Professional Documents
Culture Documents
PEN - PTSC
CONSORTIUM
DETAIL A
METHANOL
SUPPLY TANK
ISBL MEMBRANE
PEN - PTSC
CONSORTIUM
NOTES:
J-436
09/19/16
ASB
J-436
M C G B SKID #1 09/19/16
ASB
J-436
09/19/16
ASB
J-436
09/19/16
ASB
NOTES:
J-436
09/19/16
ASB
HEATER PACKAGE
REFER TO
HEATER P&ID DIAGRAM:
HEATER
NOTES:
J-436
09/19/16
ASB
NOTES:
CRYO SKID #6
CRYO SKID's #1 & #6
J-436
09/19/16
ASB
OFF SKID
EXPANDER SKID
SEE MAFI DRAWINGS
FOR DETAILS
J-436
OFF SKID 09/19/16
ASB
NOTES:
NOTES:
J-436
09/19/16
ASB
RELATED
S
RUSSELL, LLC. THI
THE
S
PART OF THI
ENTS
ON
NG
FILTER COALESCER
TTEN
PI
OLATI
NI
PURPOSE. RECI
THE PLANT AND/OR
NTAI
S A VI
M AI
661 mm ID X 2600 mm T/T
NG. NO
1. FOR START-UP.
AND/OR
PART I
S THE PROPERTY OF UOP
Design: 68 barg @ 60°C 2. PERMISSIVE TO OPEN FEED SDV.
EPC UOP
S DRAW I
3. FT-4090 IS A LOOSE ITEM SUPPLIED BY UOP. (FOR PIPERACK INSTALLATION).
ANY OTHER
N
NG
MDMT: -29 °C @ 68 barg 4. LINE NUMBERS HAVE 4 DIGITS AND START WITH PREFIX "4".
I
MEMBRANE UNIT
OPERATI
NG
W HOLE OR
TY OF THI
5. LOOSE ITEM BY UOP.
OPERATI
1 6. PROVIDED AND INSTALLED BY PEN.
WI
TY STATEM ENT
FOR
THAN
RUSSELL, LLC
FROM CMGPP-DD-PR-PID-0009 TO CMGPP-FD-PR-PID-1028
ALI
375-A1-CS-2"
AND/OR
N
I
SHALL NOT BE USED
DENTI
NG
THE PURPOSES OTHER
LINE 4807 LINE 375-A1-CS-2"
THAT I
S DRAW I
THE CONFI
ES.
NING
NAL PENALTI
BY UOP
NTAI
ON
1
OF THI
TP
ALI
NFORM ATI
N
1
NTAI
PM ENT M ANUFACTURED
ON
ON
ETARY I
M AI
CATI
MI
TO 0009 FROM CMGPP-FD-PR-PID-1028
NFORM ATI
CONFI
380-A1-CS-3"
CRI
FOR
L AND
PROPRI
A1- CS
USED
S I
VI
N. THI
CI
OR
TP HZI HC
N
NS CERTAI
S SUBJECT TO
M AY BE REPRODUCED
EQUI
HEREI
4090 4090 2"
029
D1- CS
1" x 2" 1" x 2"
FOR
G1D1
A1- CS
RELATED
1201 SET @ 68 BARG SET @ 68 BARG
CONTAI
BED
DED
PM ENT DESCRI
FIRE SIZED FIRE SIZED
S PROVI
I
CONSENT OF UOP
GHT AND
PLANT AND/OR
A
NG
S
1
C
PSV PSV
S DRAW I
HY
I
D1- CS
C
1
.75"
NG
NG
4091A 4091B
COPYRI
S
A
4090
DRAW I
DRAW I
G1E1
EQUI
RO
THI
D
S
1224
1
C
4090 2"
-
2"
-
HZT HCV 2"
C
1
G1D1
S
D
4090 4090 G1D1
1210
1200
DATE
2"
G1E1 2" 2"
C2D1
A1- CS
1251 G1A1 G1A1
NOTE 2 PDT 1708 10" 1214 1215
353-D1-CS-10"-40H
2"x1"
2"x1"
4090
D
APP'
HVB
HVB
SCW
SCW
FL
FL
FL
2"
D1- CS
L1D1
LAHH
1617
DATE
4091A
NOTE 1
BJB
BJB
BJB
BJB
BJB
BJB
BJB
BY
2" 2" 2"
PDI LO G1D1 G1D1 LC G1D1
4091 LT 1211 1212 1213
4091A
GWR
ZLO ZLC ESD
2" SOV
4090 4090 4090
ONS
ON
PI
4091A
ON
4090
NFORM ATI
SI
G1D1
369- D1- CS- 2"
1202
REVI
LG
SSUED FOR I
NCORPORATED
NCORPORATED
NCORPORATED
PT ZSO ZSC
ON
SOV ZSC ZLC
PTI
4090 4090 4090 2"
4090 4091A 4091A
ON
DESCRI
2"
SDV LCV
I
1203
031 G1E1 G1E1 G1E1 1225 RO ZSO ZLO
-
1248 1249 1250
1800 IA 4091A 4091A 4091A
4090 2"
GN
GN
10"
LED DESI
LED DESI
FROM 0009 2" 370-D1-CS-2"
DETAI
DETAI
1400
1253 .75" .75"
F-4091
CLI
CLI
CLI
NOTE 3 LOW POINT DRAIN G1E1 G1E1
2"
I
1227 1228 PI
L1D1
1600 4091
NT
1
7
0
6
4
FDAH
I
2"
FI
EXT
L1D1
1
FDI
A
B
4090 LAHH
1615
4090 LAH
n Road
4091B N2E1
LAL
1801
gonqui
LALL 1
L
LT
nes,I
50H 2"
UOP LLC
25 EastAl
4091B TO CMGPP-FD-PR-PID-1028
ai
Des Pl
GWR
LINE 353-D1-CS-10"-40H
USA
10"
2" B1D1
2" 1401
G1D1
1204
351- D1- CS- 16"
LG
4091B SOV
4091B
2"
IA
BJB
371-D1-CS-2"
2" 2" 2" 2"
G1D1 G1D1 C2D1
BY
FY FC
1208 1209 1706
D
CHCK'
4092
DATE
.75" .75"
G1E1 G1E1
HVB
2"
NOTE 5
1
4092 L1D1
AGRAM
16"x10" NOTE 6 NOTE 6 NOTE 5 16"x10" 1616
APPVD. BY
10" LINE 352-D1-CS-16"
10" 10" 10"
DATE
.75" FT C2D1
NSTRUM ENT DI
B1D1 B1D1
G1E1 4092 1700 RText (RText)
1442 1443
GAS
JJJ
ETNAM
FOR USERS SPARE F2D1 ZLC ZLO ESD
TP
1300
4091 4091 4091
035
CA M AU GAS PROCESSI
PETROVI
BY
1
PROCESS AND I
.5" .75" .75" .5" .5" .5" .5"
DRAW N
DATE
B1A1 B1A1 B1A1 B1A1 B1A1 B1A1 B1A1
FROM CMGPP-DD-PR-PID-0009 390-A0-CS-2" 1510 1503 1504 1511 1512 1513 1514
NONE
LINE 4133 2" 1"
B1A1 FOR USERS B1A1
1500 1501 ZSC ZSO
SOV
1" 4091 4091
SCALE
4091
RText (RText)
.5" .5" .75" .75" .75" .75" .5" .5" .5" .5" .5" .5"
B1A1 SPARE
B1A1 B1A1 B1A1 B1A1 B1A1 B1A1 B1A1 B1A1 B1A1 B1A1 B1A1 B1A1 SDV
1502 2"x.5"
1515 1516 1505 1506 1507 1508 1517 1518 1519 1520 1521 1522
TP 4091
- 00- UOP
030 150LB 600LB SPARE .5" DRAWING No.: CMGPP-DD-PR-PID-1027
B1A1 IA
FOR USERS
NO.
LINE 0918 2"
NG
DRAW I
FC
EPC UOP
CA MAU GPP PROJECT MANAGEMENT BOARD
1
CA MAU GPP PROJECT MANAGEMENT BOARD
REV.
RText (RText)
X-4092
RELATED
S
RUSSELL, LLC. THI
THE
S
PART OF THI
ENTS
ON
NG
MEMBRANE SKID (Note 5)
TTEN
PI
OLATI
NI
PI
PURPOSE. RECI
THE PLANT AND/OR
NTAI
S A VI
M AI
4500mm x 20000mm x 7000mm
1. FOR START-UP.
NG. NO
AND/OR
PART I
2. BDV IS NOT REQUIRED AS SYSTEM VOLUME IS BELOW 1000kg OF GAS.
S DRAW I
3. PCV-4094A FOR CONTROL IN FULL FLOW OPERATION, PCV-4094B FOR CONTROL IN TURN DOWN OPERATION.
ANY OTHER
N
NG
MDMT: -29°C @ 68 barg
I
MEMBRANE UNIT
OPERATI
PT 4. LINE NUMBERS HAVE 4 DIGITS AND START WITH PREFIX "4".
NG
W HOLE OR
TY OF THI
OPERATI
4093 5. ONE SKID (X-4092) WITH FOUR BANKS (D-4411 TO D-4414)
WI
TY STATEM ENT
FOR
THAN
RUSSELL, LLC
.75" 6. ALARMS ARE NOT REQUIRED PER UOP GUIDELINES BUT CAN BE USED BY OPERATOR AS APPROPRIATE.
ALI
1
AND/OR
.5"
N
I
SHALL NOT BE USED
DENTI
G1E1
N3E1
NG
THE PURPOSES OTHER
THAT I
2252
S DRAW I
FROM CMGPP-FD-PR-PID-1027 2812 377-A1-CS-2"
THE CONFI
ES.
NING
LINE 375-A1-CS-2"
NAL PENALTI
BY UOP
NTAI
ON
OF THI
ALI
NFORM ATI
DENTI
N
NTAI
PM ENT M ANUFACTURED
ON
TO CMGPP-FD-PR-PID-1027 380-A1-CS-3"
ON
ETARY I
M AI
CATI
MI
NFORM ATI
CONFI
CRI
FOR
LINE 380-A1-CS-3"
L AND
PROPRI
G1E1
USED
S I
2259 .75" NOTE 1
VI
N. THI
G1E1
CI
OR
2" 2"
N
2237
NS CERTAI
6"
S SUBJECT TO
354-D1-CS-6"-40H
M AY BE REPRODUCED
EQUI
L1D1 B1D1
HEREI
1 SC
2612 2433
FOR
6" 6" 4411B PT PI
RELATED
TP FEED
CONTAI
BED
B1D1 B1D1 D1-CS A1-CS .75"
DED
4411B 4411B DETAIL 1
GAS
PM ENT DESCRI
G1E1
S PROVI
2408 2409
I
062
CONSENT OF UOP
2261 A
GHT AND
.75"
PLANT AND/OR
A .5" .75"
NG
D1-CS A1-CS B1D1 3"
S DRAW I
N3E1 G1E1
I
2437
NG
NG
C 2" 2809 2245
COPYRI
DRAW I
DRAW I
D-4411 BANK 363-D1-CS-6" 40H
EQUI
THI
2" (SEE DETAIL 1)
6" 6" 2" 2"
2" 2" 2" 2" B1D1 B1D1 TUBE / D-441X-A
L1D1 C2D1 G1D1 G1D1 B 2424 2425
DATE
4411 4411
G1E1 2" 2"
L1D1 B1D1 .
2257
4"
3"
3"
4"
6"
SC 2611 2432 .
PT PI
4411A 6 TUBES
D
.75" D1-CS
APP'
A1-CS
HVB
HVB
SCW
SCW
4411A 4411A
FL
FL
FL
1 TE .
B1D1
.75"
TP 2441 4411 G1E1 .
DATE
2" 2808 2244 3"
358-D1-CS-6"
3"
3"
4"
4"
6"
40H
6" 6"
B1D1 B1D1
.75"
BJB
BJB
BJB
BJB
BJB
BJB
BJB
2" 2"
BY
2422 2423
G1E1 NOTE 1 TUBE / D-441X-F
2236
6" 355-D1-CS-6"-40H 2" 2"
1 SC
L1D1 B1D1
2" 2"
6" 6" 4412B PT PI 2610 2431
B1D1 B1D1
TP
4412B 4412B D1-CS A1-CS
2406 2407 6"x3" 6"x3"
064
ONS
ON
A .75"
ON
D1-CS A1-CS B1D1 6"
NFORM ATI
SI
N3E1 G1E1
2436
C 2" 2807 2243
REVI
D-4412 BANK 364-D1-CS-6"
2" 6"x4" RESIDUE 6"x4"
(SEE DETAIL 1) B
6" 6" GAS
SSUED FOR I
2" 2" 2" 2" B1D1 B1D1
NCORPORATED
NCORPORATED
NCORPORATED
L1D1 C2D1 G1D1 G1D1 B 2420 2421
ON
6"
2603 2704 2220 2221 TT TI C
PTI
NOTE 1
.75"
4412 4412
ON
DESCRI
2" 2" PERMEATE
G1E1
GAS
2256 L1D1 B1D1
I
2609 2430
-
.75"
4412A 4412A D1-CS A1-CS
1 TE
GN
GN
B1D1
LED DESI
LED DESI
2440 4412
TP
.5" .75"
N3E1 G1E1
063
2" 2806 2242
359-D1-CS-6"
DETAI
DETAI
CLI
CLI
CLI
6" 6"
I
B1D1 B1D1
.75"
2418 2419
G1E1 NOTE 1
NT
1
2235
0
6
4
6"
I
356-D1-CS-6"-40H 2" 2"
1 SC NOTE 6
EXT
L1D1 B1D1
1
0
A
B
6" 6" 4413B PT PI 2608 2429 PAH
B1D1 B1D1
TP
4413B 4413B D1-CS A1-CS PIC
n Road
2404 2405
066
.75" 4094
A .5" .75"
gonqui
D1-CS A1-CS B1D1
N3E1 G1E1 PAL
L
nes,I
2435
UOP LLC
C 2" 2805 2241
25 EastAl
D-4413 BANK 365-D1-CS-6"
ai
PZI PZI
Des Pl
2" (SEE DETAIL 1)
USA
6" 6"
4094B 4094A
2" 2" 2" 2" B1D1 B1D1
L1D1 C2D1 G1D1 G1D1 B 2416 2417
2602 2703 2218 2219 TT TI NOTE 1
.75"
4413 4413
G1E1 2" 2"
2255 L1D1 B1D1 PY
SC 2607 2428
PT PI 4094B
4413A
.75"
4413A 4413A D1-CS A1-CS
1 TE
B1D1 PZT PCV
2439 4413
TP 4094B 4094B ZLC ZLO ESD
.5" .75"
N3E1 G1E1 4094 4094 4094
065
2" 2804 2240
360-D1-CS-6"
6" 6"
B1D1 B1D1 3"
.75" 2414 2415 FC
G1E1 NOTE 1
2234
6" 357-D1-CS-6"-40H 2" 2"
1 SC PY
L1D1 B1D1 ZSC ZSO
6" 6" 4414B PT PI .75" SOV
2606 2427 4094A 4094 4094
BJB
A .75" LOW POINT
.5" .75" 4094
D1-CS A1-CS B1D1 DRAIN 4094A 4094A
N3E1 G1E1
2434 .5" 600LB 150LB
C 2" 2803 2239 IA
N3E1
BY
D-4414 BANK 366-D1-CS-6"
2811
D
CHCK'
2" (SEE DETAIL 1) TO 0009
DATE
6" 6"
1 2" 2" 2" 2" B1D1 B1D1 8" NOTE 3 8" 8" 2" LINE 0915
.75"
HVB
LINE 353-D1-CS-10" 4414 4414 LOW POINT
G1E1 2" 2" LOW .75"
.75" DRAIN
2254 L1D1 B1D1 G1E1 033
POINT
AGRAM
G1E1 SC
APPVD. BY
4414A
LOW POINT DRAIN .75" D1-CS A1-CS PAH TAH 4095 4095 4095
1 4414A 4414A
DATE
B1D1 TE
NSTRUM ENT DI
2438
PI TT TI
TP 4414 RText (RText)
GAS
JJJ
361-D1-CS-6"
ETNAM
SOV
4095 4095
6" 6" 4095
B1D1 B1D1 PT TE
CA M AU GAS PROCESSI
SDV
PETROVI
TP
BY
PROCESS AND I
2410 2411 4095 4095
DRAW N
4095
DATE
032
.5" IA
NONE
N3E1
10" 2810 362-D1-CS-10" TO 0009
SCALE
RText (RText)
- 00- UOP
FROM CMGPP-FD-PR-PID-1801 352-D1-CS-16" 2613 DRAWING No.: CMGPP-DD-PR-PID-1028
LINE 352-D1-CS-16"
NO. NG
DRAW I
CA MAU GPP PROJECT MANAGEMENT BOARD
1
CA MAU GPP PROJECT MANAGEMENT BOARD
REV.
RText (RText)
PETROVIETNAM GAS JOINT STOCK CORPORATION
CA MAU GPP PROJECT MANAGEMENT BOARD
PEN - PTSC
CONSORTIUM
PEN - PTSC
CONSORTIUM
A-4003
PEN - PTSC
CONSORTIUM