Professional Documents
Culture Documents
PROJECT TITLE: STRATEGIC RESERVOIRS AT MAKKAH PHASE II & TAIF PHASE I PROJECT No. 20906
DOCUMENT TRANSMITTAL
The following enclosed documents/drawings are presented for the purpose indicated in the table below:
__________
Ibrahim Shahin Elessawi
Project Manager