and
above the slab. Therefore, the Contractor in consultation with the Engineer, shall establish the right
temperature and time for applying the sealant. Thermometer shall be hung on a pole in the site for
facilitating control during the sealing operation.

Sealant shall be applied, slightly to a lower level than the slab with a tolerance of 5 ± 2 mm.

During sealing operation, it shall be seen that no air bubbles are introduced in the sealant either by
vapours or by the scaling process.

Testing of applied sealants: Manufacturer’s certificate shall be produced by the Contractor for
establishing that the sealant is not more than six months old and stating that the sealant complies with
the relevant standard as in Clause 602.2.8. The samples shall meet the requirement of AASHTO M
282 for hot applied sealant or BS 5212: (Pan-2) for cold applied sealant.

The groove shall be measured in Rmt.

Item No. 33
Providing and applying Synthetic Enamel Paint Alternate Black & Yellow on crash barrier and
Kerb with one coat of white primer of cement paint and two or more coat of paint including
cleaning all dust, durt and other foreign matters with all material labour equipments with all
leads and lifts etc. complete.

1. Relevant specification shall be followed as per item description and as directed by engineer in
charge
2. The measurement shall be in Sqm. basis.
3. The mode of payment shall be in per Sqm.. basis.

Signature of Bidder Page 106 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

Item No. 34
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 80 mm thick, M-45 Grade
of any size ; shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20
mm nominal size for footpath, parking areas, service lanes and other areas as mentioned in
the drawing / instruction of engineer in charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required grading and specification. The paver
block shall be mechanically compacted. The work of paving blocks shall be executed in line
and level by skill mason of flooring work only. It should be laid in such a way that the no
cutting of the paver block to be necessary. if cutting of paver block necessary then it should
be cut by machine only and carting. The finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall be compacted and shall be relaid if
necessary. Gravel or such type of materials shall not be allowed for production. Laying on 5
cms thick sand bedding.

Relevant specification for item no. 27 shall apply to this item.

Item No. 35
Providing temporary barricade of 2.0 m height including all road safety devices on both sides
of Bridges & approaches arrangement for traffic diversion as per technical specifications and
drawings. Temporary barricade shall be of plain MS sheet 16 Gauge fixed with steel frame as
per drawing, painting (including primer of approved quality) with synthetic enamel paint of
approved color, quality and brand, writing lettering including maintenance of the same duly
cleaning the same on fortnightly basis and painting if required, arrangement for blinker lights
on barricades during night as per requirement and rate for blinker shall be payable as per
relevant item and as per the instruction of the engineer. Barricading should be rugged. During
the construction, barricading has to be kept continuously. Nothing extra will be paid for
dismantling and re-erecting the barricades within site stretch. There should not be any
opening at the end of barricade except at locations approved by Engineer.
Note:
(i) Once barricade has been provided and work started, removal of barricade is not
permitted till completion of work.
(ii) While erecting barricade, the bottom gap between barricade and road should be opened
to pass storm water and it should be minimum about 150mm from existing GL/ road
level.
(iii) There should be minimum openings at the end of barricade to allow access of trucks /
lorries and machine to site work area. Even these spacing should have proper opening &
closing arrangements.
(iv) After completion of the entire work, the barricades shall be the property of the
contractor.
(v) If the cleaning is not done including removal of posters regularly, a recovery shall be
made at the rate of 0.1% of the accepted rate of item per fortnight on prorata basis of
length not cleaned.
(vi) Barricades on either side shall be measured individually.
(vii) For 2.0 m barricades adequate blinking lights on barricade diring night time must be
ensured. The rate of this item should include provision for power pack / Genset / solar
battery etc. so as to ensure the blinking of lights in night time as long as barricades are
in position at the work spot. It is specifically highlighted that barricading during
construction shall be limited to 1m to 2m from outer edge of structure to be constructed.
Barricading of height 2.0 m height as per GFCD. Payment shall be made at 70% on
erection of barricade and 30% on removal of barricade as per the instructions of
Engineer.

For technical specification refer section 813 of “Specifications for Road and Bridge works” from
MORTH fifth revision specifications alogn with specification as below.

Scope of Work
The barricading work covers for the work done along the areas affecting road traffic. Barricading for
the other areas like casting yard, batching plant, storage and other working area shall be done at own
cost by the contractor. The detailed scope of work is as follows:

Signature of Bidder Page 107 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

Providing and installing the barricade of the design and type as shown in the typical sketch furnished
as per the approved plan firmly to the ground and maintaining it during the progress of work.
Providing adequate road safety devices
Dismantling of barricading and other temporary installations from the site and cleaning the site as per
the direction of Engineer upon its completion and acceptance of work.

Mode of Measurement
The measurement shall be based on Square meter area of barricading. Retro reflective work and
blinkers shall be paid in relevant item. The barricading item includes all the required safety as well as
item description shall be measured up to two decimal places.

The stage payment for providing barricade shall be as follows:


70% of quoted rate for length of barricade installed at site as per instruction of Engineer.
Remaining 30% shall be paid on removal of barricade as per instruction of Engineer.

Once barricade is erected, Contractor will not be allowed to remove / re-shift the barricade to some
other location till completion of all activities of the work in that stretch. In case Contractor shifts the
barricade to some other location before completion of the all activities in that stretch, payment as
covered in (i) above will not be given for such panels erected at other locations.

Item No. 36
Providing and laying Dry Lean Concrete sub base including providing coarse and fine
aggregate to the specified gradation using minimum cement content 150 kg/cum of concrete ,
mixing of concrete as per approved design mix using Continuous mix plant of appropriate
capacity, transporting and laying with self propelled paver and compacting with vibratory
roller of minimum 80-100 kN statics weight to give desired compacted density and average
compressive strength of 10 MPa at 7 days and curing with liquid curing compound or
sprinkling water and covering with moist hessian or ponding of water for 7 days including
providing construction joints, including all material, labour, machinery with all leads and lifts
etc. complete.

1. The relevant specifications of MORT&H fifth revision clause 601 shall apply to this item.
2. The item shall be measured in Cumt basis.

Item No. 37
Providing and laying Pavement Quality concrete (PQC) of M-40 grade with 43 grade cement @
425 KG/cum, coarse and fine aggregate confirming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix
design, transported to site, laying, spreading, compacted and finished in a continuous
operation including provision of contraction, expansion, construction and longitudinal joints,
joint filler, separation membrane (125 micron thick polythene plastic sheet) sealant primer,
joint sealant, deboning strip, dowel bar, be rod, admixtures as approved, curing compound,
finishing to lines and grades a sper drawing. In addition to the ingredients mentioned in
clause 600 for preparation of RMC for PQC the contractor shall and add Polymer Synthetic
Fibres (PSF) as per clause no. 602.2.5 specifications and as directed by Engineer in charge.
The rate is inclusive of providing mixing PSF as above. The PQC without fibers shall not be
accepted.
The rate is inclusive of covering with moist hessian and ponding and sprinkling of water by
making vatta with CM (1:6) proportion & cover the surface area in 1.0 x 1.0 square for a
minimum period of 14 days.
The rate is inclusive of finishing of PQC top surface to the desired surface texture.
The rate is inclusive of sawing / forming the groove of required size as per drawing.
The rate is inclusive of providing and fixing in position required dowel bars. The bars, cradle
supports, corner reinforcement, chairs, reinforcement for transition section, corner be bar,
etc. as per drawing. Steel required for PQC, either mild steel or HYSD is not to be measured
nor paid extra.
The rate is inclusive of providing and fixing in position all required materials like compressible
joint filler boards, deboning strips, polysulphide / polyurethane liquid seal / silicon sealant,
PVC dowel caps, sponge, soft ropes, rubberised bitumen sealant, etc. for all type of joints.

Signature of Bidder Page 108 AMC


Ahmedabad Municipal Corporation Section-VI : Item wise Specifications

The rate is inclusive of treatment of joint between PQC and Flexible Pavement as per
drawing."

1. The relevant specifications of MORT&H fifth revision clause 602 shall apply to this item.
2. The item shall be measured in Cumt basis.

Item No. 38
Fabricating, supply and erecting in position Standard Structural steel sections conforming to
IS 2062 for railing or other works using ISMB, ISA, ISMC, MS plate, flat, square bars, pipe,
square pipe, etc. including welding, cutting, wastage, etc. complete. The rate is inclusive of
welding road, supply & fixing of correct size nut, bolts, washers, including one primer coat of
red lead paint conforming IS:102 Zinc chromate paint conforming to IS:104 followed by two
coat of aluminium paint as per IS:2339 with all contractor's materials, labour, tools & plants, in
bolted/welded construction as directed by Engineer-in Charge. The waste cut pieces shall not
be included in the paying quantity. The work shall be done as per drawing and specification.
The work shall be carried out as per IS:800, IS:816

1. The relevant specifications as per relevant MORTH specification Section 1900.


2. The measurement shall be in MT basis.
3. The rate includes for supply, loading, unloading, transporting to site. Welding and supporting
in position to ensure lines and levels including contractor's own equipment, labour,
supervisor, taxes, machineries, etc. complete as per drawings and specification. The rate is
inclusive of welding road, supply & fixing of correct size nut, bolts, washers, including one
primer coat of red lead paint conforming IS:102 Zinc chromate paint conforming to IS:104
followed by two coat of aluminum paint as per IS:2339 with all contractor's materials, labour,
tools & plants, in bolted/welded construction as directed by Engineer-in Charge.
4. The mode of payment shall be in per MT. basis.

Item No. 39
Providing and fixing in position pre moulded asphalt specifications or bitumen cork board as
directed by engineer in charge. 12mm Thick

The relevant MORTH specification for clause no. 2604 shall apply to this item.
The measurement and payment shall be in sq.mt basis.

Signature of Bidder Page 109 AMC