You are on page 1of 10

KOLEJ WIT IPOH

(TECHNORATI CONSULTANCY (M)SDN.BHD.)


NO.8,JALAN CHARLETON,
OFF JALAN TUN ABDUL RAZAK,
30100 IPOH,PERAK DARUL RIDZUAN.

WORK SHEET

EE-320-3 : 2012 THREE PHASE ELECTRICAL INSTALLATION &


PROGRAM’S CODE & NAME
MAINTENANCE

LEVEL L3

COMPETENCY UNIT NO. AND COCU 5 : THREE PHASE ELECTRICAL APPLIANCES


TITLE MAINTENANCE

1 IDENTIFY ELECTRICAL APPLIANCES MAINTENANCE


REQUIREMENT, SPECIFICATION AND MANUALS
WORK ACTIVITIES NO. AND 2 PREPARE THREE PHASE ELECTRICAL APPLIANCES
STATEMENT MAINTENANCE TOOLS, EQUIPMENT AND MATERIALS
3 CARRY OUT ELECTRICAL APPLIANCES INSPECTION
4 CARRY OUT ELECTRICAL APPLIANCES MAINTENANCE

Page : 1
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

TITLE: MAINTENANCE AND ELECTRICAL EQUIPMENT DAMAGE RESTORATION

PURPOSE: There are various electrical equipment used to facilitate the work of
home. This includes an electric kettle, electric rice cooker, electric iron and
etc.
Page : 2
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

INSTRUCTIONS :

You are required to find the damage and repair the damage to the iron.

DRAWING, DATA AND TABLES :


Page : 3
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

EQUIPMENT / EQUIPMENT / MATERIAL:

1. Automatic iron
2. Meter testing
3. Test pen and hand tools
4. Schedule overhaul
5. Spare parts
Page : 4
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis
Page : 5
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

WORK STEPS DETAILS OF WORK


Page : 6
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

1. Identified damage a) Make sure the inspections and damage to the iron automatically.
b) Check with observation (visual inspection)
c) List the causes of damage to the notes for reference .

a) Test at the source of supply of the main switch, MCB and elcb
2. Create a test on b) Use a multimeter (Ohm Meter) to test the component - component
supplies and equipment of iron.
c) Test the circuit diagram based on iron .
d) Use Ohm Megger insulation tester to test the sterika . decision
not less than 0.5 Take readings and results in penel megger
meter.

Type of damage Type of damage Type of damage


It may damage
3.Refer to the flowchart
overhaul
Page : 7
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

CHECKLIST

Not
No. Level of Achievement Accepted Remark
Accepted
Page : 8
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

WORK

a. Have security features


PERALATAN, KELENGKAPAN & BAHAN-BAHAN :
b. Compliance with safety procedures.
1. Kertas
c. Finished drawings, checklists and audit
2. Peralatan menulis
reports.

WORK PROCESS

a. Methods / use of proper equipment

b. Follow the correct procedures.

c. Period of the time to complete the task.

ATTITUDE
a. Cooperation in groups

b. Responsibility

c. Timely

SAFETYNESS

a. Proper work methods

b. Clean the workplace

c. Adhere to safety procedures.


Page : 9
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

_ ________________
__________________

( SIGNATURE OF CANDIDATE ) ( SIGNATURE OF PP )


Page : 10
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

DATE DATE

You might also like