The document lists equipment for LOT#3 and the factory acceptance tests (FAT) and site acceptance tests (SAT) required for each item. Key equipment includes main runners and spares, stator assemblies, stator coils and bars, generator rotors, poles and accessories, turbine shafts, oil tanks and accessories, and speed sensing devices. FATs include tests such as balancing, material analysis, insulation testing, pressure testing, and dimensional verification. SATs focus on functional testing after installation at the site.
The document lists equipment for LOT#3 and the factory acceptance tests (FAT) and site acceptance tests (SAT) required for each item. Key equipment includes main runners and spares, stator assemblies, stator coils and bars, generator rotors, poles and accessories, turbine shafts, oil tanks and accessories, and speed sensing devices. FATs include tests such as balancing, material analysis, insulation testing, pressure testing, and dimensional verification. SATs focus on functional testing after installation at the site.
The document lists equipment for LOT#3 and the factory acceptance tests (FAT) and site acceptance tests (SAT) required for each item. Key equipment includes main runners and spares, stator assemblies, stator coils and bars, generator rotors, poles and accessories, turbine shafts, oil tanks and accessories, and speed sensing devices. FATs include tests such as balancing, material analysis, insulation testing, pressure testing, and dimensional verification. SATs focus on functional testing after installation at the site.
Main Runners with 1. Static Balancing and Spares (03 Nos) MPI of Runners 2. Surface Defects (DPT) 3. UT of runner crown 4. Radiographic Testing 5. Surface Roughness 6. Dimensional Inspection 7. Pressure Tests of head cover and bottom cover 8. Steel lamination test (spiral case and stay vanes) 9. Material tests and chemical analysis of steel 10. Functional Tests Stator Assembly of 1. Magnetization Unit#03 2. Stator Core Loss Test 3. Insulation Resistance Test of Stator (absorption ratio and polarization coefficient) 4. DC withstand Voltage test, leakage test 5. Power Frequency AC withstand voltage test Stator Coils & Bars for 1. Dielectric Test Unit#1 & Unit#2 2. Partial Discharge Measurement Test Generator Rotors with 1. NDT of Rotor shaft and Accessories (03 Nos) shaft coupling bolts 2. Mechanical Tests 3. Cold state DC resistance test 4. Insulation Resistance Test 5. Power Frequency AC withstand voltage test Poles and Accessories 1. Dielectric Test for all Units 2. IR Test Turbine Shaft with 1. Dimensional Tools of all 3 Units verification 2. Shaft Runout 3. Surface examination on axial bore. 4. UT 5. Seal Test Oil Tank and 1. Dimensional Accessories verification. 2. Leakage check of oil tank. 3. UT/RT 4. Pressure tests (oil accumulators) 5. Accessories Functional tests. Speed Sensing Devices 1. Functional Tests and Electrical Cubicles 2. Routine Tests