You are on page 1of 1

2021/9/28

Survey Sheet for Span Segment production


Span No. PR5-74,75 NEW 12 OLD 11 Surveyor name
Location Line 2 Mold 6
Casting date 2021/9/28 Tuesday
Seg Type Pier A1.2
OCS beam N/A
Horizontal curve N/A

1 2 3 4 5 6 7 8 9 10 11 12

ELEVATION

PR5-74,75 Seg No- 12

PR5-74,75 Seg-No- 11

■Elevation Unit:【m】
Elevation after Elevation after Elevation before Elevation after Cantilever
Design OLD setting Form closing casting casting Elevation
Point Remark
Elev.
EL Difference EL Difference EL Difference EL Difference Before After

H3' 6.0000
H4' 6.0000
NEW
H1' 6.0000

H2' 6.0000
H3 6.0000

H4 6.0000
OLD
H1 6.0015

H2 6.0019

PLAN ALIGNMENT

+ -
⊿1
NEW side

Oldsegment CL
OLD

Old side
Survey Line    ⊿2

■Length Unit:【mm】
Design After old setting After closing form Before casting After casting
Point
length length Difference length Difference length Difference length Difference
L1 3045.0
NEW
L2 3045.0
L3 - - -
L4 - - -
⊿1 0
OLD
⊿2 0