Saline Water Conversion Corp

Shuqaiq WTS
Phase 3
Project No.: 20407
Sheet 1 of 1
COMMENT REVIEW SHEET
Date: July 23, 2020
To: RTCC Re / Contractor:
Riyadh AL-Ma’ather street
P.O.Box 307-Area Code 11411
Transmittal Ref.
Tel: +966(11)4164111 RF-EF-D-0227
No.:
Fax: +966(11)4164222
Attn: Engr: Fawaz Tarazi Date: July 15, 2020

Project Document C06-YE01-F- 0905 Revision: 1


No.:

Document Title: Inspection & Test Plan for Boxes (Pull, Junction, Terminal) & Enclosures

Engineer’s Review ☒ A. Approved ☐ B. Approved ☐ C. Rejected; ☐ D. Information


Status to Proceed to Proceed; To Be Only
Recommendation Subject to Resubmitted
Comments

Drawing / Description of Comment / Remark Reference Contract


Doc Section (if
Comment Ref Applicable)
1. Refer to CRS NO.EF-RF-C-0049 QC10-H- 092 E12
Cables and Cable
Laying – Rev 6

Checked by: M. ELSherbini

Our Ref No.: Signed:

Louis Le Roux
EF-RF-C-0227
Project Manager; Owner’s Engineer

Approval of general compliance of Contract Documents does not constitute a blanket approval of all dimensions, quantities and details of material,
equipment or items shown or described and does not relieve the Contractor from his responsibility concerning the requirements stipulated or implied by
the Contract Documents.