Professional Documents
Culture Documents
GB Code Checklist - Architectural - 27apr2017
GB Code Checklist - Architectural - 27apr2017
As-built Drawings
Operable windows or balcony doors at least Applies to regularly Architectural floor plans, Ocular Inspection &
a occupied spaces 10% Not Complied Building elevations &
Verification
10% of room space floor area sections
b Operable window with safety features Window Schedule Product labels
Operable Window Brochures & Catalogs
Computation Table
Window Details on Shopdrawings
operation & safety
As-built Drawings
Required? Complied? Documentation Document Documentation Document
10.1.4 Building Envelope Color needed Design Specification Relevant needed GB Measure Applied
Provided? Provided?
Applies to all
Building metal roof surface color white or with building occupancies Ocular Inspection &
a without exceptions Roof plan Verification
min. SRI of 70
Technical specs of roof Product labels
Brochures & Catalogs
Shopdrawings
As-built Drawings
Thermal Document Document
10.1.5 Roof Insulation Resistance Design Value Documentation
needed Design Specification Relevant Documentation
needed GB Measure Applied
Calculator Provided? Provided?
Roof insulation at least R-8 in thermal Ocular Inspection &
a Applies to all R-8.0 1.17 Roof plan & section
Verification
resistance building occupancies
without exceptions Technical specification of Product labels
insulation
Roof Insulation Brochures & Catalogs
Computation Table
Shopdrawings
As-built Drawings
Electrical Systems Yes/No Yes/No Remarks Yes/No Yes/No Remarks
Required? Complied? Documentation Document Documentation Document
10.6.1 Daylight Provision needed Provided? Design Specification Relevant needed Provided? GB Measure Applied
a Building site and erosion control Applies to all Site Erosion and Ocular Inspection &
Pollution mitigation and construction safety building occupancies Sedimentation Control Plan Verification
b without exceptions
per Rule XI of the NBC
c Storm water collection management plan Technical specifications in Shopdrawings
support of the erosion &
d Storm water collection facilities control plan As-built Drawings
14.2 Open Space Utilization USA Calculator Design Value
Applies to all Ocular Inspection &
a Minimum 50% of the required Unpaved building occupancies 50% Not Complied Site Development Plan
Verification
Surface Area (USA) shall be vegetated without exceptions
Technical specifications Shopdrawings
USA Computation Table As-built Drawings
DECLARED BY Signature Signature Signature
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
100% 0.24 0.35 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
TOTAL 0.00 0.00
Return to Architectural GB Checklist
Height from D/H Correction Vertical Distance from D/H Correctio ADJUSTE
Window Sill to Factor Fin Depth Opposite n Factor D SHGC
Bottom of (m) Window Edge
Overhang (m) to Fin (m)