You are on page 1of 7

WEST AFRIC

A CAN OILFI
O IELD SER
RVICE
ES

Refurrbishment of SPM bu
uoy on-goi ng at Ogbo
ogoro - 2019
West Africcan Oilfield Serv
rvices
Plot 72/73 Trans-Amadi Industrial Layoout
Port Harcoourt, Rivers Sta
ate, Nigeria
Tel: +234 884 302678
email: enqquiries@waosgroup.com

WAOS – Company Capabilities 
The Comple
C ete Package
West African Oilfield Services
S AOS) does it all: Procurem
(WA ment, Installa
ation, Fabrica
ation, Constru
uction,
upport, with end-to-end pro
Marine Su oject manage
ement directin
ng and supporrting servicess.

Our comprehensive ‘o one stop shop’ places us u amongst West Africa’’s premier E EPIC and turrn-key
providers.. WAOS’ un nrivaled in-co
ountry experiience, backe d by in-housse capabilitie es and equip pment,
delivers tiime-proven, practical
p and cost-effective
e solutions to
o best value at every stag ge of your prroject.
Our ongoing mission is s to continue growing WAO OS as the turnnkey contracttor of choice iin the West A
African
market.

MANAGE EMENT EXPE ERIENCE


 Estabblished presen
nce in West Africa
A for overr 40 years,
 Unrivaaled regional project mana agement reso ources
 Straig
ght line accountability integ
grity.

E AND EQUIP
SERVICE PMENT
 End-to-end service quipment and seasoned pro
es with the eq rofessionals to
o execute.
 Adapttive solutions to enhance project
p value and return on
n investment
 Commmitment to 100% client satisfaction.

VALUE DRIVEN
D
 Turn-key solutions that exceed customer exp pectation
 Compprehensive prroject capabilities: proven success.
s
 Best “all-in”
“ solutio
on for West Affrican projects
s.

BUSINES
SS OVERVIEW
W

WAOS operations are e directed from the Projects Office llocated in La agos and su
upported from
m our
operation bases in Trans-Amadi and d Ogbogoro, Port Harcourtt - Rivers Sta
ate.

Since commmencementt in 1968, WA AOS busines


ss has expannded these fa acilities, equip
pment, experrience
and capacity as requirred to professionally execcute the rang
ge of turn-keyy onshore, sw wamp, coastaal and
offshore services
s for th
he delivery of::

 Onshore and Offsh hore Fabricatiion  M


Marine constrruction (Offsh
hore and Swaamp)
 Gatheering facilities
s  M
Marine servicces (Offshore and Swamp))
 Offshore platforms s (const. and maint.)
m  B
Buoy refurbisshment
 Flow stations  M
Marine terminnals and loading buoys
 Comppression facilities  C
Commissionin ng and Hook--Up
 Gas processing
p an
nd handling fa
acilities  P
Pipelines (Offfshore, Swammp or Land ba
ased)
 Measurement and metering sys stems

NY FACILITIE
COMPAN ES

WAOS – Company Capabilities 
              

MAJOR PLANT
P AND EQUIPMENT
T
DESCRIPTION NUMBER DESCRIPTI ON NUMBEER
120 ton Crane 1 5 - 15 ton Fo
orklifts and Pa
ayloaders 5
100 ton Crane 1 60 - 360 KVA
A Generatorss 9
80 ton Cra
anes 2 Welding Macchines (Diese
el & Electric) 24
60 - 70 ton
n Cranes 2 Lathes, Proffilers & Grindiing Machiness 7
35 - 40 ton
n Cranes 3 Blasting and
d Coating Macchines 6
20 - 25 ton
n Cranes 2 600hp to 900
0hp Pusher T
Tugs 2
Truck and 40ft Trailers 5 Fuel, Water and Flat Top
p Barges 4

TRANS AMADI
A YARD
D

The 10.5 acre Port Harcourt site inc


cludes offices
s and living fa
acilities, equip
pment and ve
ehicle repair sshops,
expansivee warehousinng, fabrication
n, blasting, coating
c and lay-down are ea for both C
Client and W WAOS
materials and spare pa
arts

Section off Trans Amad


di Yard & Main Office Block
k Trans Am
madi Fabricattion Worksho
op – 2,700m2

Mobile Crranes at Trans


s Amadi Pipeline
e spool fabriccated at Transs Amadi - 201
14
WAOS – Company Capabilities  
              

OGBOGO
ORO YARD

WAOS’s quayside
q ope
eration at Ogbogoro is loc cated approxi mately forty m minutes Wesst of Port Harrcourt.
Situated along
a the Neww Calabar Riv ver, the facilitty provides a ccess to the inter-coastal waterways as well
for deep draft offshoree vessels. Ogbogoro
O yarrd facilities co
onsist of approximately 10 0.5 acres witth just
over 200 meters of us sable water frrontage, all of which is sh eet-piled. Se everal section ns of the qua
ayside
have been structurally y fortified to provide
p load out
o capacity for structuress up to 2,000 0 tons. The water
frontage has
h a minimum draft of 3 metres
m at LATT and the wat erway from th he jetty is navvigable even aat low
tide for ve
essels in exce
ess of 5,000 toons.

Office block at Ogbogo


oro – 270m2 Covere
ed fabrication
n workshop att Ogbogoro 5
550m2

Transportt Frame consttructed at Ogb


bogoro - 2013
3 Pushe
er tugs and ba
arges at Ogbo
ogoro

WAOS – Company Capabilities  
WAOS WORK
W K EXPERIENCEE LISTING 

Datee Project Client


1993-19
994 Swam
mp Flow lines construction Shell
1993-19
999 Crane
e Hire Service
es Contract Shell
1995-19
996 Abogborodo Platfo
orm fabrication and pipeline
e installation Chevron
1997
7 Majorr overhaul of 1 x G342 Catterpillar Engin
ne SPDC
1997
7 Endop Gas re-injection project EPFIC projecct Mobil
1998
8 Akkon
no and Eng
gon Jacket installation
i – North Devvelopment Precten
Project
1998
8 Jacke
et pillings installation sea is
sland project N
NNPC/IPCO
1998
8 Offshore Facilities Inspection – Subsea Divin
ng Operation Chevron
1999
9 Mech
hanical Mainte
enance Contrract Shell
2000
0 Robertkiri No.14 Well
W Head Pro
otector and asssociated pipiing Chevron
2002
2 Rehabilitation of Okpoko
O Flowstation and Ga
as Lift Line Elf
2002
2 Gas Line
L Fabrication and Rerou
uting Elf
2002-20
004 Haula
age of Oilfield
d materials Dautag
2002-20
007 Provis
sion of Heavy
y marine Equipment for ea
astern Operatiions Shell
2003-20
007 Provis
sion of Thre ee Offshore Standby Vesssels for Su
urveillance Shell
Contrract
2003
3 Install of Maren x Jacket
J and Piillings Chevron/
Horizon
2003
3 Haula
age of Oilfield
d Materials Saipem
2004
4 Install of maji 43 Ja
ackets and Pillings and Ca
aissons Chevron/
Horizon
2004
4 Rig move
m contract NPDC
2004-20
005 Haula
age of Oilfield
d Materials Saipem
2006
6 Fabric
cation and Lo
oad out of Mejji Riser Platfo
orm and Bridg
ge Chevron
2006
6 Flow lines construc
ction and Gas
s lift repairs Shell
2007-20
008 Provis
sion of Consttruction Interv
vention and R
Remediation S
Services Addax
2012 –2013 Mobil
Ubit GY
G Pigging Fa
acilities and Fuel
F Gas Upg
grade Project Phase 1
2012
2 Mobil
De-Oiling and Flus
shing of 24" x 2km Usari F R-FA Pipeline
e
2012
2 Riser Repair Progrram-16" Inim IP from Enanng JA Crude RRiser Mobil
Repair(Inim IP End
d)
2012
2 Mobil
42" QIT
Q -BOP HA Subsea AUT Inspection
WAOS – Company Capabilities 
2012 - 2013 Mobil
24" Id
doho BP - SSM Subsea AU
UT Inspection
n
2013
3 Mobil
16" Oso
O RK from Nsimbo
N WA Gas
G Riser Rep
pair (Oso RK))
2013
3 Mobil
12" Asabo
A MP from
m Asabo MC Crude Riser (Asabo MP E
End)
2013
3 12" Asabo
A MB from
m Asabo MD Crude Gas R
Riser Repair P
Project Mobil
2013
3 4" Asabo MP to As
sabo MA Gas
s Riser Repairr Project Mobil
2013
3 12" Asabo
A MD to Asabo
A MB Crude Gas Rise
er Repair Projject Mobil
2013
3 Mobil
12" Is
sobo PA - SST
T Subsea AU
UT Inspection
2013
3 Mobil
Edop
p QB Platform
m Inspections
2013
3 24" Usari
U FR -Idoh
ho BP Crude Pipeline(Eme
P ergency Workk) Mobil
2013
3 Use of
o HD Contender Vessel fo or Survey of 1
10 - Mesxxub
b Mobil
Riser(Dive & Rope e Access Servvices)
2013
3 Asaboo Restorationn Project(Asab
bo MG/MB/M MQ ,E& I Repa
air ,Piping Mobil
and Structural
S Insttallation)
2013
3 Mobil
Chartter of Bourbon
n Supply boat
2013
3 Mobil
Chartter of Bourbon
n Crew boat
2013
3 Mobil
Chartter of Bourbon
n Crew boat

2013 Mobil
Chartter of Bourbon
n Crew boat

2013 Mobil
Chartter of Bourbon
n Crew boat

2013 Mobil
Chartter of 1 Supply Boat from Rangk
R

2013 Use of
o HD Contender Vessel fo
or LERM of En
nang and Etim
m Mobil

2013 Provis
sion of Air Co
ompressor to support Well Servicing Wo
orks on Mobil
Jasco
on 28

2013 Provis
sion of Air Co
ompressor to support Worrks on EAP Mobil

2013 16" Ubit
U GP from Utue
U KP Crud
de Riser Repa
air(Ubit GP En
nd)-Using Mobil
Mexssub method
2013 -20
014 Deoiling & Flushing Services fo
or 3 x Pipeline
es Mobil
2013 - 2014 1996 Idoho Risers
s Demolition Project.
P Mobil
2013 - 2014 Offshore Security Upgrade Projject -Complettion of Oso Mobil
Installations
2014
4 Deoiling,De -Sanding and Dryin
ng of 16" Ekpee - Asabo exiisting Mobil
Crudee Pipeline
2014
4 20" Mfem
M DB to Unam CC Crud
de Riser Repa air -Using Me
exssub Mobil
methood
2014
4 12" Etim
E LP to Inim
m IP Crude Riser-Using Me
exssub Repair Method Mobil
2014
4 6" Ub
bit GY from EA
AP GR Gas Riser
R Repair ((Mexssub Me
ethod) Mobil
2014
4 Oyot A Gas Lift Project Mobil

WAOS – Company Capabilities 
2014
4 Chartter of Bourbon
n Crew boat Mobil
2014
4 Chartter of Bourbon
n Crew boat Mobil
2014
4 Chartter of Bourbon
n Crew boat Mobil
2014
4 Chartter of Bourbon
n Crew boat Mobil
2014
4 Chartter of Bourbon
n Crew boat Mobil
2014
4 Chartter of Bourbon
n AHTS Mobil
2014
4 Chartter of Rangk Supply
S Vesse
el Mobil
2014
4 Chartter of Bourbon
n Supply Vessel Mobil
2014
4 24" Asabo
A Flare Riser
R & Flare Stack
S Repair((Asabo FS En
nd) Mobil
2014
4 OTS Structural Airr Dive Inspecttions Project Mobil
2014
4 Use of
o HD Contender to Suppo
ort Flushing Acctivities at Iya
ak SA Mobil
Ongoin
ng Idoho
o BP -Edop SS
SM 24in Rise
er and |Subse
ea Spool Mobil
Ongoin
ng SPM Buoy Refurbishment Shell 
Ongoin
ng 12" Etim
E LA to Etim
m LP Crude Riser
R Repair ( Etim LP End
d) Mobil
Ongoin
ng OTS Structural Airr Dive Inspec
ctions Project Mobil

WAOS – Company Capabilities 

You might also like