1 -Determine the differences between what has been defined in the maintenance plan
and what has already been accomplished, and this is done by issuing a monthly report
on all the achievements of maintenance work and comparing them with the work laid
out in the plan in advance.
2 -Defining and analyzing the causes of the difference and studying them by the
maintenance officials and knowing their causes such as the negligence of the
maintenance team, a shortage of labor, a shortage of tools or even a lack of spare
parts
3- Taking corrective measures in that, and once the maintenance officials know the
reasons for the differences, recommendations and corrective actions can be submitted
to all the different departments that have a relationship with the matter in the facility
to contribute to the end of these reasons or not to occur after that.