PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 2-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 343
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 686 Fatality 0
PTW (WCC) 1 53 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 343 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 4,3%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 3-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 344
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 688 Fatality 0
PTW (WCC) 0 53 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 344 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 8,6%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 4-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 345
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 690 Fatality 0
PTW (WCC) 0 53 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 345 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 12,9%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 5-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 345
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 690 Fatality 0
PTW (WCC) 0 53 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 345 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 17,1%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 6-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 346
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 692 Fatality 0
PTW (WCC) 0 53 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 346 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 21,4%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 7-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 347
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 694 Fatality 0
PTW (WCC) 0 53 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 347 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 25,7%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 8-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 348
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 696 Fatality 0
PTW (WCC) 0 53 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 348 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 30,0%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 9-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 349
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 698 Fatality 0
PTW (WCC) 1 54 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 349 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 34,3%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 10-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 350
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 700 Fatality 0
PTW (WCC) 0 54 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 350 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 38,6%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 11-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 351
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 702 Fatality 0
PTW (WCC) 0 54 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 351 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 42,9%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 12-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 352
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 704 Fatality 0
PTW (WCC) 0 54 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 352 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 47,1%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 13-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 353
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 706 Fatality 0
PTW (WCC) 0 54 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 353 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 51,4%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 14-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 354
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 708 Fatality 0
PTW (WCC) 0 54 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 354 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 55,7%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 15-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 355
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 710 Fatality 0
PTW (WCC) 0 54 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 355 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 60,0%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 16-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 356
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 712 Fatality 0
PTW (WCC) 1 55 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 356 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 64,3%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 17-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 356
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 712 Fatality 0
PTW (WCC) 0 55 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 356 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 68,6%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 18-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 357
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 714 Fatality 0
PTW (WCC) 0 55 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 357 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 72,9%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 19-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 358
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 716 Fatality 0
PTW (WCC) 0 55 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 358 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 77,1%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 20-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 359
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 718 Fatality 0
PTW (WCC) 0 55 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 359 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 81,4%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 21-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 360
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 720 Fatality 0
PTW (WCC) 0 55 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 360 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 85,7%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 22-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 361
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 722 Fatality 0
PTW (WCC) 0 55 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 361 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 90,0%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 23-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 362
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 724 Fatality 0
PTW (WCC) 1 56 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 362 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 91,4%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 24-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 363
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 726 Fatality 0
PTW (WCC) 0 56 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 363 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 92,9%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 25-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 364
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 728 Fatality 0
PTW (WCC) 0 56 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 364 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 94,3%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 26-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 365
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 730 Fatality 0
PTW (WCC) 0 56 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 365 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 95,7%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 27-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 366
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 732 Fatality 0
PTW (WCC) 0 56 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 366 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 97,1%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift
DAILY PROGRESS REPORT
PERIODE : APRIL 2020
Day Work Day Shifts Only
PIC SPA Document No EGA-G/ E/ 2020/ 13/ 001
Anur W Budi Santoso
SURFACE MAINTENANCE SERVICE AREA PPP Report Date 28-Apr-20
Sutaji Work Day Wave and Wind Speed Report No. 367
0-1 meter ✔ 1-2 meter > 2 meter Reported by Dirar Rizqullah
Day shift Night shift
6 -10 knot ✔ 11-20 knot > 21 knot Proj. Overall Status ✔
HSSE KPI's Personnel On Board (POB)
Input Today Cumm Output Today Cumm Company Name No. Persons
PEDULI Card 2 734 Fatality 0
PTW (WCC) 0 56 DAFWC 0 WMO Technical Maintenance 0
Toolbox meeting 1 367 Recordable Injury and Illness WMO Production 1
0
CoW (PTW) Audit 0 Case (RIIC) PT. Surabaya Egamekinka Pratama 2
HSE Audit 0 First Aid 0
House Keeping Inspection 0 Near Misses 0
Emergency Drills & Exer. 0 HIPO 0
Management Visit 0 N/Work related medivac 0
Safety Meeting / Safety Flash 0 Oil Spills (> 15 Ltrs) 0
Total POB 3
TOFS 0 Flare/Vent 0
Executive Summary:
- No Contract: S44318281A (SURFACE MAINTENANCE SERVICE) Colour Coding
Grey RAL 7001
No Job Description Area Progress Orange RAL 2004
Chipping & painting deck area exmastry White RAL 9003
1 PPP 98,6%
PHE-23 Yellow RAL 1028
Black RAL 9005
Red RAL 3020
Blue RAL 5010
Green RAL 6002
SSPC 1
Specification Surface
SSPC 2
Prosedur
SSPC 3
PROGRESS PHOTOGRAPH :
Note ✔ (Green) - Status Ok, Project on track, No Issues - We don't need help.
✔ (Yellow) - Status still Ok, Project on track, Issues manageble - Need Intensive meeting
✔ (Orrange) - Status closed monitor, Could be a problem, or STL & Direct Report need to be aware, We are need direction Wind &
Warm Cloudy Rainy
✔ (Red) - Status Bad, We Have a Major Issues - At Impasse, Need a Decission rain
D/S ( Day Shift), N/S: Night Shift