Electrician’s Report:

New 1 gang arch switch to powder room x 2 ( up and down ) Double gpo in room next to front

door needs replace ( faulty ) New 1 gang arch switch to laundry New globe to laundry Gpo lhs

sink in kitchen needs replacement (faulty ) Gpo rhs sink in kitchen needs replacement (faulty )

Cover cable to hot plate with gpo Globe to living room bc Batten holder under stairs needs

replacing Led batten to garage not working . Needs replacement Globe and batten holder front

of garage Suggest board replacement with new switchboard, 2 x 32 a Rcbo , 2 x 16 a Rcbo , 2 x

10 a Rcbo Fire caulk

Transcription:

-Switchboard-

❌ Requires upgrade - board replacement with new switchboard,

2 x 32 a Rcbo , 2 x 16 a Rcbo , 2 x 10 a Rcbo Fire caulk

-Bathroom-

❌Faulty 1 gang arch switch x 2 need to be replaced

-Living/Dining -

Faulty double gpo needs to be replaced

-Living/Dining -

Broken batten holder needs to be replaced


-Laundry -

Faulty 1 gang arch switch needs to be replaced

-Laundry -

Faulty globe needs to be replaced

-Kitchen -

Faulty Gpo lhs sink needs to be replaced

Faulty Gpo rhs sink needs to be replaced

- Garage -

❌ Faulty Globe needs to be replaced

❌ Faulty batten holder needs to be replaced

Quotes:

❌Quote for Required Electrical Repair Works❌

To attend the property and isolate the power in the switchboard

To uninstall and remove the affected circuit breakers

To supply and install new switchboard, 2 x 32 a Rcbo , 2 x 16 a Rcbo , 2 x 10 a Rcbo

To access the bathroom, remove and uninstall the faulty 1 gang arch switch
To supply and install new 1 gang arch switch as required

To access the garage, remove and uninstall the faulty globe & batten holder

To supply and install new globe & batten holder

To reconnect power supply and test all works

To clean up the site upon completion

Quote for Recommended Electrical Repair Works

To attend the property and isolate the power in the switchboard

To access the living room, uninstall and remove the faulty double gpo & broken batten holder

To supply and install new double gpo & batten holder as required

To access the laundry, uninstall and remove the faulty 1 gang arch switch & globe

To supply and install new 1 gang arch switch & globe

To access the kitchen, uninstall and remove both GPO lhs & rhs sinks

To supply and install both new GPO lhs & rhs sinks

To reconnect power supply and test all works

To clean up the site upon completion