SEA HORSE MIDDLE EAST MARINE SERVICE LLC.

TOOL BOX MEETING RECORD SHEET

1. TOOL BOX MEETING RECORD SHEET


2.Name of 6.Time 0800 From: To:
3.Mercury 4.07/Aprl 5.
Vessel 0815
1. ITEMS DISCUSSED ( Tick the appropriate boxes)

HSES/SAFETY ALERTS JHA PTW COSWP DAILY WORK ACTIVITIES


DRAWINGS OTHERS

2. BRIEF DESCRIPTION OF THE BOXES THAT HAVE BEEN TICKE


Installing Back Box Strainer in Pump Room
3. PRESENT AT THE MEETING:
No Name Rank Signature No Name Rank Signature

Battam
Mr.Exson
Tech.

Battam
Mr.Hasdono
Tech.

Battam
Mr.Zacky
Tech.

P.H.Girsang 1/E

T.M.Simanjuntak 3/E

W.W.W.S.P.Fernando Oiler

P.Jeganathan Oiler

Mimin Carmin C/E

4.COMMENTS FROM INDIVIDUALS PRESENT:

5. HAZARDS/CONTROL AND RECOVERY MEASURES

A.HAZARDS IDENTIFIED B.CONTROL MEASURES C.RECOVERY MEASURES

As indicated in the RA FORM As indicated in the RA FORM


Fire Hazard Ventilation to be carried out though out Keep working area clean, tidy & no combustible materials arround

If work carried out in Enclosed area, surrounding air should be tested &
Explosion Ventilation to be carried out though out
ventilated

Flashback when using oxygen & acetylene Sufficient lighting Use flashback arrestors appropriately

Burn Injuries Cleaning of area & anti slip PPE Use proper PPE

Electric shock hazard Use of all approved equipments Transformer properly ethed & cable should be properly insulated.

SHSQ-C13-02 Rev.2 / 15.10.01


SEA HORSE MIDDLE EAST MARINE SERVICE LLC.

TOOL BOX MEETING RECORD SHEET

Door opening fully closed by fire blanket,


Sparks may enter into paint locker
Fire watchman standby at the door.

6.CONDUCTED BY(Name
SIGNATURE:
and Rank)

SHSQ-C13-02 Rev.2 / 15.10.01