REINFORCED CEMENT CONCRETE COST ANALYSIS

MATERIAL REQUIREMENT ANALYSIS FOR 10M3 VOLUME


BASE SLAB WALL TOP SLAB
RCC 1:02:03 30 m3 34 m3 18 m3
>Cement CONCRETE PROPORTION
Quantity of Cement = 7.54 m3 8.58 m3 4.49 m3 CEMENT 1
Nos of Cement Bag= 215.4 bag 245.1 bag 128.4 bag SAND 2
AGGREGATE 3
>Sand
Quantity of sand = 15.08 m3 17.16 m3 8.99 m3
> Aggregate
Quantity of aggregate = 22.61 m3 25.73 m3 13.48 m3
30.2 m3 34.3 m3 18.0 m3
4m3