1) The document is a risk assessment form from UltraTech Cement assessing risks for concrete pouring and compaction activities at a TATA PROJECTS construction site.
2) It identifies hazards like concrete splashing into eyes and burns to skin from pouring concrete into a ramp wall. It rates this risk as high and lists steps to minimize risk like wearing PPE.
3) Compacting concrete with a vibrator at 2.5 meters presents risks of splashing into eyes, falls from height, and burns to hands. This risk is also rated as high, and safety measures are outlined like using a secured platform and wearing proper PPE.
1) The document is a risk assessment form from UltraTech Cement assessing risks for concrete pouring and compaction activities at a TATA PROJECTS construction site.
2) It identifies hazards like concrete splashing into eyes and burns to skin from pouring concrete into a ramp wall. It rates this risk as high and lists steps to minimize risk like wearing PPE.
3) Compacting concrete with a vibrator at 2.5 meters presents risks of splashing into eyes, falls from height, and burns to hands. This risk is also rated as high, and safety measures are outlined like using a secured platform and wearing proper PPE.
1) The document is a risk assessment form from UltraTech Cement assessing risks for concrete pouring and compaction activities at a TATA PROJECTS construction site.
2) It identifies hazards like concrete splashing into eyes and burns to skin from pouring concrete into a ramp wall. It rates this risk as high and lists steps to minimize risk like wearing PPE.
3) Compacting concrete with a vibrator at 2.5 meters presents risks of splashing into eyes, falls from height, and burns to hands. This risk is also rated as high, and safety measures are outlined like using a secured platform and wearing proper PPE.
UltraTech Cement PVT LTD Risk Assessment form for concrete pouring & Compaction Date 26-10-2021
Client TATA PROJECTS PVT LTD Location
s.no Activity Hazards probability severity Risk Rating Minimize Risk to Acceptable level probability severity Residual Risk Responsibile person 1 Pouring concrete into splashing into 3 3 9 goggles must be worn, hand gloves, 2 2 4 site Engineer the ramp wall eyes,concrete sleeves, use proper PPE, burns to hands competence workers involved. and feet, skin infection 2 compaction of splashing into 3 4 12 use secured platform, worn hand 2 2 4 site Engineer concrete by using eyes, fall from gloves and goggles, worn safety vibrator at 2.5metre height, burns to helmet, safety shoes, competence height hands. persons involved, Equipment inspected before use.
RISK MATIX: (Risk rating = Probability x severity)