SOUTHERN EXTENSION OF THE NATIONAL ELECTRICITY GRID POWER Item Shunt Reactor

Quality Inspection Plan TRANSMISSION PROJECT UNDER EDCF Rev.No 0 Page

Applicable Code & Std./ Inspection Point Test


No. Item Description Inspeciton & Test Activity Remark
Ref. Document Manufacturer Hyosung Client Report

In Process Inspection

1) Overall size
2) Conductor size
1 Coil(Winding) HS-CP-34-0203 P R R O
3) Tensile Strength
4) Yield Strength

1) Measurement of Reactance IEC 60076-1 - H R O

2 Core & Coil Assembly 2) Insulation Resistance Test IEC 60076-1 - H R O

3) Check of phase displacement IEC 60076-1 - H R O

Accessory

1) Lightning impulse test


3 Bushing IEC 60137 P R R O
2) Measure of capacitance

1) Leakage test
2) Over pressure test
Winding/Oil Temperature
4 3) Temperature test IEC 60751 P R R O
Indicator
4) Heating system test
5) Switch point test

5 Pressure Relief Device 1) Pressure test Manufacture standard P R R O

1) Dielectric Strength test


2) Leakage test
6 Buchholz Relay 3) Functional test IEC 60076-22-1 P R R O
4) Test of damper operating value
(Flow test)

1) Dimension & External Appearance


2) Operation test
7 Oil Level Gauge 3) Contactor test Approved Drawing P R R O
4) Withstancd voltage test
5) Insulation resistance test
8 Dehydrating Breather 1) Dimension & External Appearance Approved Drawing P R R O

1) Polarity test
2) Power-frequency test
9 BCT 3) Inter-turn overvoltage test IEC 61869-2 P R R O
4) Trun Ratio
5) Knee point test

* P: Perform, , R : Report Review, H : Hold Point, - : Not Applicable