PROCESS LOADSHEET FOR FLARE PACKAGE Job No. : 07001 4 of 12
(42-KZZ-791) Doc. No. : SGA-R-DS-40-055
1.0 GENERAL
This Process Data Sheet covers the minimum process requirements for the selection, design,
manufacture, inspection, testing, supply, installation and performance guarantee of Flare
Package at Singa Gas Development Project, Lematang Block, South Sumatra.
_______________________________________________________________________________________________________________
Rev 2
SINGA GAS
MEDCOENERGI
Oil&Gas
DEVELOPMENT PROJECT
PROCESS LOADSHEET FOR FLARE PACKAGE Job No. : 07001 5 of 12
(42-KZZ-791) Doc. No. : SGA-R-DS-40-055
Notes :
1. Case 1 : One of 31-PSV-701, 31-PSV-702, and 31-PSV-703 at Block Discharge case
with Total Flow at discharge PSV is 60 MMSCFD (taken as governing case
for minimum operating temperature)
Case 2 : Total Blowdown with one BDV at fire governing case and the remaining BDV
at adiabatic case
Case 3 : Maximum case at 31-PV-708 (taken as governing case for maximum gas
flowrate and maximum operating temperature)
Case 4 : Acid Gas to Flare KO drum from Accumulator (as 35-PV-720 opens due to
Gas Blow By at 35-LV-104).
_______________________________________________________________________________________________________________
Rev 2
SINGA GAS
MEDCOENERGI
Oil&Gas
DEVELOPMENT PROJECT
PROCESS LOADSHEET FOR FLARE PACKAGE Job No. : 07001 6 of 12
(42-KZZ-791) Doc. No. : SGA-R-DS-40-055
Case 5 : Permeate Gas to Flare KO drum from Membrane (taken as governing case for
maximum H2S and CO2 composition for Flare KO Drum Design), based on
the latest HMB from Licensor for HP CASE
_______________________________________________________________________________________________________________
Rev 2
SINGA GAS
MEDCOENERGI
Oil&Gas
DEVELOPMENT PROJECT
PROCESS LOADSHEET FOR FLARE PACKAGE Job No. : 07001 7 of 12
(42-KZZ-791) Doc. No. : SGA-R-DS-40-055
AIR TEMPERATURES
MIN. (ºF) MEAN (ºF) MAX. (ºF)
68 80 95
HUMIDITY
MINIMUM MEAN MAXIMUM
Relative Humidity 57% 83% 95%
RAINFALL
Average annual rainfall 3200 mm (126 inch)
Design storm intensity 150 mm/h (5.9 inch/h)
Design storm duration 2 hours
Rain is heavy and frequent. During rain at times wind blows with appreciable
horizontal component.
WIND CONDITION
Main wind direction North-West and South-East
Maximum velocity 12.1 m/s (27 miles/h)
Design velocity 25 m/s (55.9 miles/h)
Pressure wind 40 kg/m2
Design for wind load UBC-88
_______________________________________________________________________________________________________________
Rev 2
SINGA GAS
MEDCOENERGI
Oil&Gas
DEVELOPMENT PROJECT
PROCESS LOADSHEET FOR FLARE PACKAGE Job No. : 07001 8 of 12
(42-KZZ-791) Doc. No. : SGA-R-DS-40-055
1. The Flare Stack and accessories shall conform to API RP 521 and the API Manual on
Disposal of Refinery Wastes, Volume on Atmospheric Emissions, Chapter 15 – Flares,
unless specifically modified herein. The Flare Assembly shall be completed with all
auxiliary equipment and accessories required to operate satisfactorily.
2. Maximum tip velocity shall be 0.7 Mach for emergency flaring.
3. Maximum pressure drop for Flare Package component shown as below:
Note :
Case 1 : One of 31-PSV-701, 31-PSV-702, and 31-PSV-703 at Block Discharge case
with Total Flow at discharge PSV is 60 MMSCFD
Case 2 : Total Blowdown with one BDV at fire governing case and the remaining BDV
at adiabatic case (taken as governing case for maximum gas flowrate and
minimum operating temperature)
Case 3 : Maximum case at 31-PV-708 (taken as governing case for maximum
operating temperature)
Case 4 : Acid Gas to Flare KO drum from Accumulator (as 35-PV-720 opens due to
Gas Blow By at 35-LV-104).
Case 5 : Permeate Gas to Flare KO drum from Membrane (taken as governing case for
maximum H2S and CO2 composition for Flare KO Drum Design), based on
the latest HMB from Licensor for HP CASE
4. Main flare stack piping shall be Carbon Steel (CS) with NACE. Unless not specified the
corrosion allowance shall be included. Flare stack minimum design pressure shall be 150
psig at 150 oF.
5. Flare tip shall be SS304L and designed to guarantee that no ignition will occur at any
flow rate condition unless ignitions from the pilot flame. The heat radiation (without
_______________________________________________________________________________________________________________
Rev 2
SINGA GAS
MEDCOENERGI
Oil&Gas
DEVELOPMENT PROJECT
PROCESS LOADSHEET FOR FLARE PACKAGE Job No. : 07001 9 of 12
(42-KZZ-791) Doc. No. : SGA-R-DS-40-055
sunlight radiation) rose by flare tip shall be stated by Vendor for various distance. Flare
tip shall be design for smokeless type.
6. The following are the maximum allowable radiation intensity (including the solar
radiation) at various locations (refer to API 521)
a. Base of the flare stack : 3000 Btu/hr.ft2
b. Process area (100 meters from the base of flare stack) : 500 Btu/hr.ft2
7. Flare tip shall be designed to completely burn any hydrocarbon liquid droplets up to 600
microns in diameter.
8. Vendor to indicate the stack height required based on radiation and dispersion levels.
9. Vendor shall provide radiation contours/isopleths which defines flame emissivity values,
flame profiles and flame plume temperature profiles for all cases defined.
10. Vendor shall provide dispersion calculations for SO2 when the flame is on and for H2S
when the flame is off.
11. Vendor shall provide estimated equilibrium temperature along various sections of flare
stack structure. The calculations shall assume most unfavourable environmental
conditions.
12. Vendor shall indicate the noise levels at stack base and at various locations from stack.
Vendor to also furnish the distance from tip at maximum flaring condition with a noise
level of 95 dBA and 85 dBA.
13. Environmental conditions shall be referred to a maximum wind velocity.
_______________________________________________________________________________________________________________
Rev 2
SINGA GAS
MEDCOENERGI
Oil&Gas
DEVELOPMENT PROJECT
PROCESS LOADSHEET FOR FLARE PACKAGE Job No. : 07001 10 of 12
(42-KZZ-791) Doc. No. : SGA-R-DS-40-055
Metal
Mercury (Hg) 5 mg/Nm³
Arsenic (As) 8 mg/Nm³
Antimony (Sb) 8 mg/Nm³
Cadmium (Cd) 8 mg/Nm³
Zinc (Zn) 50 mg/Nm³
Lead (Pb) 12 mg/Nm³
Note :
1. Concentrations given for temperature and pressure of 25°C and 1 atm.
2. Quality standard according to Decree of the state Minister for Environment of
Republic Indonesia No. 13/1995 and 129/2003 concerning point emission levels
as per Engineering Design Basis (SGA-G-GL-00-001).
_______________________________________________________________________________________________________________
Rev 2
SINGA GAS
MEDCOENERGI
Oil&Gas
DEVELOPMENT PROJECT
PROCESS LOADSHEET FOR FLARE PACKAGE Job No. : 07001 10 of 12
(42-KZZ-791) Doc. No. : SGA-R-DS-40-055
Metal
Mercury (Hg) 5 mg/Nm³
Arsenic (As) 8 mg/Nm³
Antimony (Sb) 8 mg/Nm³
Cadmium (Cd) 8 mg/Nm³
Zinc (Zn) 50 mg/Nm³
Lead (Pb) 12 mg/Nm³
Note :
1. Concentrations given for temperature and pressure of 25°C and 1 atm.
2. Quality standard according to Decree of the state Minister for Environment of
Republic Indonesia No. 13/1995 and 129/2003 concerning point emission levels
as per Engineering Design Basis (SGA-G-GL-00-001).
_______________________________________________________________________________________________________________
Rev 2
SINGA GAS
MEDCOENERGI
Oil&Gas
DEVELOPMENT PROJECT
PROCESS LOADSHEET FOR FLARE PACKAGE Job No. : 07001 11 of 12
(42-KZZ-791) Doc. No. : SGA-R-DS-40-055
Maximum
Time of Analysis
No. Parameters Level Devices
Measurement Methods
µg/Nm3
3 NOx * 24 hrs 150 Saltzman Spectrophotometer
(Nitrogen Oxides) 1 year 100 NDIR
Methylene
Blue
8 Noise ** 55 dBA
Note :
1. Concentrations given for temperature and pressure of 25°C and 1 atm
2. Quality standard according to Government Regulation No. 41/1999 concerning point
emission levels.
3. Marked (*) are as per Government Regulation No 41/1999.
4. Marked (**) as per Lampiran I Keputusan Nomor: KEP-48/MENLH/11/1996 p791.