Professional Documents
Culture Documents
APPLICABLE / NOT
SL NO PARAMETERS FREQUENCY
APPLICABLE
As per Drawing (A), (S),(F) & (M) mentioned parameters are considered for
1 Once in 6 month's A
Cp, CpK
Raw material Mechanical & Chemical Test certificate as per drawing
2 Once in 3 month's NA
(standard).
5 Salt Spray - Plating, Powder Coating, Painting & ED Coating Once in 6 month's NA
Lot and Line rejection Containment Action < 24hrs, Root Cause Analysis(5why)< 5days, & Prev.
6 A
Action (PDCA) <10 days
Supplier is required to submit PPAP
7 A
for every new development or process / material / design change
Marked (S) Safety Parameter : Parameters affecting Assembly, Tensile Strength, Weld Strengths &
8 A
Parts Strengths Cpk should be control > 2
9 Marked (F) Critical Fit / Function : Parameters affecting performance. Cpk should be control > 1.67 A
Marked (M) Major Fit / Function : Parameters affecting Product assembly. Define samples Inspection
10 A
Plan in Control Plan & Lot Inspection to Pass Defined sampling Plan
A) Material Specification:
NIL
B) Dimensional :
3 BOTTOM THICKNESS 3.80 / 4.20 Dial with DHG Dial with DHG
Note - As per SCP RPN : (S)-Safety /Regulation ( 9 -10 ) , (F) -Critical fit /function ( 8 -5 ) , (M)-Major fit/function ( 2 - 4) .
C) Mechanical properties :
NIL
D) Performance Characteristics :
NIL
E) Visual (including appearance item) :
F) Packing Standard :
QTY:
G) Cleaning Standard :
NIL
NIL
NOTE :
DIMENSIONAL 5 8 13 20 32
TIGHTENED
SAMPLING 10 16 26 40 64
PERFORMANCE /
DESTRUCTIVE 2 2 2 3 5
SUPPLIER SAMPLING PLAN SHOULD BE SAME OR MORE THAN SCP SAMPLING PLAN
Other non-defined requirements will be in accordance with applicable National/ International standard