SCHEDULE “C”
ATTACHMENT I
Percent of
2 MATERIALS PRICE BREAKDOWN (B)
Materials Price
V. TILE WORKS
1 NON-SLIP CERAMIC TILES - 400 x 400 x 10 MM THK M2 9234.95 92.00 849,615.40 0.52 4,779.09 11.06 102,127.00 0.00 0.00 4.60 42,480.77 15.66 144,607.77 107.66 994,223.17 29.15 269,202.35 136.81 1,263,425.53
2 NON-SLIP PORCELAIN TILES - 400 x 400 MM M2 2064.15 89.00 183,709.49 0.52 1,068.20 11.06 22,826.94 0.00 0.00 4.45 9,185.47 15.51 32,012.41 104.51 215,721.90 28.30 58,410.27 132.81 274,132.17
3 CARPET TILES - 500 x 500 M2 8817.44 350.00 3,086,103.02 0.35 3,042.02 7.37 65,006.56 0.00 0.00 17.50 154,305.15 24.87 219,311.71 374.87 3,305,414.73 101.50 894,995.66 476.38 4,200,410.38
4 GRANITE TILES - VITRIFIED, POLISHED, DESERT BROWN COLOR M2 1265.33 460.00 582,052.95 1.55 1,954.94 30.72 38,874.18 0.00 0.00 23.00 29,102.65 53.72 67,976.83 513.72 650,029.78 139.10 176,006.30 652.82 826,036.08
5 ANTI STATIC VINYL TILES M2 294.80 94.00 27,711.29 0.35 101.71 7.37 2,173.42 0.00 0.00 4.70 1,385.56 12.07 3,558.99 106.07 31,270.28 28.72 8,466.94 134.79 39,737.22
6 GRANITE - 600 x 150 MM, WALL BASE LM 1104.15 72.00 79,498.58 0.31 341.18 6.14 6,784.43 0.00 0.00 3.60 3,974.93 9.74 10,759.36 81.74 90,257.94 22.13 24,438.83 103.88 114,696.77
7 VINYL BASE - 100 MM LM 245.99 25.00 6,149.79 0.05 12.73 1.11 272.04 0.00 0.00 1.25 307.49 2.36 579.53 27.36 6,729.32 7.41 1,822.07 34.76 8,551.39
8 WOODEN BASE - 100 MM LM 8705.44 18.00 156,697.95 0.08 675.76 1.66 14,440.70 0.00 0.00 0.90 7,834.90 2.56 22,275.59 20.56 178,973.55 5.57 48,460.04 26.13 227,433.59
9 CERAMIC TILE - 100 MM, BASE LM 9458.10 21.00 198,620.01 0.08 734.18 1.66 15,689.21 0.00 0.00 1.05 9,931.00 2.71 25,620.21 23.71 224,240.22 6.42 60,716.74 30.13 284,956.96
X PRECAST WORKS
Cast Steel for 3" & above. PVC for sizes below 3"
1.1 8" Diameter LM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.2 6" Diameter LM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.3 4" to 1" Diameter LM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B. BLDG 122-123 LOT 1.00 6,613,922.80 6,613,922.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,613,922.80 6,613,922.80 1,790,828.89 1,790,828.89 8,404,751.69 8,404,751.69
VII. HVAC EQUIPMENT
1 FAN COIL UNITS
FAC-01
1.1 EA 124.00
Zamil CWX10 0.00 24.76 3,070.24 791.98 98,205.52 416.00 51,584.00 0.00 1,207.98 149,789.52 1,207.98 149,789.52 327.08 40,557.99 1,535.06 190,347.51
TC/SC 13560 /10848 BTUH
SA/OA 750/50 CFM
1/2 HP motor
230/1/60
Built in Heater 2.0 KW, 1 stage
230/1/60
1.1.1 Chilled water piping connection LOT 124.00 0.00 33.16 4,111.84 1,216.18 150,806.32 416.00 51,584.00 0.00 1,632.18 202,390.32 1,632.18 202,390.32 441.94 54,800.52 2,074.12 257,190.84
1.1.2 Drain connection LOT 124.00 0.00 24.96 3,095.04 714.08 88,545.92 0.00 0.00 0.00 714.08 88,545.92 714.08 88,545.92 193.35 23,975.27 907.43 112,521.19
1.1.3 Power connection LOT 124.00 0.00 24.96 3,095.04 810.08 100,449.92 0.00 0.00 0.00 810.08 100,449.92 810.08 100,449.92 219.34 27,198.48 1,029.42 127,648.40
1.1.4 Controls with wall mounted thermostat LOT 124.00 0.00 24.96 3,095.04 858.08 106,401.92 0.00 0.00 0.00 858.08 106,401.92 858.08 106,401.92 232.34 28,810.08 1,090.42 135,212.00
FAC-002
1.2 EA 68.00
Zamil CWX12 0.00 24.76 1,683.68 791.98 53,854.64 416.00 28,288.00 0.00 1,207.98 82,142.64 1,207.98 82,142.64 327.08 22,241.48 1,535.06 104,384.12
TC/SC 20900/16720 BTUH
SA/OA 850/50 CFM
1/2 HP motor
230/1/60
Built in Heater 2.0 KW, 1 stage
230/1/60
1.2.1 Chilled water piping connection LOT 68.00 0.00 33.16 2,254.88 1,216.18 82,700.24 416.00 28,288.00 0.00 1,632.18 110,988.24 1,632.18 110,988.24 441.94 30,051.90 2,074.12 141,040.14
1.2.2 Drain connection LOT 68.00 0.00 24.96 1,697.28 714.08 48,557.44 0.00 0.00 0.00 714.08 48,557.44 714.08 48,557.44 193.35 13,147.73 907.43 61,705.17
1.2.3 Power connection LOT 68.00 0.00 24.96 1,697.28 810.08 55,085.44 0.00 0.00 0.00 810.08 55,085.44 810.08 55,085.44 219.34 14,915.29 1,029.42 70,000.73
1.2.4 Controls with wall mounted thermostat LOT 68.00 0.00 24.96 1,697.28 858.08 58,349.44 0.00 0.00 0.00 858.08 58,349.44 858.08 58,349.44 232.34 15,799.08 1,090.42 74,148.52
2 AIR HANDLING UNITS
AHU-01
2.1 UNIT 1.00
Zamil BWY10 0.00 24.76 24.76 791.98 791.98 416.00 416.00 0.00 1,207.98 1,207.98 1,207.98 1,207.98 327.08 327.08 1,535.06 1,535.06
TC/SC 168000/99808 BTUH
SA/OA 3482/1232 CFM. Pre filter 2" & Bag
Filter 24"
3.0 HP motor
460/3/60
Built in Heater 15.0 KW, 3 stage
460/3/60
2.1.1 Chilled water piping connection LOT 1.00 0.00 33.16 33.16 1,216.18 1,216.18 416.00 416.00 0.00 1,632.18 1,632.18 1,632.18 1,632.18 441.94 441.94 2,074.12 2,074.12
2.1.2 Drain connection LOT 1.00 0.00 24.96 24.96 714.08 714.08 0.00 0.00 0.00 714.08 714.08 714.08 714.08 193.35 193.35 907.43 907.43
2.1.3 Power connection LOT 1.00 0.00 24.96 24.96 810.08 810.08 0.00 0.00 0.00 810.08 810.08 810.08 810.08 219.34 219.34 1,029.42 1,029.42
2.1.4 DDC Control Panel with accessories LOT 1.00 0.00 24.96 24.96 858.08 858.08 0.00 0.00 0.00 858.08 858.08 858.08 858.08 232.34 232.34 1,090.42 1,090.42
AHU-02
2.2 UNIT 1.00
Zamil BWY07 0.00 20.76 20.76 663.98 663.98 416.00 416.00 0.00 1,079.98 1,079.98 1,079.98 1,079.98 292.42 292.42 1,372.40 1,372.40
TC/SC 98000/60890 BTUH
SA/OA 2110/770 CFM. Pre filter 2" & Bag Filter
24"
2.0 HP motor
460/3/60
Built in Heater 10.0 KW, 2 stage
460/3/60
2.2.1 Chilled water piping connection LOT 1.00 0.00 33.16 33.16 1,216.18 1,216.18 416.00 416.00 0.00 1,632.18 1,632.18 1,632.18 1,632.18 441.94 441.94 2,074.12 2,074.12
2.2.2 Drain connection LOT 1.00 0.00 24.96 24.96 714.08 714.08 0.00 0.00 0.00 714.08 714.08 714.08 714.08 193.35 193.35 907.43 907.43
2.2.3 Power connection LOT 1.00 0.00 24.96 24.96 810.08 810.08 0.00 0.00 0.00 810.08 810.08 810.08 810.08 219.34 219.34 1,029.42 1,029.42
2.2.4 DDC Control Panel with accessories LOT 1.00 0.00 24.96 24.96 858.08 858.08 0.00 0.00 0.00 858.08 858.08 858.08 858.08 232.34 232.34 1,090.42 1,090.42
AHU-03
2.3 UNIT 1.00
Zamil BWY07 0.00 20.76 20.76 663.98 663.98 416.00 416.00 0.00 1,079.98 1,079.98 1,079.98 1,079.98 292.42 292.42 1,372.40 1,372.40
TC/SC 124000/79755 BTUH
SA/OA 2793/994 CFM. Pre filter 2" & Bag Filter
24"
2.0 HP motor
460/3/60
Built in Heater 15.0 KW, 3 stage
460/3/60
2.3.1 Chilled water piping connection LOT 1.00 0.00 33.16 33.16 1,216.18 1,216.18 416.00 416.00 0.00 1,632.18 1,632.18 1,632.18 1,632.18 441.94 441.94 2,074.12 2,074.12
2.3.2 Drain connection LOT 1.00 0.00 24.96 24.96 714.08 714.08 0.00 0.00 0.00 714.08 714.08 714.08 714.08 193.35 193.35 907.43 907.43
2.3.3 Power connection LOT 1.00 0.00 24.96 24.96 810.08 810.08 0.00 0.00 0.00 810.08 810.08 810.08 810.08 219.34 219.34 1,029.42 1,029.42
2.3.4 DDC Control Panel with accessories LOT 1.00 0.00 24.96 24.96 858.08 858.08 0.00 0.00 0.00 858.08 858.08 858.08 858.08 232.34 232.34 1,090.42 1,090.42
3 EXHAUST FANS
3.1 EF-01, Ceiling mounted EA 186.00 0.00 20.56 3,824.16 625.88 116,413.68 288.00 53,568.00 0.00 913.88 169,981.68 913.88 169,981.68 247.45 46,025.35 1,161.33 216,007.03
50 CFM @ 50 pa, 0.07 HP motor
230/1/60
3.2 EF-02/05, Roof Mounted EA 2.00 0.00 20.56 41.12 625.88 1,251.76 288.00 576.00 0.00 913.88 1,827.76 913.88 1,827.76 247.45 494.90 1,161.33 2,322.66
310 CFM @ 85 pa. 1/12 HP motor
230/1/60
3.3 EF-03/06, Roof Mounted EA 2.00 0.00 20.56 41.12 625.88 1,251.76 288.00 576.00 0.00 913.88 1,827.76 913.88 1,827.76 247.45 494.90 1,161.33 2,322.66
340 CFM @ 75 pa. 1/12 HP motor
230/1/60
3.4 EF-04/07, Roof Mounted EA 2.00 0.00 20.56 41.12 625.88 1,251.76 288.00 576.00 0.00 913.88 1,827.76 913.88 1,827.76 247.45 494.90 1,161.33 2,322.66
450 CFM @ 75 pa. 1/12 HP motor
230/1/60
Cast Steel for 3" & above. PVC for sizes below 3"
1.1 8" Diameter LM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.2 6" Diameter LM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.3 4" to 1" Diameter LM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 3/4" Diameter LM 700.00 25.96 18,170.83 0.34 238.78 9.80 6,862.72 4.00 2,800.00 1.30 908.54 15.10 10,571.26 41.06 28,742.10 11.12 7,782.40 52.18 36,524.49
2 1" Diameter LM 960.00 31.21 29,960.00 0.34 327.47 9.80 9,411.73 4.00 3,840.00 1.56 1,498.00 15.36 14,749.73 46.57 44,709.73 12.61 12,105.90 59.18 56,815.63
3 2" Diameter LM 1390.00 51.33 71,353.33 0.34 474.14 9.80 13,627.41 4.00 5,560.00 2.57 3,567.67 16.37 22,755.07 67.70 94,108.41 18.33 25,481.41 86.04 119,589.81
4 3" Diameter LM 2820.00 67.08 189,175.00 0.34 961.93 9.80 27,646.97 4.00 11,280.00 3.35 9,458.75 17.16 48,385.72 84.24 237,560.72 22.81 64,323.49 107.05 301,884.21
1 High Voltage
15KV, 1/C, 150mm2 XLPE/SWA/PVC,
1.1 COPPER, insulated cable, suitable for direct LM 6450.00
burial. 80.00 516,000.00 1.04 6,675.75 28.12 181,357.88 0.00 0.00 4.00 25,800.00 32.12 207,157.88 112.12 723,157.88 30.36 195,806.94 142.48 918,964.82
600V, 3C, XLPE, SWA/PVC, COPPER,
2
insulated cable - size as follows:
2.1 1/C, 10mm2 PVC GRD LM 960.00 4.59 4,406.40 0.35 331.20 9.37 8,997.60 0.00 0.00 0.23 220.32 9.60 9,217.92 14.19 13,624.32 3.84 3,689.01 18.03 17,313.33
2.2 1/C, 16mm2 PVC GRD LM 650.00 6.63 4,309.50 0.35 224.25 9.37 6,092.13 0.00 0.00 0.33 215.48 9.70 6,307.60 16.33 10,617.10 4.42 2,874.76 20.76 13,491.86
2.3 1/C, 25mm2 PVC GRD LM 360.00 9.50 3,420.00 0.35 124.20 9.37 3,374.10 0.00 0.00 0.48 171.00 9.85 3,545.10 19.35 6,965.10 5.24 1,885.92 24.59 8,851.02
2.4 1/C, 35mm2 PVC GRD LM 900.00 12.75 11,475.00 0.35 310.50 9.37 8,435.25 0.00 0.00 0.64 573.75 10.01 9,009.00 22.76 20,484.00 6.16 5,546.38 28.92 26,030.38
2.5 1/C, 95mm2 PVC GRD LM 6530.00 35.19 229,790.70 0.69 4,505.70 18.75 122,404.85 0.00 0.00 1.76 11,489.54 20.50 133,894.39 55.69 363,685.09 15.08 98,473.75 70.77 462,158.83
2.6 3/C 95mm2 XLPE/PVC LM 160.00 106.40 17,024.00 0.34 54.58 9.80 1,568.62 0.00 0.00 5.32 851.20 15.12 2,419.82 121.52 19,443.82 32.90 5,264.74 154.43 24,708.56
2.7 3/C 150mm2, XLPE/PVC LM 1080.00 157.20 169,776.00 0.41 442.08 11.76 12,705.84 0.00 0.00 7.86 8,488.80 19.62 21,194.64 176.82 190,970.64 47.88 51,708.46 224.70 242,679.10
2.8 3/C 185mm2, XLPE/PVC LM 800.00 234.10 187,280.00 0.51 409.33 14.71 11,764.67 0.00 0.00 11.71 9,364.00 26.41 21,128.67 260.51 208,408.67 70.54 56,430.09 331.05 264,838.76
2.9 3/C 240mm2, XLPE/PVC LM 1200.00 303.90 364,680.00 0.68 818.67 19.61 23,529.33 0.00 0.00 15.20 18,234.00 34.80 41,763.33 338.70 406,443.33 91.71 110,051.25 430.41 516,494.58
2.1 3/C 4mm2, XLPE/PVC LM 68600.00 7.50 514,500.00 0.20 14,040.13 5.88 403,528.07 0.00 0.00 0.38 25,725.00 6.26 429,253.07 13.76 943,753.07 3.73 255,536.74 17.48 1,199,289.80
2.11 3/C 6mm2, XLPE/PVC LM 66500.00 11.50 764,750.00 0.20 13,610.33 5.88 391,175.17 0.00 0.00 0.58 38,237.50 6.46 429,412.67 17.96 1,194,162.67 4.86 323,339.27 22.82 1,517,501.94
2.12 4/C 6mm2, XLPE/PVC LM 320.00 13.25 4,240.00 0.20 65.49 5.88 1,882.35 0.00 0.00 0.66 212.00 6.54 2,094.35 19.79 6,334.35 5.36 1,715.13 25.15 8,049.48
2.13 4/C 10mm2, XLPE/PVC LM 960.00 19.55 18,768.00 0.20 196.48 5.88 5,647.04 0.00 0.00 0.98 938.40 6.86 6,585.44 26.41 25,353.44 7.15 6,864.86 33.56 32,218.30
2.14 4/C 35mm2, XLPE/PVC LM 330.00 50.99 16,826.70 0.29 96.49 8.40 2,773.10 0.00 0.00 2.55 841.34 10.95 3,614.44 61.94 20,441.14 16.77 5,534.78 78.71 25,975.91
2.15 4/C 50mm2, XLPE/PVC LM 700.00 91.35 63,945.00 0.29 204.67 8.40 5,882.33 0.00 0.00 4.57 3,197.25 12.97 9,079.58 104.32 73,024.58 28.25 19,772.61 132.57 92,797.20
2.16 4/C 95mm2, XLPE/PVC LM 200.00 129.80 25,960.00 0.34 68.22 9.80 1,960.78 0.00 0.00 6.49 1,298.00 16.29 3,258.78 146.09 29,218.78 39.56 7,911.47 185.65 37,130.24
2.17 4/C 120mm2, XLPE/PVC LM 180.00 161.70 29,106.00 0.34 61.40 9.80 1,764.70 0.00 0.00 8.09 1,455.30 17.89 3,220.00 179.59 32,326.00 48.63 8,752.80 228.22 41,078.80
2.18 4/C 150mm2, XLPE/PVC LM 560.00 199.89 111,938.40 0.41 229.23 11.76 6,588.21 0.00 0.00 9.99 5,596.92 21.76 12,185.13 221.65 124,123.53 60.02 33,608.50 281.66 157,732.03
2.19 4/C 185mm2, XLPE/PVC LM 80.00 240.00 19,200.00 0.51 40.93 14.71 1,176.47 0.00 0.00 12.00 960.00 26.71 2,136.47 266.71 21,336.47 72.22 5,777.20 338.92 27,113.67
2.2 4/C 240mm2, XLPE/SWA/PVC LM 1700.00 319.30 542,810.00 0.68 1,159.78 19.61 33,333.22 0.00 0.00 15.97 27,140.50 35.57 60,473.72 354.87 603,283.72 96.09 163,349.04 450.96 766,632.76
2.21 12/C 2.5mm2,SWA/PVC LM 380.00 26.57 10,096.60 0.29 111.10 8.40 3,193.27 0.00 0.00 1.33 504.83 9.73 3,698.10 36.30 13,794.70 9.83 3,735.14 46.13 17,529.84
2.5mm2 Shielded Twisted Pair Copper Fire
2.22 LM 25000.00
Rated Cable 20.60 515,000.00 0.20 5,116.67 5.88 147,058.33 0.00 0.00 1.03 25,750.00 6.91 172,808.33 27.51 687,808.33 7.45 186,235.47 34.96 874,043.80
1 EXCAVATION M3 10049.79 0.00 0.37 3,749.13 6.43 64,595.04 16.89 169,764.72 0.25 2,512.45 23.57 236,872.20 23.57 236,872.20 6.38 64,137.06 29.95 301,009.26
2 SANDFILL M3 6029.88 25.00 150,746.88 0.34 2,036.76 5.82 35,120.67 15.93 96,076.01 1.25 7,537.34 23.01 138,734.03 48.01 289,480.91 13.00 78,381.74 61.01 367,862.65
3 GRAVEL FILL M3 14.40 56.00 806.40 0.56 8.06 9.82 141.47 28.52 410.72 2.80 40.32 41.15 592.51 97.15 1,398.91 26.30 378.78 123.45 1,777.69
4 ORDINARY BACKFILL M3 4019.92 18.00 72,358.50 0.62 2,474.48 10.82 43,513.37 36.47 146,592.97 0.25 1,004.98 47.54 191,111.31 65.54 263,469.81 17.75 71,338.81 83.29 334,808.62
5 DISPOSAL M3 6029.88 0.00 0.18 1,103.80 3.15 19,001.64 8.61 51,923.93 0.00 11.76 70,925.57 11.76 70,925.57 3.18 19,204.27 14.95 90,129.84
- INCLUDING FORMWORKS, REINFORCEMENT,
6 TRANSFORMER PAD M3 38.40
CONCRETE COATING 1,251.04 48,039.94 21.86 839.53 492.55 18,913.82 192.45 7,390.21 62.55 2,402.00 747.55 28,706.02 1,998.59 76,745.96 541.15 20,780.24 2,539.74 97,526.19
7 TRANSFORMER PAD FENCE LM 72.00 787.60 56,707.20 4.70 338.04 119.05 8,571.42 16.00 1,152.00 39.38 2,835.36 174.43 12,558.78 962.03 69,265.98 260.48 18,754.91 1,222.51 88,020.89
8 TRANSFORMER PAD GATE EA 8.00 6,950.00 55,600.00 22.86 182.88 545.03 4,360.24 64.00 512.00 347.50 2,780.00 956.53 7,652.24 7,906.53 63,252.24 2,140.82 17,126.59 10,047.35 80,378.83
9 BOLLARD POST EA 32.00 560.00 17,920.00 4.70 150.24 119.05 3,809.52 16.00 512.00 28.00 896.00 163.05 5,217.52 723.05 23,137.52 195.78 6,264.87 918.82 29,402.39
- INCLUDING FORMWORKS, REINFORCEMENT,
10 DUCT BANK M3 157.50
CONCRETE COATING 1,233.44 194,266.41 24.95 3,929.42 545.29 85,882.39 161.91 25,501.35 61.67 9,713.32 768.87 121,097.06 2,002.31 315,363.46 542.16 85,389.87 2,544.47 400,753.33
11 WARNING TAPE LM 2512.45 6.50 16,330.91 0.09 213.56 1.43 3,603.27 0.00 0.00 0.33 816.55 1.76 4,419.81 8.26 20,750.73 2.24 5,618.60 10.50 26,369.33
12 CONCRETE M3 2.59 380.00 984.96 5.54 14.36 124.50 322.71 26.97 69.90 19.00 49.25 170.47 441.86 550.47 1,426.82 149.05 386.33 699.52 1,813.15
13 FORMWORKS M2 34.56 72.00 2,488.32 2.09 72.12 45.61 1,576.28 5.67 195.84 3.60 124.42 54.88 1,896.54 126.88 4,384.86 34.35 1,187.27 161.23 5,572.13
14 REINFORCEMENT KG 7464.96 4.20 31,352.83 0.07 527.03 1.61 11,992.46 0.74 5,491.72 0.29 2,194.70 2.64 19,678.88 6.84 51,031.71 1.85 13,817.68 8.69 64,849.39
15 CONCRETE COATING M2 34.56 9.90 342.14 0.17 5.96 3.69 127.40 0.00 0.00 0.50 17.11 4.18 144.50 14.08 486.65 3.81 131.77 17.89 618.42
2 Floor Drain
2.1 3” Schedule 40 EA 72.00 350.00 25,200.00 3.12 224.64 71.26 5,130.72 0.00 0.00 17.50 1,260.00 88.76 6,390.72 438.76 31,590.72 118.80 8,553.71 557.56 40,144.43
3 Floor Cleanouts
3.1 4” Schedule 40 EA 288.00 350.00 100,800.00 2.07 596.16 44.24 12,739.68 0.00 0.00 17.50 5,040.00 61.74 17,779.68 411.74 118,579.68 111.48 32,107.41 523.22 150,687.09
5 Roof Drain
5.1 3” Schedule 40 EA 60.00 850.00 51,000.00 4.17 250.20 98.29 5,897.10 0.00 0.00 42.50 2,550.00 140.79 8,447.10 990.79 59,447.10 268.27 16,096.28 1,259.06 75,543.38
1 200 mm dia PVC Pipe Sched. 40 LM 1371.00 104.75 143,612.25 2.16 2,965.93 62.38 85,525.27 28.33 38,845.00 5.24 7,180.61 95.95 131,550.88 200.70 275,163.13 54.34 74,504.96 255.05 349,668.09
2 FRP MANHOLE EA 28.00 7,250.00 203,000.00 21.88 612.64 631.74 17,688.72 340.00 9,520.00 362.50 10,150.00 1,334.24 37,358.72 8,584.24 240,358.72 2,324.32 65,081.10 10,908.56 305,439.82
3 EXCAVATION M3 5484.00 0.00 0.37 2,045.84 6.43 35,248.41 16.89 92,637.71 0.25 1,371.00 23.57 129,257.12 23.57 129,257.12 6.38 34,998.50 29.95 164,255.62
4 SANDFILL M3 3290.40 25.00 82,260.00 0.34 1,111.42 5.82 19,164.75 15.93 52,427.04 1.25 4,113.00 23.01 75,704.79 48.01 157,964.79 13.00 42,771.58 61.01 200,736.37
5 ORDINARY BACKFILL M3 2193.60 18.00 39,484.80 0.62 1,350.28 10.82 23,744.50 36.47 79,993.28 0.25 548.40 47.54 104,286.18 65.54 143,770.98 17.75 38,928.37 83.29 182,699.35
6 DISPOSAL M3 3290.40 0.00 0.18 602.33 3.15 10,368.87 8.61 28,334.00 0.00 11.76 38,702.87 11.76 38,702.87 3.18 10,479.44 14.95 49,182.32
7 CONCRETE M3 12.10 380.00 4,596.48 5.54 67.01 124.50 1,505.99 26.97 326.19 19.00 229.82 170.47 2,062.01 550.47 6,658.49 149.05 1,802.89 699.52 8,461.38
8 LEAN CONCRETE M3 3.02 295.00 892.08 3.46 10.46 77.00 232.84 26.97 81.55 14.75 44.60 118.71 358.99 413.71 1,251.07 112.02 338.75 525.73 1,589.82
9 REINFORCEMENT KG 1088.64 4.20 4,572.29 0.07 76.86 1.61 1,748.90 0.74 800.88 0.29 320.06 2.64 2,869.84 6.84 7,442.12 1.85 2,015.08 8.69 9,457.20
10 FORMWORKS M2 40.32 72.00 2,903.04 2.09 84.13 45.61 1,839.00 5.67 228.48 3.60 145.15 54.88 2,212.63 126.88 5,115.67 34.35 1,385.15 161.23 6,500.82
11 CATCH BASINS - GRATING SIZE IS 2.0 x 0.3 M EA 48.00 6,776.74 325,283.33 24.96 1,198.08 618.08 29,667.84 104.00 4,992.00 338.84 16,264.17 1,060.92 50,924.01 7,837.65 376,207.33 2,122.17 101,864.35 9,959.83 478,071.69
12 WARNING TAPE LM 1371.00 6.50 8,911.50 0.09 116.54 1.43 1,966.24 0.00 0.00 0.33 445.58 1.76 2,411.82 8.26 11,323.32 2.24 3,065.98 10.50 14,389.29
V. MISCELLANEOUS WORKS
1 JUNCTION BOX EA 1520.00 3.20 4,864.00 0.26 388.87 7.35 11,176.43 3.00 4,560.00 0.16 243.20 10.51 15,979.63 13.71 20,843.63 3.71 5,643.76 17.43 26,487.39
2 UTILITY BOX EA 64.00 3.20 204.80 0.26 16.37 7.35 470.59 3.00 192.00 0.16 10.24 10.51 672.83 13.71 877.63 3.71 237.63 17.43 1,115.26
3 PULL BOX EA 24.00 25.60 614.40 0.26 6.14 7.35 176.47 3.00 72.00 1.28 30.72 11.63 279.19 37.23 893.59 10.08 241.95 47.31 1,135.54
- TYPE 509-G
4 FIRE HYDRANTS SET 12.00
'- INCLUDING GATE VALVES 15,700.00 188,400.00 26.02 312.24 672.21 8,066.52 295.00 3,540.00 785.00 9,420.00 1,752.21 21,026.52 17,452.21 209,426.52 4,725.47 56,705.69 22,177.68 266,132.21
- TYPE 509-E
5 FIRE HYDRANTS SET 2.00
'- INCLUDING GATE VALVES 17,200.00 34,400.00 26.02 52.04 672.21 1,344.42 295.00 590.00 860.00 1,720.00 1,827.21 3,654.42 19,027.21 38,054.42 5,151.93 10,303.86 24,179.14 48,358.28
6 BOLLARDS EA 72.00 560.00 40,320.00 4.70 338.04 119.05 8,571.42 16.00 1,152.00 28.00 2,016.00 163.05 11,739.42 723.05 52,059.42 195.78 14,095.95 918.82 66,155.37
7 AIR RELEASE VALVE & CHAMBER SET 2.00 10,776.74 21,553.47 39.56 79.12 1,107.38 2,214.76 604.00 1,208.00 538.84 1,077.67 2,250.22 4,500.43 13,026.95 26,053.91 3,527.26 7,054.53 16,554.22 33,108.43
8 WASHOUT VALVE & CHAMBER SET 2.00 7,976.74 15,953.47 39.56 79.12 1,107.38 2,214.76 604.00 1,208.00 398.84 797.67 2,110.22 4,220.43 10,086.95 20,173.91 2,731.21 5,462.42 12,818.16 25,636.32
9 150 MM DIA FRP PIPE - INCLUDING FITTINGS LM 1026.00 171.53 175,986.78 0.00 0.00 0.00 0.00 0.00 0.00 8.58 8,799.34 8.58 8,799.34 180.10 184,786.12 48.77 50,033.90 228.87 234,820.01
1 EXCAVATION M3 825.00 0.00 0.37 307.77 6.43 5,302.69 16.89 13,936.20 0.25 206.25 23.57 19,445.14 23.57 19,445.14 6.38 5,265.09 29.95 24,710.23
2 SANDFILL M3 495.00 25.00 12,375.00 0.34 167.20 5.82 2,883.10 15.93 7,887.00 1.25 618.75 23.01 11,388.85 48.01 23,763.85 13.00 6,434.46 61.01 30,198.31
3 ORDINARY BACK FILL M3 330.00 6.00 1,980.00 0.62 203.13 10.82 3,572.07 36.47 12,034.00 0.25 82.50 47.54 15,688.57 53.54 17,668.57 14.50 4,784.06 68.04 22,452.62
4 DISPOSAL M3 495.00 0.00 0.18 90.61 3.15 1,559.87 8.61 4,262.50 0.00 11.76 5,822.37 11.76 5,822.37 3.18 1,576.50 14.95 7,398.87
5 WARNING TAPE LM 275.00 6.50 1,787.50 0.09 23.38 1.43 394.40 0.00 0.00 0.33 89.38 1.76 483.77 8.26 2,271.27 2.24 614.98 10.50 2,886.25
- INCLUDING FORMWORKS, REINFORCEMENT,
6 DUCT BANK M3 8.10
CONCRETE COATING 1,233.44 9,990.84 24.95 202.08 545.29 4,416.81 161.91 1,311.50 61.67 499.54 768.87 6,227.85 2,002.31 16,218.69 542.16 4,391.48 2,544.47 20,610.17
SUPPLY & INSTALL OF NEW CHILLER
7 LOT 1.00
INCLUDING: 1,486,194.80 1,486,194.80 495.95 495.95 18,535.44 18,535.44 10,608.00 10,608.00 14,861.95 14,861.95 44,005.39 44,005.39 1,530,200.19 1,530,200.19 414,326.99 414,326.99 1,944,527.17 1,944,527.17
- 5 SETS OF PRESSURE INDICATOR
- 2 SETS OF TEMPERATURE INDICATOR
1 EXCAVATION M3 234.69 0.00 0.37 87.55 6.43 1,508.50 16.89 3,964.53 0.25 58.67 23.57 5,531.70 23.57 5,531.70 6.38 1,497.80 29.95 7,029.50
2 COMPACTED SUBGRADE M3 33.53 0.00 0.62 20.64 10.82 362.92 36.47 1,222.64 0.00 47.29 1,585.56 47.29 1,585.56 12.80 429.32 60.10 2,014.88
3 SELECT FILL M3 292.97 6.00 1,757.85 0.62 180.34 10.82 3,171.29 36.47 10,683.82 0.25 73.24 47.54 13,928.35 53.54 15,686.20 14.50 4,247.30 68.04 19,933.50
4 SAND FILL (CLEAN SWEET SAND) M3 32.66 32.00 1,045.20 0.34 11.03 5.82 190.24 15.93 520.42 1.60 52.26 23.36 762.92 55.36 1,808.12 14.99 489.58 70.35 2,297.70
5 GRAVEL FILL M3 6.54 56.00 366.02 0.56 3.66 9.82 64.21 28.52 186.42 2.80 18.30 41.15 268.94 97.15 634.96 26.30 171.93 123.45 806.89
POLYETHYLENE SHEET VAPOR BARRIER
6 M2 100.28
1000 MICRON THK. 36.00 3,610.07 0.17 17.38 3.96 397.00 0.00 0.00 1.80 180.50 5.76 577.50 41.76 4,187.57 11.31 1,133.85 53.07 5,321.42
0.15 MM THK POLYETHYLENE FILM VAPOR
7 M2 62.43
BARRIER 2.20 137.35 0.17 10.82 3.96 247.15 0.00 0.00 0.11 6.87 4.07 254.02 6.27 391.37 1.70 105.97 7.97 497.33
8 LEAN CONCRETE M3 3.43 295.00 1,010.91 3.46 11.86 77.00 263.85 26.97 92.41 14.75 50.55 118.71 406.81 413.71 1,417.72 112.02 383.87 525.73 1,801.59
9 CONCRETE M3 25.52 380.00 9,696.86 5.54 141.37 124.50 3,177.08 26.97 688.14 19.00 484.84 170.47 4,350.06 550.47 14,046.93 149.05 3,803.44 699.52 17,850.37
10 SAND CEMENT M3 11.53 180.00 2,076.13 3.46 39.91 77.00 888.08 4.00 46.14 9.00 103.81 90.00 1,038.03 270.00 3,114.16 73.11 843.21 343.10 3,957.37
11 REINFORCEMENT KG 3158.31 4.20 13,264.90 0.07 222.98 1.61 5,073.82 0.74 2,323.46 0.29 928.54 2.64 8,325.83 6.84 21,590.73 1.85 5,846.05 8.69 27,436.78
12 150 x 150 MW 50 x MW 50 WWF M2 55.98 34.67 1,940.75 0.35 19.31 8.58 480.38 3.63 202.94 2.43 135.85 14.63 819.17 49.30 2,759.93 13.35 747.30 62.65 3,507.22
13 FORMWORKS M2 126.25 65.00 8,206.38 2.09 263.45 45.61 5,758.35 5.67 715.43 3.25 410.32 54.53 6,884.10 119.53 15,090.48 32.36 4,086.00 151.89 19,176.48
14 BITUMINOUS COATING M2 114.91 9.90 1,137.63 0.17 19.82 3.69 423.59 0.00 0.00 0.50 56.88 4.18 480.48 14.08 1,618.10 3.81 438.13 17.89 2,056.23
15 ASPHALT IMPREGNATED BOARD M2 51.84 65.00 3,369.60 0.69 35.77 14.75 764.38 0.00 0.00 3.25 168.48 18.00 932.86 83.00 4,302.46 22.47 1,164.96 105.47 5,467.42
16 MISCELLANEOUS STEEL KG 39.04 8.50 331.84 0.28 10.84 7.00 273.36 2.70 105.41 0.43 16.59 10.13 395.36 18.63 727.20 5.04 196.90 23.67 924.11
WELDED STEEL GRATING TYPE W19-3/4" x
17 M2 2.70
1/8" 540.00 1,458.00 1.06 2.86 27.61 74.54 20.11 54.30 27.00 72.90 74.72 201.74 614.72 1,659.74 166.44 449.40 781.16 2,109.14
18 6" DIA. PVC PIPE SLEEVE LM 1.92 51.63 99.12 1.04 1.99 22.12 42.47 0.00 0.00 2.58 4.96 24.70 47.42 76.32 146.54 20.67 39.68 96.99 186.22
19 4" DIA PVC PIPE LM 3.84 27.69 106.34 1.04 3.97 22.12 84.93 0.00 0.00 1.38 5.32 23.50 90.25 51.19 196.58 13.86 53.23 65.06 249.81
20 NON-SHRINK GROUT M3 0.04 2,600.00 97.84 15.60 0.59 356.30 13.41 0.00 0.00 130.00 4.89 486.30 18.30 3,086.30 116.14 835.67 31.45 3,921.97 147.59
21 GUARD POST EA 12.00 560.00 6,720.00 4.70 56.34 119.05 1,428.57 16.00 192.00 28.00 336.00 163.05 1,956.57 723.05 8,676.57 195.78 2,349.32 918.82 11,025.89
SUPPLY & INSTALLATION OF NEW
STORAGE TANK
- CAPACITY = 71327 US GAL.
22 LOT 1.00
- INSIDE DIA. = 8000 MM
- HEIGHT = 6374 MM
INCLUDING: 594,908.50 594,908.50 1,134.27 1,134.27 38,449.80 38,449.80 12,480.00 12,480.00 5,949.09 5,949.09 56,878.89 56,878.89 651,787.39 651,787.39 176,482.20 176,482.20 828,269.59 828,269.59
- 2 SETS OF 150 MM DIA CHECK VALVE
- 1 SET OF 100 MM DIA GLOBE VALVE
- 1 SET OF 150 MM DIA STRAINER
- 1 SET OF 300 MM DIA STRAINER
- 3 SETS OF 100 MM DIA GATE VALVES
- 1 SET 75 MM DIA BALL VALVE
2 PIPE WORKS
REMOVAL OF EXISTING CHILLED WATER
2.1
PIPE
- RETURN PIPE 400 MM DIA CARBON STEEL
LM 230.00
PIPE INSULATED 0.00 11.93 2,743.90 425.77 97,925.95 202.00 46,460.00 25.00 5,750.00 652.77 150,135.95 652.77 150,135.95 176.75 40,651.79 829.51 190,787.74
- SUPPLY PIPE 400 MM DIA CARBON STEEL
LM 230.00
PIPE INSULATED 0.00 11.93 2,743.90 425.77 97,925.95 202.00 46,460.00 25.00 5,750.00 652.77 150,135.95 652.77 150,135.95 176.75 40,651.79 829.51 190,787.74
RELOCATION OF EXISTING CHILLED WATER
2.2
VALVE BOX
SUPPLY & INSTALLATION OF CHILLED
2.3
WATER PIPE
- RETURN PIPE 400 MM DIA CARBON STEEL - INCLUDING FITTINGS AND OTHER
LM 445.00
PIPE INSULATED (CEMENT LINED) APPURTENANCES 1,663.79 740,387.44 14.03 6,243.35 543.82 241,997.68 202.00 89,890.00 83.19 37,019.37 829.00 368,907.05 2,492.80 1,109,294.49 674.97 300,359.81 3,167.76 1,409,654.30
- SUPPLY PIPE 400 MM DIA CARBON STEEL - INCLUDING FITTINGS AND OTHER
LM 445.00
PIPE INSULATED (CEMENT LINED) APPURTENANCES 1,663.79 740,387.44 14.03 6,243.35 543.82 241,997.68 202.00 89,890.00 83.19 37,019.37 829.00 368,907.05 2,492.80 1,109,294.49 674.97 300,359.81 3,167.76 1,409,654.30
3 PAVING WORKS
3.1 ASPHALT BREAKING M2 30.00 0.00 0.26 7.74 4.47 133.97 11.68 350.25 0.00 16.14 484.22 16.14 484.22 4.37 131.11 20.51 615.33
3.2 DEMILITION OF CURBSTONE LM 9.00 0.00 0.25 2.28 7.06 63.50 15.33 138.00 0.00 22.39 201.50 22.39 201.50 6.06 54.56 28.45 256.06
3.3 DEMOLITION OF SIDE WALK PAVING M2 17.00 0.00 0.26 4.39 4.47 75.91 11.68 198.48 0.00 16.14 274.39 16.14 274.39 4.37 74.30 20.51 348.69
- INCLUDING SUBGRADE PREPARATION, SUB BASE,
3.4 ASPHALT PAVING BASE CORSE, WEARING COURSE, BINDER COURSE, M2 30.00
TACK COAT & PRIME COAT 92.50 2,775.00 3.72 111.67 85.01 2,550.33 111.46 3,343.69 4.63 138.75 201.09 6,032.76 293.59 8,807.76 79.49 2,384.85 373.09 11,192.61
3.5 SUPPLY & INSTALLATION OF CURBSTONE LM 9.00
65.00 585.00 0.92 8.28 19.66 176.94 0.00 0.00 3.25 29.25 22.91 206.19 87.91 791.19 23.80 214.23 111.71 1,005.42
SUPPLY & INSTALLATION OF PAVING
3.6 M2 17.00
BLOCKS 77.00 1,309.00 1.38 23.46 29.49 501.33 0.00 0.00 3.85 65.45 33.34 566.78 110.34 1,875.78 29.88 507.90 140.22 2,383.68
1 EARTH WORKS
1.1 EXCAVATION M3 996.00 0.00 0.37 371.56 6.43 6,401.79 16.89 16,824.79 0.25 249.00 23.57 23,475.58 23.57 23,475.58 6.38 6,356.40 29.95 29,831.98
1.2 SAND FILL M3 597.60 25.00 14,940.00 0.34 201.86 5.82 3,480.69 15.93 9,521.76 1.25 747.00 23.01 13,749.45 48.01 28,689.45 13.00 7,768.14 61.01 36,457.59
1.3 ORDINARY BACKFILL M3 398.40 6.00 2,390.40 0.62 245.24 10.82 4,312.46 36.47 14,528.32 0.25 99.60 47.54 18,940.38 53.54 21,330.78 14.50 5,775.66 68.04 27,106.44
1.4 DISPOSAL M3 597.60 0.00 0.18 109.39 3.15 1,883.19 8.61 5,146.00 0.00 11.76 7,029.19 11.76 7,029.19 3.18 1,903.27 14.95 8,932.46
1.5 WARNING TAPE LM 235.00 6.50 1,527.50 0.09 19.98 1.43 337.03 0.00 0.00 0.33 76.38 1.76 413.40 8.26 1,940.90 2.24 525.53 10.50 2,466.44
2 PIPE WORKS
REMOVAL OF EXISTING 200 MM DIA PVC
2.1 LM 180.00
CLASS 12 SEWER LINE 0.00 2.51 452.40 71.39 12,850.20 28.33 5,100.00 25.00 4,500.00 124.72 22,450.20 124.72 22,450.20 33.77 6,078.76 158.49 28,528.96
REMOVAL OF EXISTING FIBER GLASS
2.2 NOS 3.00
SEWER MANHOLE 0.00 30.16 90.48 856.68 2,570.04 340.00 1,020.00 75.00 225.00 1,271.68 3,815.04 1,271.68 3,815.04 344.33 1,032.99 1,616.01 4,848.03
SUPPLY & INSTALLATION OF 200 MM DIA - INCLUDING FITTINGS AND OTHER
2.3 LM 235.00
PVC SCHED. 40 SEWER LINE APPURTENANCES 77.56 18,227.19 2.51 590.63 71.39 16,776.65 28.33 6,658.33 3.88 911.36 103.60 24,346.34 181.16 42,573.53 49.05 11,527.49 230.22 54,101.02
SUPPLY & INSTALLATION OF FIBER GLASS - INCLUDING MANHOLE COVER AND OTHER
2.4 NOS 3.00
SEWER MANHOLE FITTINGS 17,086.40 51,259.20 30.16 90.48 856.68 2,570.04 340.00 1,020.00 854.32 2,562.96 2,051.00 6,153.00 19,137.40 57,412.20 5,181.77 15,545.30 24,319.17 72,957.50
3 PAVING WORKS
3.1 ASPHALT BREAKING M2 126.00 0.00 0.26 32.53 4.47 562.66 11.68 1,471.05 0.00 16.14 2,033.71 16.14 2,033.71 4.37 550.66 20.51 2,584.37
3.2 DEMILITION OF CURBSTONE LM 10.00 0.00 0.25 2.53 7.06 70.56 15.33 153.33 0.00 22.39 223.89 22.39 223.89 6.06 60.62 28.45 284.51
3.3 DEMOLITION OF SIDE WALK PAVING M2 12.00 0.00 0.26 3.10 4.47 53.59 11.68 140.10 0.00 16.14 193.69 16.14 193.69 4.37 52.44 20.51 246.13
- INCLUDING SUBGRADE PREPARATION, SUB BASE,
3.4 ASPHALT PAVING BASE CORSE, WEARING COURSE, BINDER COURSE, M2 126.00
TACK COAT & PRIME COAT 92.50 11,655.00 3.72 469.02 85.01 10,711.37 111.46 14,043.49 4.63 582.75 201.09 25,337.60 293.59 36,992.60 79.49 10,016.36 373.09 47,008.96
3.5 SUPPLY & INSTALLATION OF CURBSTONE LM 10.00
65.00 650.00 0.92 9.20 19.66 196.60 0.00 0.00 3.25 32.50 22.91 229.10 87.91 879.10 23.80 238.03 111.71 1,117.13
SUPPLY & INSTALLATION OF PAVING
3.6 M2 12.00
BLOCKS 77.00 924.00 1.38 16.56 29.49 353.88 0.00 0.00 3.85 46.20 33.34 400.08 110.34 1,324.08 29.88 358.52 140.22 1,682.60
1 EARTH WORKS
1.1 EXCAVATION M3 590.40 0.00 0.37 220.25 6.43 3,794.80 16.89 9,973.25 0.25 147.60 23.57 13,915.65 23.57 13,915.65 6.38 3,767.89 29.95 17,683.54
1.2 SAND FILL M3 336.00 25.00 8,400.00 0.34 113.49 5.82 1,957.01 15.93 5,353.60 1.25 420.00 23.01 7,730.61 48.01 16,130.61 13.00 4,367.63 61.01 20,498.24
1.3 ORDINARY BACKFILL M3 254.40 6.00 1,526.40 0.62 156.60 10.82 2,753.74 36.47 9,277.12 0.25 63.60 47.54 12,094.46 53.54 13,620.86 14.50 3,688.07 68.04 17,308.93
1.4 DISPOSAL M3 336.00 0.00 0.18 61.51 3.15 1,058.82 8.61 2,893.33 0.00 11.76 3,952.15 11.76 3,952.15 3.18 1,070.11 14.95 5,022.26
1.6 WARNING TAPE LM 350.00 6.50 2,275.00 0.09 29.75 1.43 501.96 0.00 0.00 0.33 113.75 1.76 615.71 8.26 2,890.71 2.24 782.71 10.50 3,673.42
2 PIPE WORKS
REMOVAL OF EXISTING 25MM DIA PVC
2.1 LM 142.00
POTABLE WATER LINE 0.00 0.46 65.32 9.83 1,395.86 0.00 0.00 0.00 9.83 1,395.86 9.83 1,395.86 2.66 377.95 12.49 1,773.81
SUPPLY AND INSTALLATION OF 25 MM DIA
2.2 LM 350.00
CPVC SCHD. 80 POTABLE WATER LINE
20.89 7,310.63 0.46 161.00 9.83 3,440.50 0.00 0.00 1.04 365.53 10.87 3,806.03 31.76 11,116.66 8.60 3,010.02 40.36 14,126.67
3 PAVING WORKS
3.1 ASPHALT BREAKING M2 28.00 0.00 0.26 7.23 4.47 125.04 11.68 326.90 0.00 16.14 451.94 16.14 451.94 4.37 122.37 20.51 574.31
3.2 DEMILITION OF CURBSTONE LM 12.00 0.00 0.25 3.04 7.06 84.67 15.33 184.00 0.00 22.39 268.67 22.39 268.67 6.06 72.75 28.45 341.42
3.3 DEMOLITION OF SIDE WALK PAVING M2 16.00 0.00 0.26 4.13 4.47 71.45 11.68 186.80 0.00 16.14 258.25 16.14 258.25 4.37 69.93 20.51 328.17
- INCLUDING SUBGRADE PREPARATION, SUB BASE,
3.4 ASPHALT PAVING BASE CORSE, WEARING COURSE, BINDER COURSE, M2 28.00
TACK COAT & PRIME COAT 92.50 2,590.00 3.72 104.23 85.01 2,380.30 111.46 3,120.78 4.63 129.50 201.09 5,630.58 293.59 8,220.58 79.49 2,225.86 373.09 10,446.44
3.5 SUPPLY & INSTALLATION OF CURBSTONE LM 12.00
65.00 780.00 0.92 11.04 19.66 235.92 0.00 0.00 3.25 39.00 22.91 274.92 87.91 1,054.92 23.80 285.64 111.71 1,340.56
SUPPLY & INSTALLATION OF PAVING
3.6 M2 16.00
BLOCKS 77.00 1,232.00 1.38 22.08 29.49 471.84 0.00 0.00 3.85 61.60 33.34 533.44 110.34 1,765.44 29.88 478.02 140.22 2,243.46
1 EXCAVATION M3 1443.25 0.00 0.37 538.41 6.43 9,276.49 16.89 24,379.90 0.25 360.81 23.57 34,017.21 23.57 34,017.21 6.38 9,210.72 29.95 43,227.93
DEMOLITION OF EXISTING PARKING SHED,
2 INCLUDING BEAMS, COLUMNS, PARAPETS, M2 636.00
ALUMINUM TRELLIS 0.00 5.10 3,246.43 119.18 75,798.48 125.69 79,941.67 0.00 244.87 155,740.15 244.87 155,740.15 66.30 42,169.22 311.18 197,909.36
3 DEMOLITION OF EXISTING PAVING TILES M2 204.00 0.00 0.26 52.66 4.47 910.98 11.68 2,381.70 0.00 16.14 3,292.68 16.14 3,292.68 4.37 891.55 20.51 4,184.22
4 DEMOLITION OF EXISTING CURBSTONE LM 136.00 0.00 0.25 34.45 7.06 959.59 15.33 2,085.33 0.00 22.39 3,044.93 22.39 3,044.93 6.06 824.46 28.45 3,869.39
5 ASPHALT BREAKING M2 636.00 0.00 0.26 164.18 4.47 2,840.11 11.68 7,425.30 0.00 16.14 10,265.41 16.14 10,265.41 4.37 2,779.53 20.51 13,044.93
SUPPLY AND INSTALLATION OF PAVING
6 M2 1828.22
BLOCKS 77.00 140,772.83 1.38 2,522.94 29.49 53,914.17 0.00 0.00 3.85 7,038.64 33.34 60,952.81 110.34 201,725.64 29.88 54,620.55 140.22 256,346.19
SUPPLY AND INSTALLATION OF
7 LM 979.26
CURBSTONE 65.00 63,651.97 0.92 900.92 19.66 19,252.27 0.00 0.00 3.25 3,182.60 22.91 22,434.87 87.91 86,086.83 23.80 23,309.43 111.71 109,396.27
- INCLUDING SUBGRADE PREPARATION, SUB BASE,
8 ASPHALT PAVING WORKS BASE CORSE, WEARING COURSE, BINDER COURSE, M2 2752.07
TACK COAT & PRIME COAT 92.50 254,566.71 3.72 10,244.21 85.01 233,955.98 111.46 306,735.69 4.63 12,728.34 201.09 553,420.01 293.59 807,986.73 79.49 218,775.76 373.09 1,026,762.48
9 PRECAST WORKS
- T-SHAPES PRECAST COLUMN & HEAD
NOS 16.00
BEAM, CAST IN 2 PCS. 31,770.00 508,320.00 96.44 1,543.04 2,817.62 45,081.92 5,552.00 88,832.00 1,588.50 25,416.00 9,958.12 159,329.92 41,728.12 667,649.92 11,298.58 180,777.25 53,026.70 848,427.17
- 300 x 320 x 6000 MM LONG INTERMEDIATE
LM 168.00
BEAMS 409.00 68,712.00 0.94 157.99 28.58 4,801.90 59.68 10,026.33 20.45 3,435.60 108.71 18,263.83 517.71 86,975.83 140.18 23,550.14 657.89 110,525.97
- 200/300 x 1000 MM DEEP PRECAST
LM 257.00
CONCRETE SPANDREL BEAMS/PARAPET 1,040.00 267,280.00 0.94 241.69 28.58 7,345.76 59.68 15,337.90 52.00 13,364.00 140.26 36,047.66 1,180.26 303,327.66 319.58 82,130.98 1,499.84 385,458.63
10 ALUMINUM TRELLIS M2 888.00 375.00 333,000.00 1.60 1,418.83 43.11 38,281.68 15.11 13,418.67 18.75 16,650.00 76.97 68,350.35 451.97 401,350.35 122.38 108,672.24 574.35 510,022.58
WHITE CEMENT FINE AGGREGATES FINISH
11 M2 1103.68
SAND BLASTED 212.00 233,980.16 2.07 2,284.62 44.24 48,821.28 8.67 9,565.23 10.60 11,699.01 63.50 70,085.52 275.50 304,065.68 74.60 82,330.81 350.10 386,396.49
12 WHEEL STOPPER EA 40.00 350.00 14,000.00 1.56 62.40 35.63 1,425.20 0.00 0.00 17.50 700.00 53.13 2,125.20 403.13 16,125.20 109.15 4,366.16 512.28 20,491.36
GUARD HOUSE
1 PORTABLE PRE-FABRICATED BUILDING - WITH 1 HR FIRE RATED EXTERNAL WALL M2 9.61 1,500.00 14,415.00 8.61 82.77 204.44 1,964.67 113.33 1,089.13 75.00 720.75 392.77 3,774.55 1,892.77 18,189.55 512.50 4,925.12 2,405.27 23,114.67
2 CONCRETE M3 2.33 380.00 883.50 5.54 12.88 124.50 289.47 26.97 62.70 19.00 44.18 170.47 396.34 550.47 1,279.84 149.05 346.54 699.52 1,626.38
3 REINFORCEMENT KG 279.00 4.20 1,171.80 0.07 19.70 1.61 448.21 0.74 205.25 0.29 82.03 2.64 735.49 6.84 1,907.29 1.85 516.43 8.69 2,423.72
4 FORMWORKS M2 6.47 65.00 420.47 2.09 13.50 45.61 295.04 5.67 36.66 3.25 21.02 54.53 352.72 119.53 773.19 32.36 209.35 151.89 982.54
5 CONCRETE COATING M2 4.05 9.90 40.10 0.17 0.70 3.69 14.93 0.00 0.00 0.50 2.00 4.18 16.93 14.08 57.03 3.81 15.44 17.89 72.47
6 CONCRETE SPLASH BLOCK EA 2.00 650.00 1,300.00 6.24 12.48 142.52 285.04 0.00 0.00 32.50 65.00 175.02 350.04 825.02 1,650.04 223.39 446.78 1,048.41 2,096.82
7 WINDOWS
- 2.7 x 1.15 ALUMINUM FIXED GLASS PANEL
- POWDER COATED EA 3.00
WITH TINTED TEMPERED GLASS 30,739.50 92,218.50 6.47 19.41 163.30 489.90 63.85 191.54 1,536.98 4,610.93 1,764.12 5,292.36 32,503.62 97,510.86 8,800.89 26,402.68 41,304.51 123,913.54
- 1.6 x 1.15 ALUMINUM FIXED GLASS PANEL
EA 1.00
WITH TINTED TEMPERED GLASS 18,216.00 18,216.00 3.85 3.85 98.17 98.17 43.61 43.61 910.80 910.80 1,052.58 1,052.58 19,268.58 19,268.58 5,217.29 5,217.29 24,485.86 24,485.86
0.914 x 2.15 FLUSH TYPE PVC DOOR WITH
8 EA 1.00
LOUVER VENTILATION, SINGLE LEAF SWING
3,640.00 3,640.00 4.07 4.07 104.78 104.78 52.21 52.21 182.00 182.00 338.99 338.99 3,978.99 3,978.99 1,077.38 1,077.38 5,056.37 5,056.37
9 GUARD RAIL LM 5.60 360.00 2,016.00 1.73 9.69 43.33 242.66 10.67 59.73 18.00 100.80 72.00 403.19 432.00 2,419.19 116.97 655.04 548.97 3,074.23
10 DOWNSPOUT LM 5.40 110.00 594.00 0.69 3.73 14.75 79.62 0.00 0.00 5.50 29.70 20.25 109.32 130.25 703.32 35.27 190.44 165.51 893.76
11 18 MM THK COUNTER TOP - CORIAN APPROVED M2 4.50 650.00 2,925.00 6.24 28.08 142.52 641.34 0.00 0.00 32.50 146.25 175.02 787.59 825.02 3,712.59 223.39 1,005.25 1,048.41 4,717.84
12 CABINET EA 1.00 1,850.00 1,850.00 4.14 4.14 88.47 88.47 0.00 0.00 0.00 88.47 88.47 1,938.47 1,938.47 524.87 524.87 2,463.34 2,463.34
13 CHAIR EA 2.00 950.00 1,900.00 0.26 0.51 4.30 8.61 0.00 0.00 0.00 4.30 8.61 954.30 1,908.61 258.39 516.79 1,212.70 2,425.39
14 HOT WATER BOILER EA 1.00 650.00 650.00 0.26 0.26 4.30 4.30 0.00 0.00 0.00 4.30 4.30 654.30 654.30 177.16 177.16 831.47 831.47
15 DRINKING WATER COOLER EA 1.00 620.00 620.00 0.26 0.26 4.30 4.30 0.00 0.00 0.00 4.30 4.30 624.30 624.30 169.04 169.04 793.34 793.34
GUARD'S TOILET
1 PORTABLE PRE-FABRICATED BUILDING - WITH 1 HR FIRE RATED EXTERNAL WALL M2 4.16 1,500.00 6,240.00 8.61 35.83 204.44 850.47 113.33 471.47 75.00 312.00 392.77 1,633.94 1,892.77 7,873.94 512.50 2,132.00 2,405.27 10,005.94
2 CONCRETE M3 2.17 380.00 824.22 5.54 12.02 124.50 270.05 26.97 58.49 19.00 41.21 170.47 369.75 550.47 1,193.97 149.05 323.29 699.52 1,517.26
3 REINFORCEMENT KG 260.28 4.20 1,093.18 0.07 18.38 1.61 418.14 0.74 191.48 0.29 76.52 2.64 686.14 6.84 1,779.32 1.85 481.78 8.69 2,261.10
4 FORMWORKS M2 6.47 65.00 420.47 2.09 13.50 45.61 295.04 5.67 36.66 3.25 21.02 54.53 352.72 119.53 773.19 32.36 209.35 151.89 982.54
5 CONCRETE COATING M2 4.05 9.90 40.10 0.17 0.70 3.69 14.93 0.00 0.00 0.50 2.00 4.18 16.93 14.08 57.03 3.81 15.44 17.89 72.47
6 CONCRETE SPLASH BLOCK EA 1.00 650.00 650.00 6.24 6.24 142.52 142.52 0.00 0.00 32.50 32.50 175.02 175.02 825.02 825.02 223.39 223.39 1,048.41 1,048.41
7 WINDOWS
- 0.6 x 0.5 ALUMINUM BOTTOM HINGED WITH
- POWDER COATED EA 1.00
TINTED TEMPERED GLASS 520.00 520.00 1.70 1.70 44.63 44.63 26.97 26.97 26.00 26.00 97.59 97.59 617.59 617.59 167.22 167.22 784.82 784.82
0.914 x 2.15 FLUSH TYPE PVC DOOR WITH
8 EA 1.00
LOUVER VENTILATION, SINGLE LEAF SWING
3,640.00 3,640.00 4.07 4.07 104.78 104.78 52.21 52.21 182.00 182.00 338.99 338.99 3,978.99 3,978.99 1,077.38 1,077.38 5,056.37 5,056.37
9 GUARD RAIL LM 4.90 360.00 1,764.00 1.73 8.48 43.33 212.33 10.67 52.27 18.00 88.20 72.00 352.79 432.00 2,116.79 116.97 573.16 548.97 2,689.95
10 DOWNSPOUT LM 2.70 110.00 297.00 0.69 1.86 14.75 39.81 0.00 0.00 5.50 14.85 20.25 54.66 130.25 351.66 35.27 95.22 165.51 446.88
11 LAVATORY EA 1.00 1,957.50 1,957.50 6.24 6.24 142.52 142.52 0.00 0.00 97.88 97.88 240.40 240.40 2,197.90 2,197.90 595.12 595.12 2,793.01 2,793.01
12 FLOOR DRAIN EA 1.00 350.00 350.00 3.12 3.12 71.26 71.26 0.00 0.00 17.50 17.50 88.76 88.76 438.76 438.76 118.80 118.80 557.56 557.56
13 WATER CLOSET EA 1.00 2,145.00 2,145.00 6.24 6.24 142.52 142.52 0.00 0.00 107.25 107.25 249.77 249.77 2,394.77 2,394.77 648.42 648.42 3,043.19 3,043.19
OTHERs
1 FIBER GLASS SCEPTIC TANK SET 1.00 12,500.00 12,500.00 56.92 56.92 1,330.66 1,330.66 950.00 950.00 625.00 625.00 2,905.66 2,905.66 15,405.66 15,405.66 4,171.34 4,171.34 19,577.00 19,577.00
2 10 KVA DIESEL GENERATOR SET 1.00 39,860.00 39,860.00 71.92 71.92 2,013.16 2,013.16 468.00 468.00 1,993.00 1,993.00 4,474.16 4,474.16 44,334.16 44,334.16 12,004.21 12,004.21 56,338.37 56,338.37
III. LANDSCAPING
1 EXCAVATION M3 540.98 0.00 0.37 201.82 6.43 3,477.16 16.89 9,138.45 0.25 135.25 23.57 12,750.86 23.57 12,750.86 6.38 3,452.51 29.95 16,203.36
2 SUB GRADE PREPARATION M2 1081.96 4.50 4,868.83 0.13 142.70 2.30 2,485.63 6.35 6,873.47 0.00 8.65 9,359.10 13.15 14,227.93 3.56 3,852.45 16.71 18,080.38
3 IRRIGATION LINE - INCLUDING CONNECTION TO THE EXISTING M2 1081.96 175.72 190,118.22 0.92 995.41 19.66 21,271.39 0.00 0.00 0.00 19.66 21,271.39 195.38 211,389.61 52.90 57,237.23 248.28 268,626.84
4 PLANTING SOIL M3 540.98 109.20 59,075.17 1.38 744.75 23.25 12,576.01 6.61 3,573.48 0.00 29.85 16,149.50 139.05 75,224.67 37.65 20,368.32 176.70 95,592.99
5 GRAVEL SURFACING M2 16902.60 13.28 224,382.02 2.07 34,988.38 44.24 747,686.51 0.00 0.00 0.13 2,243.82 44.37 749,930.33 57.64 974,312.35 15.61 263,811.17 73.25 1,238,123.51
6 INTERLOCKING PAVERS M2 1780.19 120.29 214,138.62 2.07 3,684.99 44.24 78,746.55 0.00 0.00 1.20 2,141.39 45.44 80,887.93 165.73 295,026.55 44.87 79,883.31 210.60 374,909.87
7 GRASS M2 3282.00 34.37 112,802.34 2.07 6,793.74 44.24 145,179.27 0.00 0.00 0.34 1,128.02 44.58 146,307.29 78.95 259,109.63 21.38 70,158.21 100.33 329,267.85
8 PALM TREE PLANTING INCLUDING GUYING EA 80.00
2,201.11 176,088.80 4.14 331.20 88.47 7,077.60 0.00 0.00 22.01 1,760.89 110.48 8,838.49 2,311.59 184,927.29 625.90 50,072.12 2,937.49 234,999.41
9 GENERAL TREES EA 60.00 337.97 20,278.20 4.14 248.40 88.47 5,308.20 0.00 0.00 3.38 202.78 91.85 5,510.98 429.82 25,789.18 116.38 6,982.85 546.20 32,772.03
10 SHRUB EA 250.00 48.69 12,172.50 4.14 1,035.00 88.47 22,117.50 0.00 0.00 0.49 121.73 88.96 22,239.23 137.65 34,411.73 37.27 9,317.54 174.92 43,729.27
11 GROUND COVER M2 500.00 65.16 32,580.00 2.07 1,035.00 44.24 22,117.50 0.00 0.00 0.65 325.80 44.89 22,443.30 110.05 55,023.30 29.80 14,898.47 139.84 69,921.77
12 GARBAGE ENCLOSURES EA 2.00 12,500.00 25,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,500.00 25,000.00 3,384.58 6,769.16 15,884.58 31,769.16
1 SMALL REFRIGERATOR - 3.0 CU. FT. EA 2.00 2,400.00 4,800.00 1.02 2.04 17.21 34.42 0.00 0.00 0.00 17.21 34.42 2,417.21 4,834.42 654.50 1,309.00 3,071.71 6,143.42
- FOR EXTERNAL WINDOW. CEILING/WALL
2 CURTAIN EA 4.00
MOUNTED 1,590.00 6,360.00 0.51 2.04 8.61 34.42 0.00 0.00 0.00 8.61 34.42 1,598.61 6,394.42 432.85 1,731.39 2,031.45 8,125.81
3 CORNER WOODEN CUPBOARD BUILT IN - (SLIDING DOORS + LOCKABLE) HI-LEVEL EA 2.00 3,250.00 6,500.00 0.51 1.02 8.61 17.21 0.00 0.00 0.00 8.61 17.21 3,258.61 6,517.21 882.32 1,764.64 4,140.93 8,281.85
4 WOODEN CHAIR WITH OPEN ARMS - LOW BACK EA 10.00 1,560.00 15,600.00 0.26 2.55 4.30 43.03 0.00 0.00 0.00 4.30 43.03 1,564.30 15,643.03 423.56 4,235.61 1,987.86 19,878.63
5 WOODEN 700 MM x 1200 MM DESK UNIT EA 2.00 1,550.00 3,100.00 1.02 2.04 17.21 34.42 0.00 0.00 0.00 17.21 34.42 1,567.21 3,134.42 424.35 848.70 1,991.56 3,983.12
6 SOFA SINGLE SEAT - WOOD LEGS, WOODEN ARMS EA 4.00 1,762.00 7,048.00 0.51 2.04 8.61 34.42 0.00 0.00 0.00 8.61 34.42 1,770.61 7,082.42 479.42 1,917.68 2,250.03 9,000.10
7 WOODEN RECTANGLE COFFEE TABLE - 800 MM EA 2.00 1,400.00 2,800.00 0.26 0.51 4.30 8.61 0.00 0.00 0.00 4.30 8.61 1,404.30 2,808.61 380.24 760.48 1,784.54 3,569.08
- SAMSUNG LED SERIES 7 OR EQUIVALENT WITH
8 46" TELEVISION EA 2.00
SATELLITE CONNECTION 6,400.00 12,800.00 0.51 1.02 8.61 17.21 0.00 0.00 0.00 8.61 17.21 6,408.61 12,817.21 1,735.24 3,470.47 8,143.84 16,287.68
MATTRESS WITH FIXED 2000 MM WIDTH
9 WIDTH WITH 2000 x 2000 MM WOODEN EA 2.00
(KING SIZE) BED UNIT 4,800.00 9,600.00 1.02 2.04 17.21 34.42 0.00 0.00 0.00 17.21 34.42 4,817.21 9,634.42 1,304.34 2,608.68 6,121.55 12,243.10
- FULL LENGTH , SHATTER PROOF, USER
10 MIRROR EA 2.00
STANDING, WALL MOUNTED 420.00 840.00 0.51 1.02 8.61 17.21 0.00 0.00 0.00 8.61 17.21 428.61 857.21 116.05 232.10 544.66 1,089.31
- RIYADH HOUSE INDUSTRIES OR APPROVED
11 BEDSIDE TABLE EA 4.00
EQUAL 620.00 2,480.00 0.26 1.02 4.30 17.21 0.00 0.00 0.00 4.30 17.21 624.30 2,497.21 169.04 676.16 793.34 3,173.37
12 TELEPHONE CONNECTION EA 2.00 480.00 960.00 0.26 0.51 4.30 8.61 0.00 0.00 0.00 4.30 8.61 484.30 968.61 131.13 262.27 615.44 1,230.87
13 SOFA THREE SEATS - WOOD LEGS, WOODEN ARMS EA 2.00 4,500.00 9,000.00 1.02 2.04 17.21 34.42 0.00 0.00 0.00 17.21 34.42 4,517.21 9,034.42 1,223.11 2,446.22 5,740.32 11,480.64
14 SOFA TWO SEATS - WOOD LEGS, WOODEN ARMS EA 2.00 3,900.00 7,800.00 0.51 1.02 8.61 17.21 0.00 0.00 0.00 8.61 17.21 3,908.61 7,817.21 1,058.32 2,116.64 4,966.92 9,933.85
TOW HOT PLATE ELECTRICAL RANGE ON
15 EA 2.00
COUNTER 4,800.00 9,600.00 1.02 2.04 17.21 34.42 0.00 0.00 0.00 17.21 34.42 4,817.21 9,634.42 1,304.34 2,608.68 6,121.55 12,243.10
16 LOW WOODEN RECTANGLE COFFEE TABLE - 600 MM x 1000 MM WIDTH EA 2.00
1,250.00 2,500.00 0.51 1.02 8.61 17.21 0.00 0.00 0.00 8.61 17.21 1,258.61 2,517.21 340.79 681.58 1,599.39 3,198.79
17 LOW WOODEN SQUARE COFFEE TABLE - 600 MM x 600 MM WIDTH EA 2.00 1,250.00 2,500.00 0.26 0.51 4.30 8.61 0.00 0.00 0.00 4.30 8.61 1,254.30 2,508.61 339.62 679.25 1,593.93 3,187.85
18 DINING TABLE & CHAIRS - FOR 2 PERSONS EA 2.00 4,200.00 8,400.00 0.77 1.53 12.91 25.82 0.00 0.00 0.00 12.91 25.82 4,212.91 8,425.82 1,140.71 2,281.43 5,353.62 10,707.24
19 TELEVISION TABLE - 400 MM WIDTH x 2000 MM LENGTH EA 2.00 1,850.00 3,700.00 0.77 1.53 12.91 25.82 0.00 0.00 0.00 12.91 25.82 1,862.91 3,725.82 504.41 1,008.83 2,367.32 4,734.64
20 FLOWER BOWL EA 8.00 350.00 2,800.00 0.26 2.04 4.30 34.42 0.00 0.00 0.00 4.30 34.42 354.30 2,834.42 95.93 767.47 450.24 3,601.89
21 MICROWAVE STANDER SIZE EA 2.00 1,280.00 2,560.00 0.26 0.51 4.30 8.61 0.00 0.00 0.00 4.30 8.61 1,284.30 2,568.61 347.75 695.49 1,632.05 3,264.10
22 WOODEN CIRCLE COFFEE TABLE - 400 MM DIAMETER EA 2.00 1,790.00 3,580.00 0.26 0.51 4.30 8.61 0.00 0.00 0.00 4.30 8.61 1,794.30 3,588.61 485.84 971.67 2,280.14 4,560.28
1 SMALL REFRIGERATOR - 3.0 CU. FT. EA 40.00 2,400.00 96,000.00 1.02 40.80 17.21 688.40 0.00 0.00 0.00 17.21 688.40 2,417.21 96,688.40 654.50 26,179.98 3,071.71 122,868.38
- FOR EXTERNAL WINDOW. CEILING/WALL
2 CURTAIN EA 40.00
MOUNTED 1,590.00 63,600.00 0.51 20.40 8.61 344.20 0.00 0.00 0.00 8.61 344.20 1,598.61 63,944.20 432.85 17,313.95 2,031.45 81,258.15
3 WOODEN CUPBOARD BUILT IN - (4 SLIDING DOORS + LOCKABLE) HI-LEVEL EA 40.00 3,250.00 130,000.00 0.51 20.40 8.61 344.20 0.00 0.00 0.00 8.61 344.20 3,258.61 130,344.20 882.32 35,292.85 4,140.93 165,637.05
4 EASY CHAIR WITH OPEN ARMS - (LOW BACK), FREE STANDING EA 40.00 1,560.00 62,400.00 0.26 10.20 4.30 172.10 0.00 0.00 0.00 4.30 172.10 1,564.30 62,572.10 423.56 16,942.43 1,987.86 79,514.53
5 WOODEN 700 MM x 1200 MM DESK UNIT EA 40.00 1,550.00 62,000.00 1.02 40.80 17.21 688.40 0.00 0.00 0.00 17.21 688.40 1,567.21 62,688.40 424.35 16,973.92 1,991.56 79,662.32
6 SOFA SINGLE SEAT - WOOD LEGS, WOODEN ARMS EA 40.00 1,762.00 70,480.00 0.51 20.40 8.61 344.20 0.00 0.00 0.00 8.61 344.20 1,770.61 70,824.20 479.42 19,176.82 2,250.03 90,001.02
7 WOODEN CIRCLE COFFEE TABLE - 700 MM DIAMETER EA 40.00 1,400.00 56,000.00 0.26 10.20 4.30 172.10 0.00 0.00 0.00 4.30 172.10 1,404.30 56,172.10 380.24 15,209.52 1,784.54 71,381.62
- SAMSUNG LED SERIES 7 OR EQUIVALENT WITH
8 42" TELEVISION EA 40.00
SATELLITE CONNECTION 5,600.00 224,000.00 0.51 20.40 8.61 344.20 0.00 0.00 0.00 8.61 344.20 5,608.61 224,344.20 1,518.62 60,744.90 7,127.23 285,089.10
MATTRESS WITH FIXED 1000 MM WIDTH
9 WIDTH WITH 1800 x 1000 MM WOODEN BED EA 40.00
UNIT 3,500.00 140,000.00 1.02 40.80 17.21 688.40 0.00 0.00 0.00 17.21 688.40 3,517.21 140,688.40 952.34 38,093.71 4,469.55 178,782.11
- FULL LENGTH , SHATTER PROOF, USER
10 MIRROR EA 40.00
STANDING, WALL MOUNTED 420.00 16,800.00 0.51 20.40 8.61 344.20 0.00 0.00 0.00 8.61 344.20 428.61 17,144.20 116.05 4,642.08 544.66 21,786.28
- RIYADH HOUSE INDUSTRIES OR APPROVED
11 BEDSIDE TABLE EA 40.00
EQUAL 620.00 24,800.00 0.26 10.20 4.30 172.10 0.00 0.00 0.00 4.30 172.10 624.30 24,972.10 169.04 6,761.61 793.34 31,733.71
12 TELEPHONE CONNECTION EA 40.00 480.00 19,200.00 0.26 10.20 4.30 172.10 0.00 0.00 0.00 4.30 172.10 484.30 19,372.10 131.13 5,245.32 615.44 24,617.42
13 SOFA THREE SEATS - WOOD LEGS, WOODEN ARMS EA 40.00 4,500.00 180,000.00 1.02 40.80 17.21 688.40 0.00 0.00 0.00 17.21 688.40 4,517.21 180,688.40 1,223.11 48,924.37 5,740.32 229,612.77
14 SOFA TWO SEATS - WOOD LEGS, WOODEN ARMS EA 40.00 3,900.00 156,000.00 0.51 20.40 8.61 344.20 0.00 0.00 0.00 8.61 344.20 3,908.61 156,344.20 1,058.32 42,332.78 4,966.92 198,676.98
15 SOFA SINGLE SEAT - WOOD LEGS, WOODEN ARMS EA 40.00 3,250.00 130,000.00 0.51 20.40 8.61 344.20 0.00 0.00 0.00 8.61 344.20 3,258.61 130,344.20 882.32 35,292.85 4,140.93 165,637.05
16 LOW WOODEN RECTANGLE COFFEE TABLE - 600 MM x 1000 MM WIDTH EA 40.00
1,250.00 50,000.00 0.51 20.40 8.61 344.20 0.00 0.00 0.00 8.61 344.20 1,258.61 50,344.20 340.79 13,631.52 1,599.39 63,975.72
17 LOW WOODEN SQUARE COFFEE TABLE - 600 MM x 600 MM WIDTH EA 40.00 1,250.00 50,000.00 0.26 10.20 4.30 172.10 0.00 0.00 0.00 4.30 172.10 1,254.30 50,172.10 339.62 13,584.93 1,593.93 63,757.03
18 DINING TABLE & CHAIRS - FOR 2 PERSONS EA 40.00 4,200.00 168,000.00 0.77 30.60 12.91 516.30 0.00 0.00 0.00 12.91 516.30 4,212.91 168,516.30 1,140.71 45,628.57 5,353.62 214,144.87
- 400 x 1200 MM WITH 1000 x 800 MM WALL
19 CONSOLE TABLE EA 40.00
MOUNTED MIRROR 1,850.00 74,000.00 0.77 30.60 12.91 516.30 0.00 0.00 0.00 12.91 516.30 1,862.91 74,516.30 504.41 20,176.52 2,367.32 94,692.82
20 FLOWER BOWL EA 120.00 350.00 42,000.00 0.26 30.60 4.30 516.30 0.00 0.00 0.00 4.30 516.30 354.30 42,516.30 95.93 11,511.99 450.24 54,028.29
1 SMALL REFRIGERATOR - 3.0 CU. FT. EA 128.00 2,400.00 307,200.00 1.02 130.56 17.21 2,202.88 0.00 0.00 0.00 17.21 2,202.88 2,417.21 309,402.88 654.50 83,775.94 3,071.71 393,178.82
- FOR EXTERNAL WINDOW. CEILING/WALL
2 CURTAIN EA 128.00
MOUNTED 1,590.00 203,520.00 0.51 65.28 8.61 1,101.44 0.00 0.00 0.00 8.61 1,101.44 1,598.61 204,621.44 432.85 55,404.64 2,031.45 260,026.08
3 WOODEN CUPBOARD BUILT IN - (4 SLIDING DOORS + LOCKABLE) HI-LEVEL EA 128.00 3,250.00 416,000.00 0.51 65.28 8.61 1,101.44 0.00 0.00 0.00 8.61 1,101.44 3,258.61 417,101.44 882.32 112,937.11 4,140.93 530,038.55
4 EASY CHAIR WITH OPEN ARMS - (LOW BACK), FREE STANDING EA 128.00 1,560.00 199,680.00 0.26 32.64 4.30 550.72 0.00 0.00 0.00 4.30 550.72 1,564.30 200,230.72 423.56 54,215.78 1,987.86 254,446.50
5 WOODEN 700 MM x 1200 MM DESK UNIT EA 128.00 1,550.00 198,400.00 1.02 130.56 17.21 2,202.88 0.00 0.00 0.00 17.21 2,202.88 1,567.21 200,602.88 424.35 54,316.54 1,991.56 254,919.42
6 SOFA SINGLE SEAT - WOOD LEGS, WOODEN ARMS EA 128.00 3,250.00 416,000.00 0.51 65.28 8.61 1,101.44 0.00 0.00 0.00 8.61 1,101.44 3,258.61 417,101.44 882.32 112,937.11 4,140.93 530,038.55
7 WOODEN CIRCLE COFFEE TABLE - 700 MM DIAMETER EA 128.00 1,400.00 179,200.00 0.26 32.64 4.30 550.72 0.00 0.00 0.00 4.30 550.72 1,404.30 179,750.72 380.24 48,670.48 1,784.54 228,421.20
- SAMSUNG LED SERIES 7 OR EQUIVALENT WITH
8 37" TELEVISION EA 128.00
SATELLITE CONNECTION 4,200.00 537,600.00 0.51 65.28 8.61 1,101.44 0.00 0.00 0.00 8.61 1,101.44 4,208.61 538,701.44 1,139.55 145,862.32 5,348.15 684,563.76
MATTRESS WITH FIXED 1000 MM WIDTH
9 WIDTH WITH 1800 x 1000 MM WOODEN BED EA 128.00
UNIT 3,500.00 448,000.00 1.02 130.56 17.21 2,202.88 0.00 0.00 0.00 17.21 2,202.88 3,517.21 450,202.88 952.34 121,899.87 4,469.55 572,102.75
- FULL LENGTH , SHATTER PROOF, USER
10 MIRROR EA 128.00
STANDING, WALL MOUNTED 420.00 53,760.00 0.51 65.28 8.61 1,101.44 0.00 0.00 0.00 8.61 1,101.44 428.61 54,861.44 116.05 14,854.64 544.66 69,716.08
- RIYADH HOUSE INDUSTRIES OR APPROVED
11 BEDSIDE TABLE EA 128.00
EQUAL 620.00 79,360.00 0.26 32.64 4.30 550.72 0.00 0.00 0.00 4.30 550.72 624.30 79,910.72 169.04 21,637.15 793.34 101,547.87
12 TELEPHONE CONNECTION EA 128.00 480.00 61,440.00 0.26 32.64 4.30 550.72 0.00 0.00 0.00 4.30 550.72 484.30 61,990.72 131.13 16,785.01 615.44 78,775.73
13 FLOWER BOWL EA 128.00 350.00 44,800.00 0.26 32.64 4.30 550.72 0.00 0.00 0.00 4.30 550.72 354.30 45,350.72 95.93 12,279.46 450.24 57,630.18
1 SOFA THREE SEATS - WOOD LEGS, WOODEN ARMS EA 24.00 4,500.00 108,000.00 1.02 24.48 17.21 413.04 0.00 0.00 0.00 17.21 413.04 4,517.21 108,413.04 1,223.11 29,354.62 5,740.32 137,767.66
2 SOFA SINGLE SEAT - WOOD LEGS, WOODEN ARMS EA 21.00 3,250.00 68,250.00 0.51 10.71 8.61 180.71 0.00 0.00 0.00 8.61 180.71 3,258.61 68,430.71 882.32 18,528.74 4,140.93 86,959.45
- SAMSUNG LED SERIES 7 OR EQUIVALENT WITH
3 46" TELEVISION EA 3.00
SATELLITE CONNECTION 6,400.00 19,200.00 0.51 1.53 8.61 25.82 0.00 0.00 0.00 8.61 25.82 6,408.61 19,225.82 1,735.24 5,205.71 8,143.84 24,431.52
4 LOW WOODEN RECTANGLE COFFEE TABLE - 800 MM x 1600 MM WIDTH EA 12.00
1,400.00 16,800.00 1.02 12.24 17.21 206.52 0.00 0.00 0.00 17.21 206.52 1,417.21 17,006.52 383.73 4,604.80 1,800.94 21,611.32
5 TELEPHONE CONNECTION EA 3.00 480.00 1,440.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 484.30 1,452.91 131.13 393.40 615.44 1,846.31
6 DINING TABLE & CHAIRS - FOR 4 PERSONS EA 12.00 4,200.00 50,400.00 1.02 12.24 17.21 206.52 0.00 0.00 0.00 17.21 206.52 4,217.21 50,606.52 1,141.88 13,702.55 5,359.09 64,309.07
V. KITCHEN
1 ONE BOWL SINK WITH SIDE DRAIN EA 3.00 1,850.00 5,550.00 1.02 3.06 17.21 51.63 0.00 0.00 0.00 17.21 51.63 1,867.21 5,601.63 505.58 1,516.73 2,372.79 7,118.36
2 BOTTLE TYPW WATER COOLER EA 3.00 1,450.00 4,350.00 0.51 1.53 8.61 25.82 0.00 0.00 0.00 8.61 25.82 1,458.61 4,375.82 394.94 1,184.82 1,853.55 5,560.64
3 TWO DOOR REFRIGERATOR EA 3.00 16,000.00 48,000.00 1.02 3.06 17.21 51.63 0.00 0.00 0.00 17.21 51.63 16,017.21 48,051.63 4,336.92 13,010.77 20,354.13 61,062.40
4 WATER BOILER EA 3.00 1,200.00 3,600.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 1,204.30 3,612.91 326.08 978.25 1,530.39 4,591.16
5 JUICE DISPENSER EA 3.00 2,600.00 7,800.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 2,604.30 7,812.91 705.16 2,115.47 3,309.46 9,928.38
6 DOUBLE GROUP COFFEE MACHINE EA 3.00 5,200.00 15,600.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 5,204.30 15,612.91 1,409.15 4,227.45 6,613.45 19,840.36
7 MICROWAVE OVEN EA 3.00 1,400.00 4,200.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 1,404.30 4,212.91 380.24 1,140.71 1,784.54 5,353.62
TWO HOT PLATE ELECTRICAL RANGE ON
8 EA 3.00
COUNTER 5,600.00 16,800.00 1.02 3.06 17.21 51.63 0.00 0.00 0.00 17.21 51.63 5,617.21 16,851.63 1,520.95 4,562.86 7,138.16 21,414.49
- BASE SIZE: 660 MM DP x 914 MM HG x 5000 MM LG:
9 MODULAR KITCHEN CABINET EA 6.00
WALL SIZE: 305 MM DP x 714 MM HG x 5000 MM LG
12,000.00 72,000.00 2.07 12.42 44.24 265.41 0.00 0.00 0.00 44.24 265.41 12,044.24 72,265.41 3,261.18 19,567.05 15,305.41 91,832.46
B. BUILDING 122-123
I. GRADE (3-10) - SLEEPING UNIT
1 SMALL REFRIGERATOR - 3.0 CU. FT. EA 124.00 2,400.00 297,600.00 1.02 126.48 17.21 2,134.04 0.00 0.00 0.00 17.21 2,134.04 2,417.21 299,734.04 654.50 81,157.94 3,071.71 380,891.98
- FOR EXTERNAL WINDOW. CEILING/WALL
2 CURTAIN EA 124.00
MOUNTED 1,590.00 197,160.00 0.51 63.24 8.61 1,067.02 0.00 0.00 0.00 8.61 1,067.02 1,598.61 198,227.02 432.85 53,673.24 2,031.45 251,900.26
3 WOODEN CUPBOARD BUILT IN - (4 SLIDING DOORS + LOCKABLE) HI-LEVEL EA 124.00 3,250.00 403,000.00 0.51 63.24 8.61 1,067.02 0.00 0.00 0.00 8.61 1,067.02 3,258.61 404,067.02 882.32 109,407.82 4,140.93 513,474.84
4 EASY CHAIR WITH OPEN ARMS - (LOW BACK), FREE STANDING EA 124.00 1,560.00 193,440.00 0.26 31.62 4.30 533.51 0.00 0.00 0.00 4.30 533.51 1,564.30 193,973.51 423.56 52,521.53 1,987.86 246,495.04
5 WOODEN 700 MM x 1200 MM DESK UNIT EA 124.00 1,550.00 192,200.00 1.02 126.48 17.21 2,134.04 0.00 0.00 0.00 17.21 2,134.04 1,567.21 194,334.04 424.35 52,619.15 1,991.56 246,953.19
6 SOFA SINGLE SEAT - WOOD LEGS, WOODEN ARMS EA 124.00 3,250.00 403,000.00 0.51 63.24 8.61 1,067.02 0.00 0.00 0.00 8.61 1,067.02 3,258.61 404,067.02 882.32 109,407.82 4,140.93 513,474.84
7 WOODEN CIRCLE COFFEE TABLE - 700 MM DIAMETER EA 124.00 1,400.00 173,600.00 0.26 31.62 4.30 533.51 0.00 0.00 0.00 4.30 533.51 1,404.30 174,133.51 380.24 47,149.53 1,784.54 221,283.04
- SAMSUNG LED SERIES 7 OR EQUIVALENT WITH
8 37" TELEVISION EA 124.00
SATELLITE CONNECTION 4,200.00 520,800.00 0.51 63.24 8.61 1,067.02 0.00 0.00 0.00 8.61 1,067.02 4,208.61 521,867.02 1,139.55 141,304.12 5,348.15 663,171.14
MATTRESS WITH FIXED 1000 MM WIDTH
9 WIDTH WITH 1800 x 1000 MM WOODEN BED EA 124.00
UNIT 3,500.00 434,000.00 1.02 126.48 17.21 2,134.04 0.00 0.00 0.00 17.21 2,134.04 3,517.21 436,134.04 952.34 118,090.50 4,469.55 554,224.54
- FULL LENGTH , SHATTER PROOF, USER
10 MIRROR EA 124.00
STANDING, WALL MOUNTED 420.00 52,080.00 0.51 63.24 8.61 1,067.02 0.00 0.00 0.00 8.61 1,067.02 428.61 53,147.02 116.05 14,390.43 544.66 67,537.45
- RIYADH HOUSE INDUSTRIES OR APPROVED
11 BEDSIDE TABLE EA 124.00
EQUAL 620.00 76,880.00 0.26 31.62 4.30 533.51 0.00 0.00 0.00 4.30 533.51 624.30 77,413.51 169.04 20,960.99 793.34 98,374.50
12 TELEPHONE CONNECTION EA 124.00 480.00 59,520.00 0.26 31.62 4.30 533.51 0.00 0.00 0.00 4.30 533.51 484.30 60,053.51 131.13 16,260.48 615.44 76,313.99
13 FLOWER BOWL EA 124.00 350.00 43,400.00 0.26 31.62 4.30 533.51 0.00 0.00 0.00 4.30 533.51 354.30 43,933.51 95.93 11,895.72 450.24 55,829.23
1 SOFA THREE SEATS - WOOD LEGS, WOODEN ARMS EA 24.00 4,500.00 108,000.00 1.02 24.48 17.21 413.04 0.00 0.00 0.00 17.21 413.04 4,517.21 108,413.04 1,223.11 29,354.62 5,740.32 137,767.66
2 SOFA SINGLE SEAT - WOOD LEGS, WOODEN ARMS EA 21.00 3,250.00 68,250.00 0.51 10.71 8.61 180.71 0.00 0.00 0.00 8.61 180.71 3,258.61 68,430.71 882.32 18,528.74 4,140.93 86,959.45
- SAMSUNG LED SERIES 7 OR EQUIVALENT WITH
3 46" TELEVISION EA 3.00
SATELLITE CONNECTION 6,400.00 19,200.00 0.51 1.53 8.61 25.82 0.00 0.00 0.00 8.61 25.82 6,408.61 19,225.82 1,735.24 5,205.71 8,143.84 24,431.52
4 LOW WOODEN RECTANGLE COFFEE TABLE - 800 MM x 1600 MM WIDTH EA 12.00
1,400.00 16,800.00 1.02 12.24 17.21 206.52 0.00 0.00 0.00 17.21 206.52 1,417.21 17,006.52 383.73 4,604.80 1,800.94 21,611.32
5 TELEPHONE CONNECTION EA 3.00 480.00 1,440.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 484.30 1,452.91 131.13 393.40 615.44 1,846.31
6 DINING TABLE & CHAIRS - FOR 4 PERSONS EA 12.00 4,200.00 50,400.00 1.02 12.24 17.21 206.52 0.00 0.00 0.00 17.21 206.52 4,217.21 50,606.52 1,141.88 13,702.55 5,359.09 64,309.07
III. KITCHEN
1 ONE BOWL SINK WITH SIDE DRAIN EA 3.00 1,850.00 5,550.00 1.02 3.06 17.21 51.63 0.00 0.00 0.00 17.21 51.63 1,867.21 5,601.63 505.58 1,516.73 2,372.79 7,118.36
2 BOTTLE TYPW WATER COOLER EA 3.00 1,450.00 4,350.00 0.51 1.53 8.61 25.82 0.00 0.00 0.00 8.61 25.82 1,458.61 4,375.82 394.94 1,184.82 1,853.55 5,560.64
3 TWO DOOR REFRIGERATOR EA 3.00 16,000.00 48,000.00 1.02 3.06 17.21 51.63 0.00 0.00 0.00 17.21 51.63 16,017.21 48,051.63 4,336.92 13,010.77 20,354.13 61,062.40
4 WATER BOILER EA 3.00 1,200.00 3,600.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 1,204.30 3,612.91 326.08 978.25 1,530.39 4,591.16
5 JUICE DISPENSER EA 3.00 2,600.00 7,800.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 2,604.30 7,812.91 705.16 2,115.47 3,309.46 9,928.38
6 DOUBLE GROUP COFFEE MACHINE EA 3.00 5,200.00 15,600.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 5,204.30 15,612.91 1,409.15 4,227.45 6,613.45 19,840.36
7 MICROWAVE OVEN EA 3.00 1,400.00 4,200.00 0.26 0.77 4.30 12.91 0.00 0.00 0.00 4.30 12.91 1,404.30 4,212.91 380.24 1,140.71 1,784.54 5,353.62
TWO HOT PLATE ELECTRICAL RANGE ON
8 EA 3.00
COUNTER 5,600.00 16,800.00 1.02 3.06 17.21 51.63 0.00 0.00 0.00 17.21 51.63 5,617.21 16,851.63 1,520.95 4,562.86 7,138.16 21,414.49
- BASE SIZE: 660 MM DP x 914 MM HG x 5000 MM LG:
9 MODULAR KITCHEN CABINET EA 6.00
WALL SIZE: 305 MM DP x 714 MM HG x 5000 MM LG
12,000.00 72,000.00 2.07 12.42 44.24 265.41 0.00 0.00 0.00 44.24 265.41 12,044.24 72,265.41 3,261.18 19,567.05 15,305.41 91,832.46
C EXCESS IN DESIGN AND ENGINEERING 6,983,520.00 LOT 1.00 1,995,291.43 1,995,291.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,995,291.43 1,995,291.43 540,258.12 540,258.12 2,535,549.55 2,535,549.55
D COMMUNICATION AND CATV - INFRASTRUCTURE ONLY LOT 1.00 1,200,000.00 1,200,000.00 0.00 0.00 300,000.00 300,000.00 0.00 0.00 0.00 300,000.00 300,000.00 1,500,000.00 1,500,000.00 406,149.79 406,149.79 1,906,149.79 1,906,149.79
2.82% 4,988,228.57 0.00 0.00 0.00 0.00 0.00 4,988,228.57 1,350,645.31 6,338,873.88
131,145,844.49 1,144,394.96 25,704,639.08 14,983,291.48 4,954,795.85 45,642,726.41 176,788,570.90 47,868,426.81 224,656,997.71
Project : KHURAIS AL CRUDE INCREMENT - 300 MBCD
: RIC RESIDENTIAL BUILDINGS
: BI-10-01506
BUILDING WORKS
SR NO. ITEM DESCRIPTION / SPECIFICATION UNIT Q'TY
(1) (2) (3) (4) (5)
I. EARTH WORKS
1 EXCAVATION M3 20129.06
2 BACKFILLING - COMPACTED SELECT FILL AS PER SAES-A-114 M3 9334.97
3 DISPOSAL M3 10794.09
4 GRAVEL FILLING - CRUSHED STONE 200 MM THK. M2 2160.00
5 POLYETHYLENE SHEET - 0.15 MM THK. M2 10066.40
6 BITUMINOUS COATING M2 13379.90
V. TILE WORKS
1 NON-SLIP CERAMIC TILES - 400 x 400 x 10 MM THK M2 9234.95
2 NON-SLIP PORCELAIN TILES - 400 x 400 MM M2 2064.15
3 CARPET TILES - 500 x 500 M2 8817.44
4 GRANITE TILES - VITRIFIED, POLISHED, DESERT BROWN COLOR M2 1265.33
5 ANTI STATIC VINYL TILES M2 294.80
6 GRANITE - 600 x 150 MM, WALL BASE LM 1104.15
7 VINYL BASE - 100 MM LM 245.99
8 WOODEN BASE - 100 MM LM 8705.44
9 CERAMIC TILE - 100 MM, BASE LM 9458.10
X PRECAST WORKS
HVAC
SR NO. ITEM DESCRIPTION / SPECIFICATION UNIT Q'TY
(1) (2) (3) (4) (5)
ELECTRICAL
SR NO. ITEM DESCRIPTION / SPECIFICATION UNIT Q'TY
(1) (2) (3) (4) (5)
1 High Voltage
15KV, 1/C, 150mm2 XLPE/SWA/PVC,
1.1 COPPER, insulated cable, suitable for direct LM 6450.00
burial.
600V, 3C, XLPE, SWA/PVC, COPPER,
2
insulated cable - size as follows:
2.1 1/C, 10mm2 PVC GRD LM 960.00
2.2 1/C, 16mm2 PVC GRD LM 650.00
2.3 1/C, 25mm2 PVC GRD LM 360.00
2.4 1/C, 35mm2 PVC GRD LM 900.00
2.5 1/C, 95mm2 PVC GRD LM 6530.00
2.6 3/C 95mm2 XLPE/PVC LM 160.00
2.7 3/C 150mm2, XLPE/PVC LM 1080.00
2.8 3/C 185mm2, XLPE/PVC LM 800.00
2.9 3/C 240mm2, XLPE/PVC LM 1200.00
2.1 3/C 4mm2, XLPE/PVC LM 68600.00
2.11 3/C 6mm2, XLPE/PVC LM 66500.00
2.12 4/C 6mm2, XLPE/PVC LM 320.00
2.13 4/C 10mm2, XLPE/PVC LM 960.00
2.14 4/C 35mm2, XLPE/PVC LM 330.00
2.15 4/C 50mm2, XLPE/PVC LM 700.00
2.16 4/C 95mm2, XLPE/PVC LM 200.00
2.17 4/C 120mm2, XLPE/PVC LM 180.00
2.18 4/C 150mm2, XLPE/PVC LM 560.00
2.19 4/C 185mm2, XLPE/PVC LM 80.00
2.20 4/C 240mm2, XLPE/SWA/PVC LM 1700.00
2.21 12/C 2.5mm2,SWA/PVC LM 380.00
2.5mm2 Shielded Twisted Pair Copper Fire
2.22 LM 25000.00
Rated Cable
LIGHTING POLES - INCLUDING ANCHOR BOLTS AND BASE PLATE SET 24.00
FLOOD LIGHTS SET 24.00
1 EXCAVATION M3 10049.79
2 SANDFILL M3 6029.88
3 GRAVEL FILL M3 14.40
4 ORDINARY BACKFILL M3 4019.92
5 DISPOSAL M3 6029.88
- INCLUDING FORMWORKS, REINFORCEMENT,
6 TRANSFORMER PAD M3 38.40
CONCRETE COATING
7 TRANSFORMER PAD FENCE LM 72.00
8 TRANSFORMER PAD GATE EA 8.00
9 BOLLARD POST EA 32.00
- INCLUDING FORMWORKS, REINFORCEMENT,
10 DUCT BANK M3 157.50
CONCRETE COATING
11 WARNING TAPE LM 2512.45
12 CONCRETE M3 2.59
13 FORMWORKS M2 34.56
14 REINFORCEMENT KG 7464.96
15 CONCRETE COATING M2 34.56
PLUMBING
SR NO. ITEM DESCRIPTION / SPECIFICATION UNIT Q'TY
(1) (2) (3) (4) (5)
2 Floor Drain
2.1 3” Schedule 40 EA 72.00
3 Floor Cleanouts
3.1 4” Schedule 40 EA 288.00
5 Roof Drain
5.1 3” Schedule 40 EA 60.00
I. EARTH WORKS
1 EXCAVATION M3 4104.00
2 BACKFILLING - COMPACTED SELECT FILL AS PER SAES-A-114 M3 1641.60
3 DISPOSAL M3 2462.40
4 SANDFILL M3 2462.40
5 WARNING TAPE M2 1026.00
V. MISCELLANEOUS WORKS
1 JUNCTION BOX EA 1520.00
2 UTILITY BOX EA 64.00
3 PULL BOX EA 24.00
- TYPE 509-G
4 FIRE HYDRANTS SET 12.00
'- INCLUDING GATE VALVES
- TYPE 509-E
5 FIRE HYDRANTS SET 2.00
'- INCLUDING GATE VALVES
6 BOLLARDS EA 72.00
7 AIR RELEASE VALVE & CHAMBER SET 2.00
8 WASHOUT VALVE & CHAMBER SET 2.00
9 150 MM DIA FRP PIPE - INCLUDING FITTINGS LM 1026.00
Project : KHURAIS AL CRUDE INCREMENT - 300 MBCD
: RIC RESIDENTIAL BUILDINGS
: BI-10-01506
I. ADDITIONAL CHILLERS
1 EXCAVATION M3 825.00
2 SANDFILL M3 495.00
3 ORDINARY BACK FILL M3 330.00
4 DISPOSAL M3 495.00
5 WARNING TAPE LM 275.00
- INCLUDING FORMWORKS, REINFORCEMENT,
6 DUCT BANK M3 8.10
CONCRETE COATING
SUPPLY & INSTALL OF NEW CHILLER
7 LOT 1.00
INCLUDING:
- 5 SETS OF PRESSURE INDICATOR
- 2 SETS OF TEMPERATURE INDICATOR
1 EXCAVATION M3 234.69
2 COMPACTED SUBGRADE M3 33.53
3 SELECT FILL M3 292.97
4 SAND FILL (CLEAN SWEET SAND) M3 32.66
5 GRAVEL FILL M3 6.54
POLYETHYLENE SHEET VAPOR BARRIER
6 M2 100.28
1000 MICRON THK.
0.15 MM THK POLYETHYLENE FILM VAPOR
7 M2 62.43
BARRIER
8 LEAN CONCRETE M3 3.43
9 CONCRETE M3 25.52
10 SAND CEMENT M3 11.53
11 REINFORCEMENT KG 3158.31
12 150 x 150 MW 50 x MW 50 WWF M2 55.98
13 FORMWORKS M2 126.25
14 BITUMINOUS COATING M2 114.91
15 ASPHALT IMPREGNATED BOARD M2 51.84
16 MISCELLANEOUS STEEL KG 39.04
WELDED STEEL GRATING TYPE W19-3/4" x
17 M2 2.70
1/8"
18 6" DIA. PVC PIPE SLEEVE LM 1.92
19 4" DIA PVC PIPE LM 3.84
20 NON-SHRINK GROUT M3 0.04
21 GUARD POST EA 12.00
SUPPLY & INSTALLATION OF NEW
STORAGE TANK
- CAPACITY = 71327 US GAL.
22 LOT 1.00
- INSIDE DIA. = 8000 MM
- HEIGHT = 6374 MM
INCLUDING:
- 2 SETS OF 150 MM DIA CHECK VALVE
- 1 SET OF 100 MM DIA GLOBE VALVE
- 1 SET OF 150 MM DIA STRAINER
- 1 SET OF 300 MM DIA STRAINER
- 3 SETS OF 100 MM DIA GATE VALVES
- 1 SET 75 MM DIA BALL VALVE
1 EARTH WORKS
1.1 EXCAVATION M3 4050.00
1.2 SAND FILL M3 2430.00
1.3 ORDINARY BACKFILL M3 1620.00
1.4 DISPOSAL M3 2430.00
1.5 WARNING TAPE LM 890.00
1.6 CATHODIC PROTECTION LM 890.00
2 PIPE WORKS
REMOVAL OF EXISTING CHILLED WATER
2.1
PIPE
- RETURN PIPE 400 MM DIA CARBON STEEL
LM 230.00
PIPE INSULATED
- SUPPLY PIPE 400 MM DIA CARBON STEEL
LM 230.00
PIPE INSULATED
RELOCATION OF EXISTING CHILLED WATER
2.2
VALVE BOX
SUPPLY & INSTALLATION OF CHILLED
2.3
WATER PIPE
- RETURN PIPE 400 MM DIA CARBON STEEL - INCLUDING FITTINGS AND OTHER
LM 445.00
PIPE INSULATED (CEMENT LINED) APPURTENANCES
- SUPPLY PIPE 400 MM DIA CARBON STEEL - INCLUDING FITTINGS AND OTHER
LM 445.00
PIPE INSULATED (CEMENT LINED) APPURTENANCES
3 PAVING WORKS
3.1 ASPHALT BREAKING M2 30.00
3.2 DEMILITION OF CURBSTONE LM 9.00
3.3 DEMOLITION OF SIDE WALK PAVING M2 17.00
- INCLUDING SUBGRADE PREPARATION, SUB BASE,
3.4 ASPHALT PAVING BASE CORSE, WEARING COURSE, BINDER COURSE, M2 30.00
TACK COAT & PRIME COAT
1 EARTH WORKS
1.1 EXCAVATION M3 996.00
1.2 SAND FILL M3 597.60
1.3 ORDINARY BACKFILL M3 398.40
1.4 DISPOSAL M3 597.60
1.5 WARNING TAPE LM 235.00
2 PIPE WORKS
REMOVAL OF EXISTING 200 MM DIA PVC
2.1 LM 180.00
CLASS 12 SEWER LINE
REMOVAL OF EXISTING FIBER GLASS
2.2 NOS 3.00
SEWER MANHOLE
SUPPLY & INSTALLATION OF 200 MM DIA - INCLUDING FITTINGS AND OTHER
2.3 LM 235.00
PVC SCHED. 40 SEWER LINE APPURTENANCES
SUPPLY & INSTALLATION OF FIBER GLASS - INCLUDING MANHOLE COVER AND OTHER
2.4 NOS 3.00
SEWER MANHOLE FITTINGS
3 PAVING WORKS
3.1 ASPHALT BREAKING M2 126.00
3.2 DEMILITION OF CURBSTONE LM 10.00
3.3 DEMOLITION OF SIDE WALK PAVING M2 12.00
- INCLUDING SUBGRADE PREPARATION, SUB BASE,
3.4 ASPHALT PAVING BASE CORSE, WEARING COURSE, BINDER COURSE, M2 126.00
TACK COAT & PRIME COAT
1 EARTH WORKS
1.1 EXCAVATION M3 590.40
1.2 SAND FILL M3 336.00
1.3 ORDINARY BACKFILL M3 254.40
1.4 DISPOSAL M3 336.00
1.6 WARNING TAPE LM 350.00
2 PIPE WORKS
REMOVAL OF EXISTING 25MM DIA PVC
2.1 LM 142.00
POTABLE WATER LINE
3 PAVING WORKS
3.1 ASPHALT BREAKING M2 28.00
3.2 DEMILITION OF CURBSTONE LM 12.00
3.3 DEMOLITION OF SIDE WALK PAVING M2 16.00
- INCLUDING SUBGRADE PREPARATION, SUB BASE,
3.4 ASPHALT PAVING BASE CORSE, WEARING COURSE, BINDER COURSE, M2 28.00
TACK COAT & PRIME COAT
SITE DEVELOPMENT
SR NO. ITEM DESCRIPTION / SPECIFICATION UNIT Q'TY
(1) (2) (3) (4) (5)
I. PARKING SHED
1 EXCAVATION M3 1443.25
DEMOLITION OF EXISTING PARKING SHED,
2 INCLUDING BEAMS, COLUMNS, PARAPETS, M2 636.00
ALUMINUM TRELLIS
3 DEMOLITION OF EXISTING PAVING TILES M2 204.00
4 DEMOLITION OF EXISTING CURBSTONE LM 136.00
5 ASPHALT BREAKING M2 636.00
SUPPLY AND INSTALLATION OF PAVING
6 M2 1828.22
BLOCKS
SUPPLY AND INSTALLATION OF
7 LM 979.26
CURBSTONE
- INCLUDING SUBGRADE PREPARATION, SUB BASE,
8 ASPHALT PAVING WORKS BASE CORSE, WEARING COURSE, BINDER COURSE, M2 2752.07
TACK COAT & PRIME COAT
9 PRECAST WORKS
- T-SHAPES PRECAST COLUMN & HEAD
NOS 16.00
BEAM, CAST IN 2 PCS.
- 300 x 320 x 6000 MM LONG INTERMEDIATE
LM 168.00
BEAMS
- 200/300 x 1000 MM DEEP PRECAST
LM 257.00
CONCRETE SPANDREL BEAMS/PARAPET
10 ALUMINUM TRELLIS M2 888.00
WHITE CEMENT FINE AGGREGATES FINISH
11 M2 1103.68
SAND BLASTED
12 WHEEL STOPPER EA 40.00
GUARD HOUSE
1 PORTABLE PRE-FABRICATED BUILDING - WITH 1 HR FIRE RATED EXTERNAL WALL M2 9.61
2 CONCRETE M3 2.33
3 REINFORCEMENT KG 279.00
4 FORMWORKS M2 6.47
5 CONCRETE COATING M2 4.05
6 CONCRETE SPLASH BLOCK EA 2.00
7 WINDOWS
- 2.7 x 1.15 ALUMINUM FIXED GLASS PANEL
- POWDER COATED EA 3.00
WITH TINTED TEMPERED GLASS
- 1.6 x 1.15 ALUMINUM FIXED GLASS PANEL
EA 1.00
WITH TINTED TEMPERED GLASS
GUARD'S TOILET
1 PORTABLE PRE-FABRICATED BUILDING - WITH 1 HR FIRE RATED EXTERNAL WALL M2 4.16
2 CONCRETE M3 2.17
3 REINFORCEMENT KG 260.28
4 FORMWORKS M2 6.47
5 CONCRETE COATING M2 4.05
6 CONCRETE SPLASH BLOCK EA 1.00
7 WINDOWS
- 0.6 x 0.5 ALUMINUM BOTTOM HINGED WITH
- POWDER COATED EA 1.00
TINTED TEMPERED GLASS
III. LANDSCAPING
1 EXCAVATION M3 540.98
2 SUB GRADE PREPARATION M2 1081.96
3 IRRIGATION LINE - INCLUDING CONNECTION TO THE EXISTING M2 1081.96
4 PLANTING SOIL M3 540.98
5 GRAVEL SURFACING M2 16902.60
6 INTERLOCKING PAVERS M2 1780.19
7 GRASS M2 3282.00
A. BUILDING 120-121
I. EXECUTIVE ROOMS
V. KITCHEN
B. BUILDING 122-123
I. GRADE (3-10) - SLEEPING UNIT
III. KITCHEN
TOTAL
RESIDENTIAL & INDUSTRIAL COPLEX - KHURAIS ARAB LIGHT CRUDE
REQ. NO. 3000548899 Rev: 0 INCREMENT PROJECT
I Electrical
Supply and Install of the following major Electrical
I.1 Equipment
1000KVA, 13.8kV - 400/230V, 3PH, 4W, 60 Hz, PAD MOUNTED
TRANSFORMERS w/ 5.5% IMPEDANCE EA 4
750KVA, 13.8kV - 400/230V, 3PH, 4W, 60 Hz, PAD MOUNTED
TRANSFORMERS w/ 5.5% IMPEDANCE EA 2
500KVA, 13.8kV - 400/230V, 3PH, 4W, 60 Hz, PAD MOUNTED
TRANSFORMERS w/ 5.5% IMPEDANCE EA 2
112.5KVA, 400V - 480V, 3PH, 3W, 60 Hz, DRY TYPE
TRANSFORMER EA 2
2000AF/1800AT, 400/230V, 3PH, 4W, 60 Hz, LOW VOLTAGE
INDOOR SWITCHGEARS EA 4
1600AF/1400AT, 400/230V, 3PH, 4W, 60 Hz, LOW VOLTAGE
INDOOR SWITCHGEARS EA 2
1000AF/900AT, 400/230V, 3PH, 4W, 60 Hz, LOW VOLTAGE
INDOOR SWITCHGEARS EA 2
300AF/300AT, 400/230V, 3PH, 4W, 60 Hz, LOW VOLTAGE
MAIN DISTRIBUTION BOARDS EA 2
250AF/250AT, 400/230V, 3PH, 4W, 60 Hz, LOW VOLTAGE
MAIN DISTRIBUTION BOARDS EA 12
200AF/200AT, 400/230V, 3PH, 4W, 60 Hz, LOW VOLTAGE
MAIN DISTRIBUTION BOARDS EA 8
150AF/1500AT, 400/230V, 3PH, 4W, 60 Hz, LOW VOLTAGE
MAIN DISTRIBUTION BOARDS EA 12
100AF/100AT, 400/230V, 3PH, 4W, 60 Hz, LOW VOLTAGE
MAIN DISTRIBUTION BOARDS EA 2
200AF/175AT, 400/230V, 3PH, 3W, 60 Hz, LOW VOLTAGE
MAIN DISTRIBUTION BOARDS EA 2
100AF/100AT, 400/230V, 3PH, 4W, 60 Hz, LOW VOLTAGE
INDOOR PANELBOARDS EA 191
Supply and install RGS Conduit, PVC coated, aboveground,
including, but not limited to: couplings, unions, bodies,
sealing fittings, sealing compound, hubs, deck penetrations,
I.2 cutting, clamping, fittings and supports.
QC INSPECTOR 0 0 0 0 0 0
HSE 0 0 0 0 0 0
BUS 0 0 0 0 0 0
CABINS 0 0 0 0 0 0
Feb Mar April May Jun Jul Aug Sep Oct Nov Dec Jan
212 243 273 304 334 365 396 426 457 487 518 549
2 3 4 5 6 7 7 8 8 9 9 10
10 10 14 14 16 22 22 28 30 34 38 38
8 12 14 18 20 22 24 30 30 34 34 30
6 10 12 14 16 20 20 16 12 10 10 8
32 50 66 78 88 104 106 122 126 150 154 166
4 4 8 8 8 8 8 8 8 8 8
4 4 4 6 6 6 6 6 6 6 14 14
2 2 4 8 8 12
1 1 1 1 2 2 3 4
4 4 8 8 8 12 12 12 12 16 16 16
6 6 8 8 8 8 8 12 12 12 18
8 10 12 18 22
8 8 12
4 4 8 8 12 12 10 10 8 8 2 2
8 12 12 12 26 26
5 6 8 7 5 5 4 4 4 4 4 4
75 113 148 174 194 227 238 275 284 333 364 390
3 5 6 6 7 8 9 10 11 13 13 14
2 3 3 4 4 5 5 6 6 7 8 8
2 3 3 4 4 5 5 6 6 7 8 8
7 10 13 15 17 19 20 23 24 28 31 33
14 14 20 20 23 31 31 40 42 48 54 54
12 17 20 26 28 31 34 42 42 48 48 42
9 14 17 20 23 28 28 23 17 14 14 12
MONTH OF CONSTRUCTION
19 20 21 22 23 24 25 26 27 28 29
Feb Mar April May Jun Jul Aug Sep Oct Nov Dec
577 608 638 669 699 730 761 791 822 852 883
10 10 9 8 7 6 4
36 36 30 26 20 18 12
28 26 24 24 18 18 16
8 8 8 8 8 6 2
162 157 141 131 106 94 66
8 8 4 4 4 2 2
14 18 20 22 20 16 12
12 9 9 9 4 4 2
4 3 3 3 2 2 2
16 16 16 12 10 10 8
18 18 18 18 12 12 8
8 8
22 22 18 16 12 8 8
12 12 12 12 8 6 6
2 2 2 2 2 2 2
32 32 26 26 24 20 16
4 4 4 4 4 4 4
14 14 13 13 12 11 9
8 8 7 7 6 5 4
8 8 7 7 6 5 4
33 32 29 28 23 20 15
51 51 42 37 28 26 17
40 37 34 34 26 26 23
12 12 12 12 12 9 3
30 31 32 33 34 m-month m-days m-hours
peak 1,144,395
14
33
ETE
-327618
equipment 13,338,700.00
total 64,117,766.00
Aug Sep Oct Nov Dec Jan Feb
SN EQUIPMENT CALCULA 1 2 3 4 5 6 7
TED MH
1 Exacavator 3,854.06 2
2 Rock Breaker 444.17 1
3 Wheel Loader 9,647.49 2
5 Soil Compactor 2,661.76
8 Dump Trucks-22m3 capacity 7,696.17 2
10 10 Tons Roller Compactor 2,747.20
11 Dual Drum Compactor 317.70
12 Pneumatic Tire Asphalt Compactor 595.68
13 Grader 1,240.37
14 Asphalt Paver 595.68
15 Hydraulic Crane-50 to 150 ton 11,490.56 2
15 Tower Crane 4,465.73
16 Man Lift 5,954.86
16 Water Tankers 1,608.29 1
17 Trailers Flat Bed 7,958.39 1
61,278.11
18 Dyna Trucks 1
19 Bus 2
20 Coasters 1
21 SUV 2
22 Pick Ups 4x4 1
23 Pick ups 1
24 Ambulance 1
25 Diesel/Petrol Tanker 1
- - - - - - 21
14 OPERATORS 14 - - - - - - 7
5 HEAVY DRIVERS 5 - - - - - - 4
24 LIGHT DRIVERS 24 - - - - - - 10
CONSTRUCTION EQUIPMENT
Mar April May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar April May Jun
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
3 4 4 3 3 2 2 2 2 2 2 2 2 2 2 1
1 2 2 1 1 1
3 4 4 3 3 2 2 2 2 2 2 2 2 2 2 1
1 1 2 2 1 1 1
2 3 3 2 2 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1
1
2 2 2 3 3 3 3 3 3 3 3 2 2 2 2 2
1 1 1 2 2 2 2 2 2 2
1 1 1 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 1
1 2 2 2 2 2 2 3 3 3 3 3 3 3 3 2
3 3 4 4 5 5 6 6 7 8 8 8 8 7 7 6
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 3 3 3 3 3 3 3 3 3 3 2 2
2 2 2 3 3 3 4 4 5 5 5 5 5 5 5 4
1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
25 32 33 32 35 32 34 34 36 38 39 38 38 37 36 34
9 14 14 13 13 10 9 8 8 8 9 8 8 8 8 10
4 5 5 4 4 4 4 4 4 4 4 4 4 4 4 3
12 13 14 15 18 18 20 21 23 24 24 24 24 23 22 19
Jul Aug Sep Oct Nov Dec Jan Feb Mar April May
24 25 26 27 28 29 30 31 32 33 34 E-MONTH E-HOUR
1 41 10,660
9 2,340
1 1 42 10,920
1 10 2,600
1 1 27 7,020
1 8 2,080
1 2 520
1 1 260
1 260
1 1 260
2 2 46 11,960
1 1 19 4,940
1 1 17 4,420
1 1 19 4,940
1 1 29 7,540
70,720
2 2 44 11,440
5 4 106 27,560
1 1 19 4,940
2 2 48 12,480
4 3 70 18,200
2 1 32 8,320
1 1 19 4,940
1 1 19 4,940
32 23 - - -
10 4 - - - - - - - - -
3 3 - - - - - - - - -
18 15 - - - - - - - - -
Rate/Mo Cost
avg per hr daily monthly
26400 1,082,400.00 (6,805.94) 88 880 26400 (6,806)
26400 237,600.00 (1,895.83) 88 880 26400 (1,896)
25500 1,071,000.00 (1,272.51) 85 850 25500 (1,273)
18000 180,000.00 61.76 60 600 18000 62
19500 526,500.00 676.17 65 650 19500 676
20400 163,200.00 667.20 68 680 20400 667
22500 45,000.00 (202.30) 75 750 22500 (202)
22500 22,500.00 335.68 75 750 22500 336
33000 33,000.00 980.37 110 1100 33000 980
36000 36,000.00 335.68 120 1200 36000 336
72000 3,312,000.00 (469.44) 240 2400 72000 (469)
125000 2,375,000.00 (474.27) 550 5500 165000 (474)
12500 212,500.00 1,534.86 75 750 22500 1,535
13500 256,500.00 (3,331.71) 45 450 13500 (3,332)
19500 565,500.00 418.39 65 650 19500 418
10,118,700.00 (9,441.89)
12000 528,000.00 (11,440.00)
14000 1,484,000.00 (27,560.00)
12000 228,000.00 (4,940.00)
6750 324,000.00 (12,480.00)
3750 262,500.00 (18,200.00)
2500 80,000.00 (8,320.00)
4500 85,500.00 (4,940.00)
12000 228,000.00 (4,940.00)
3,220,000.00
13,338,700.00
Aug
S
Description Peak MH Total MM Manday 1
No
MANAGEMENT
1 Project Manager 1 6500 25 750 1
2 Construction Manager 1 6500 25 750 1
3 QA Manager 1 6500 25 750 1
3 QC Manager 1 6500 25 750 1
4 HSE Manager 1 6500 25 750 1
5 Contracts Manager 1 6500 25 750 1
5 Safety Supervisors 1 4940 19 570
6 Safety Officers 11 41860 161 4830
6 HSE Coordiantors 1 4940 19 570
7 Nurse 3 12220 47 1410
8 QC Supervisors 1 4940 19 570
8 QC Inspectors 14 49660 191 5730
9 Batch Plant Inspector 1 4940 19 570
9 Quarry Inspector 1 4940 19 570
10 QMIS Clerk 4 14820 57 1710
11 Document Controllers 16 62400 240 7200 2
11 Site Engineer 5 18200 70 2100
12 Surveyor 3 10400 40 1200
12 Project Control Manager 1 6500 25 750 1
13 Planning Engineers 1 4940 19 570
14 Cost Engineer 1 4940 19 570
14 Qty Surveyor 1 4940 19 570
Procurement Manager 1 6500 25 750 1
15 Procurement Engineer 1 4940 19 570
16 Expediters 1 4940 19 570
17 Materials Engineer 1 4940 19 570
17 Materials Coordiantor 2 9880 38 1140
18 Warehouse & Yard Supervisors 1 4940 19 570
18 Administration Coordinators 2 9880 38 1140
19 HR Coordinators 2 9880 38 1140
20 Field Engineering Manager 1 6500 25 750 1
20 Field Engineers 1 4940 19 570
21 CAD Operators 2 9880 38 1140
21 Senior Secretary 1 6500 25 750 1
22 Secretary 2 13000 50 1500 2
23 Document Controller Clerk 1 6500 25 750 1
23 Clerk 1 6500 25 750 1
24 IT Specialist 1 6500 25 750 1
24 Equipment Supervisor 1 4940 19 570
25 Equipment Foremen 1 4940 19 570
26 Maintenance Supervisor 1 4940 19 570
28 CABINS 5
MANAGEMENT 5
SUPPORT 0
BUS 1
HSE 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
4 5 6 7 7 8 8 9 9 10 11
1 1 1 1 1 1 1 1 1 1 1
1 2 2 2 2 2 2 3 3 3 3
1 1 1 1 1 1 1 1 1 1 1
3 5 6 6 7 8 9 10 11 13 13
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 2 2 2 2 2 3 3 3 4 4
2 2 2 2 2 4 8 8 8 8 8 12 12 12 16 16
1 2 2 3 3 4 4 4 4 5 5
1 1 1 2 2 2 2 2 2 3 3
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
17 17 17 17 17 54 64 66 69 70 73 79 82 83 93 94
1 1 1 2 2 2 2 2 2 3 3
4 5 7 7 7 7 5 5 4 4 4
2 2 3 3 2 2 2 2 2 2 2
5 6 7 7 8 9 9 10 11 12 12
2 3 4 4 4 4 4 4 4 4 4
2 3 4 4 4 4 4 4 4 4 4
2 3 4 4 4 4 4 4 4 4 4
2 3 4 4 4 4 4 4 4 4 4
2 3 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 4 4 4 4 4
0 0 0 0 0 30 37 46 47 47 48 46 47 47 49 49
17 17 17 17 17 84 101 112 116 117 121 125 129 130 142 143
5 5 5 5 5 16 20 21 22 22 23 24 25 25 28 28
5 5 5 5 5 14 16 17 18 18 19 20 21 21 24 24
0 0 0 0 0 3 4 4 4 4 4 4 4 4 5 5
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 2 2 3 3 3 3 3 3 3 3 3
Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar April
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
11 11 11 10 10 9 8 7
1 1 1 1 1 1 1 1
3 3 3 3 3 3 2 2
1 1 1 1 1 1 1 1
14 14 14 13 13 12 11 9
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
4 4 4 4 4 3 3 3
16 16 16 16 16 12 12 12
5 5 5 5 4 4 3 2
3 3 3 3 2 2 2 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
95 95 95 93 91 84 80 75 0 0
3 3 3 3 2 2 2 1
5 4 4 4 4 5 5 2
2 2 2 2 2 2 2 2
12 12 12 12 11 10 9 8
4 4 4 4 4 4 4 2
4 4 4 4 4 4 4 2
4 4 4 4 4 4 4 2
4 4 4 4 4 4 4 2
4 4 4 4 4 4 4 2
2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2
4 4 4 4 4 4 4 4
50 49 49 49 47 47 46 31 0 0
28 28 28 28 27 25 24 22
24 24 24 24 23 21 20 19
5 5 5 5 4 4 4 3
1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3
ETE
May
34
0 22,706,450.00
0
4,550,260.00
0
INDIRECT MANPOWER COST 27,256,710.00
BREAK DOWN OF INDIRECT COST
2 Indirect Labor
5 Temporary Facilities
BID PRICE
GENERAL EXPENSES
HSE/SAFETY SIGNAGE/BOARD-UP 2,222,636
ICT 1,745,250
SAUDI ARAMCO CAMP - NO REQUIREMENT AS PER SC. B, ATT IV EX. I
SAUDI ARAMCO CATERING - NO REQUIREMENT AS PER SC. B, ATT IV EX. I
SAUDI ARAMCO SITE OFFICE - NO REQUIREMENT AS PER SC. B, ATT IV EX. I
SCAFFOLDING 3,600,000
OTHER COST/SAUDIZATION 6,855,420
YARD OPERATION 1,240,000
SECURITY 900,000
INDIRECT EQUIPMENT 1,610,000
18,173,306
ETE
22,706,450.00 22,706,450.00
4,550,260.00 4,550,260.00
66,500.00 66,500.00
76,000.00
78,000.00
10,000.00
48,800.00
212,800.00 212,800.00
2,070,000.00
194,400.00
207,000.00
966,000.00
220,500.00
3,657,900.00 3,657,900.00
585,000.00
1,642,125.00
5,829,120.00
8,056,245.00 8,056,245.00
33,750.00
236,250.00
948,420.00
3,473,400.00
4,691,820.00 4,691,820.00
18,173,305.71 18,173,305.71
16,723,269.61
47,868,426.81 62115280.7090131
176,788,570.90 27.08%
238,903,851.61
224,656,997.71
ARCHITECTURAL
ELECTRICAL
SITE DEVELOPMENT 22,376,952.70
PLUMBING
FIRE PROTECTION
COMMERCIAL STRATEGY DISCOUNTS
DISCOUNT 79,725,588.72
DISCOUNT 50,203,485.41
DISCOUNT 6,859,629.74
279,300.00
DISCOUNT 31,121,343.64
4,988,228.57
207,933,728.09
16,723,269.61
CONCRETE 2,471,712.15
2,773,255.86
FORMWORKS 596,067.62
ARCHITECTURAL 14,517,848.30
ELECTRICAL 16,818,737.44
PLUMBING 5,063,381.01