Professional Documents
Culture Documents
Time Log: Espirit Consultancy, Inc
Time Log: Espirit Consultancy, Inc
Date Project Work Description Department/ Start End Time Total Sign Off
Requested Personnel Time Hrs. By
10/19/20 23-Beechwood -Initial 3d Model-Render for comments April 9am 6pm 8
(WFH) (Master bedroom Toilet)
10/20/20 23-Beechwood -3d Model and Render (Master Toilet) April 9am 5pm 7
(WFH) 7pm 12am 5
SMRT Bishan Depot -Site Sections, Cable drawings for 10am 6am 7
comments
10/22/20 SMRT Bishan Depot - Adjustments on Site Sections, Cable April 9am 4pm 6
(WFH) drawings, 3d adjustments and render
10/23/20 Marina Center Terminal - Superimpose elevation (Photoshop) Wee 9am 12pm 1
(WFH)