You are on page 1of 3

JOB SAFETY ANALYSIS PT. RADIANT UTAMA INTERINSCO Tbk.

SIGNATURE OF
JOB DESCRIPTION : ULTRASONIC TEST FOR CORROSION MONITORING PRESSURE VESSEL DATE OF ISSUE : March. 17. 2011
SUPERVISOR
AREA/TAG NO/EQUIPMENT DESCRIPTION : PERTAMINA EP - CEPU REVIEWED BY :

REFERENCES : PERTAMINA EP - HSE LAST REVIEWED DATE :

SAFETY EQUIPMENT (PPE) REQUIRED TO DO THIS JOB : Hand gloves, safety shoes, safety hats, masker, safety harness, ear plugs.

Sequence of Basic Job Steps Machine/Equipment /Tool Potential Accidents or Recommendations to Eliminate or Reduce
Involved in each step Hazards Potential Hazards
1. Prepare work permit, materials, tools and • Wire brush • Wire brush • Safety Meeting before starting the job.
equipments to be used for the job. • Hand gloves failure causing • The PPE must be used when do the job.
• Masker hand injury. • Wash after handling, and before eating,
• Ear Plugs • Slip or fall drinking or smoking.
• Safety harness • Unusual fire and explosion hazards.
• Don’t expose to extreme heat.

2. Minimum surface pressure vessel preparation • Wire brush • Wire brush • Be careful when used wire brush and
• Hand glove failure causing equipment.
• Masker hand injury. • The PPE c/w safety harness & work vest shall
• Ear Plugs • Slip or fall be used when do the job.
• Safety harness • Make sure the pipe was clean as minimum
preparation. Wash after handling, and before
eating, drinking or smoking.
• Unusual fire and explosion hazards.
• Don’t expose to extreme heat.
• Make sure safety harness in safe
installation/position
3. Phase I for conduct thickness measurement • Wire brush • Wire brush • The PPE must be used when do the job.
• Hand glove failure causing • Be careful when conduct the job.
• Masker hand injury. • Make sure the materials save in the correct
• Ear Plugs • Slip or fall place.
• Safety harness • Wash after handling, and before eating,
• Thickness meter drinking or smoking.
(UT equip.) • Unusual fire and explosion hazards.
• Don’t expose to extreme heat.
• Put in Garbage in the correct place.
4. Phase II for install marks area of inspection • Wire brush • Wire brush • The PPE must be used when do the job.
• Hand glove failure causing • Be careful when do the job.
• Masker hand injury. • Make sure the materials save in the correct
• Ear Plugs • Slip or fall place.
• Safety harness • Wash after handling, and before eating,
drinking or smoking.
• Unusual fire and explosion hazards.
• Don’t expose to extreme heat.
• Put in garbage in the correct place
5. Phase III for storage equipments • Thickness meter • • Make sure all equipments stored in the correct
(UT equip.) place.
• Wash after handling, and before eating,
drinking or smoking.
• Put in garbage in the correct place.
This sheet is to record that Personnel noted below have been made aware of the nature of the task to be carried out; any potential hazards associated with the completion of
this task and any additional work activities which could impact on safe completion of this task. It can be used as an aid by work leader.

Are you satisfied that:


• You have seen, briefed and understood all Work Permits, Work Procedure, and Job Safety Analysis?
• You understand your responsibilities for both the work activity and safe working practices?
• You have the correct tools and equipment for the job?
• You know how to access and exit the work site safely, the nearest emergency telephone or fire alarm point is?
• You are aware what action to take in an emergency?
• You have all the necessary and specified personnel protective equipment?
• You have received MSDS advice on any materials or substances you may come in contact with?
• You have considered the work environment?
• You understand how you will control waste?
• You have considered conflicting activities?
• You are PTW trained and competent to carry out the task?

You might also like