You are on page 1of 3

ANNEX 1 - PREREQUISITE PROGRAM / PREVENTIVE CONTROLS MATRIX FREQUENCY

FOOD SAFETY TEAM (FST)


PREREQUISITE PAS 220 ROUTINE FREQUENCY OF ROUTINE EVALUATION & ANALYSIS OF
DESCRIPTION PREVENTIVE CONTROLS RESPONSIBILITY RECORDS Quarterly
PROGRAM REQUIREMENTS VERIFICATION VERIFICATION INDIVIDUAL VERIFICATION
RESULTS

Requirements for personal


hygiene and behaviors, and
facility condition proportional to
• All employees are responsible for
the hazard posed to the process 4.1, 4.3, 5.3, 5.7, 10.2,
following GMP requirements Operations Managers
area or products shall be 10.3, 10.4, 12.2, 12.3 12.4, FST review of re-occurring issues or issues
GMP The cGMP Program • Cross-functional group of trained GMP Audit reports Packaging Managers Monthly occurring in multiple departments
Quarterly
established and documented. 13.1, 13.2, 13.3, 13.5, 13.6,
managers and team members Warehouse Managers
All personnel, visitors and 13.7, 13.8
perform periodic GMP audits
contractors shall be required to
comply with the documented
requirements.

The maintenance program shall


include all devices used to
monitor or control food safety
hazards, follow GMPs and
ensure good condition of facility 4.1, 4.3,6.2, 6.4, 7.4, 8.2, PM records Reports by Maintenance Manager to FST of
Maintenance Program issues affecting food safety
Maintenance/PM and equipment and sanitation 8.3, 8.6, 10.2, 10.3, 10.4, Maintenance Department Sanitation hand-off records Maintenance Manager Weekly Quarterly
Preventive Maintenance (PM) Program FST review of re-occurring food safety issues
hand-off of maintained 12.3, 12.4 , 13.4, 18.2 Work Order records or issues occurring in multiple departments
equipment.
PMs building & roof
maintenance & inspections; air
handling; docks

Program to randomly collect


1)Micro Lab - Quality
and analyze environmental 1) Micro. Lab Certificates of
Technologists 1) Micro. Lab - upon receipt of report
samples for microbiological Analysis, FST review of reports/findings for trends or
Environmental Monitoring Program 4.1, 6.4, 7.4, 10.2, 11.5 Environmental Testing Procedure Quality Department 2) Results Log - Quality 2) Results Log - all positive results - on reoccurring events
Quarterly
organisms (both pathogenic and 2) Environmental Results Report
Management receipt
indicator organisms like APC, (electronic action log)
Y&M and Coliform)
• Pest Control Records
• Fumigation Records
Program to control and Pest Control Service Log
12.1, 12.2, 12.3, 12.4, 12.5, Subcontract or on-staff PCO • Raw Material Receiving Record Sanitation Manager Subcontract PCO - Weekly FST review of trending reports and structural
Pest Control Program eradicate pests in and around Insect Susceptible Product Inspection Annually
12.6, 4.1, 5.6, 5.7 Receiving/Distribution Mgmt. • Insect Susceptible Inventory Logistics Manager ISIR - Monthly items noted
the building Program
Report (ISIR)
• Hold Log

Vendor Evaluations:
Maintain weed, tree, shrub and
Facilities Management Landscaping Landscaping Vendor evaluations Quality Manager Vendor Evaluation: Annual FST review of issues that may affect food
Landscaping grass control to prevent pest 4.1, 4.3, 12.2, 12.3, 12.4 Landscaping Contract Annual
Dept. or Company Chemical Use records Chemical use records: Chemical Use: Monthly with invoice safety
harborage
Sanitation Manager

Review of air permits


Review hazardous waste Local Environment Risk Assessment
Local Environment 4.2 Food Safety Team (FST) Leader FST evaluation notes FST Review Annual FST Review Annual
permits in area Program
Review of "Google Earth"

FST evaluation notes,


Address the hazard to products • All employees are responsible for
• Facility Access Controls Vulnerability assessment,
posed by potential acts of maintaining plant security. FST review of security program, drills,
4.1, 4.2, 4.3, 5.1, 5.5, 5.7, • IS Security Procedures Mock security drill records,
sabotage, vandalism or • Security Program: FST Leader FST Review vulnerability assessment - annual
Security 6.3, 6.5, 7.3, 8.6, 11.2, • cGMP Program GMP audit reports FST Review Annually
terrorism by putting in place • Cross-functional group of Manager Review
12.2, 16.2, 18.1, 18.2 • Key Control Program • Door access database
proportional protective managers perform GMP audits GMP review - monthly
Visiter & Subcontractor Control Policy Door key list
measures. • Maintenance - keys
IS user records

Internal layouts shall be


designed, constructed and
maintained to facilitate good Operation Manager
hygiene and manufacturing Packaging Manager
Floor Plan Review Program Maintenance Manager Monthly (or as
practices. The movement Floor plan review records Warehouse Manager
Layout Premises/Floor Plans 5.1, 5.2, 10.2, 10.4 cGMP Program All Department Managers Semi-annually FST review for suitability and changes incidents of high risk
patterns of materials, products Risk assessment spreadsheets Quality Manager occur)
Change Management/ Risk Assessment
and people, and layout of Food Safety Manager
Policy
equipment, shall be designed to
protect against potential
contamination sources.

A. Quality Management
A. Allergen Swab Test Results: B. & C.: Operations
Quality Management Electronic Management
Operations Management B. Operations Production Records C. Operations A. Monthly
Allergen Control Program
Program to control unintended Logistics Management C. Pre-Operation Checklist for All Management. B.- E. Weekly
5.1, 5.2, 9.3, 10.1, 10.3, Allergen Change-Over Matrices FST review of reports/findings for trends or
Allergen Control allergen cross contact with Regulatory Department Operations Departments D. & F. Per incident reoccurring events
Quarterly
11.5, 14.1, 14.2, 14.3 cGMP Program
product Sanitation Management D. Receiving Records: Bill of Lading E.:Logistics Management
Sanitation Program
E. Poor trailer condition report F. Sanitation
F. Facilities & Equipment (i.e. ATP) Management
Sanitation Records
• Process Control for Receiving
Materials and products are
• Process Control for Shipping Warehouse Inspection records
stored in clean, dry, well
• cGMP Program GMP Audit reports
ventilated spaces protected 5.7, 9.3, 12.2, 12.3, 12.4, Inspection Records - Monthly FST review of the inspection results for
Warehouse • Sales Order Shipment Processing Logistics Inventory Condition reports Logistics Management incidents and trends.
Semi-annually
from dust, condensation, fumes 16.2, GMP - Monthly
• Warehouse Sanitation Program •
odors or other sources of
Inventory Control Program
contamination.

Chemicals used for production,


Sanitation Records/inventory
maintenance, cleaning and Sanitation Sanitation Manager
Maintenance Chemical Records Sanitation - every two weeks
facility operation are controlled 5.7, 6.3, 6.5, 8.6, 9.3, 11.2, Maintenance Flavors Management FST Review of any trends or issues that would
Chemical Control Chemical Control Procedure Flavors: Batch Tickets/Inventory Flavor batch records - daily increase risk of a food safety nature
Semi-annually
to avoid the risk of the 12.2, 12.6, 16.2, 18.1, 18.2 Flavors Maintenance Manager
Chemical Receiving & Inventory Maintenance - monthly
contamination of food products Food Safety Team FST Leader
Records
and food contact surfaces.

Addresses the handling and


processing and breakage • Essential Glass, Brittle Plastic and
Inventory records - FST
protocol of glass, brittle plastic, Ceramics Handling and Breakage Policy Operations Management Essential Glass, Brittle Plastic, and
Leader FST Review of any trends or issues that would
Glass & Brittle Plastic Control ceramics and other shatter type 6.6, 8.5, 10.4 Logistics Management Ceramics Inventory List Monthly Quarterly
GMP- Department increase risk of a food safety nature
materials to avoid the risk of Quality Management GMP Audit Records
Managers
contamination and the related • cGMP Program
food safety issues.

Policy ensures the safe and


responsible handling of blades
and knives. It also helps to Knife Control Policy Operations Department Managers Operations Management
Knife Check In/Out Records
Knife Control ensure a safe and wholesome 8.5, 10.4 Allergen Change-Over Matrices Logistics Department Managers Monthly FST review for suitability and changes Quarterly
product is produced and limits Allergen Control Program Quality Department Logistics Management
the possibility of extraneous
material in finished products.

• Waste Management Program


• Color Coding Policy • Hazardous Waste Inventory &
All employees are responsible to
Addresses requirements for • Waste Hauler Contract Destruction Records • Department • Weekly
follow waste management
Management of Waste Program segregation, storage and 5.5, 7.1, 7.2, 7.3 • Drain Design plans – for capacity and • Records of Destruction • Management • Records of Destruction - as generated FST review for suitability and changes Annually
requirements
removal of waste. direction GMP Audit Records • Sanitation Management by subcontract hauler
Food Safety Team Leader
• Drain location maps • Risk Assessment Records
• cGMP Program

• All employees are responsible to • Vendor Evaluation Form


purchase from approved suppliers • Service Vendor Review Form
• Department are responsible to •Purchase Order (paper or Vendor Evaluations:
This program ensures that • Vendor Selection, Classification and
approve and evaluate the electronic) Dept. Managers and
materials which impact food Requirements Program
performance of their suppliers; and •Purchase Requisitions Purchasing (quarterly)
safety are purchased from • Vendor Evaluation/Audit Program
outsourced process providers. •Vendor Information Packet
approved suppliers based on an • Vendor Information Mgmt. Program Vendor Evaluations - quarterly
Management of Purchased Materials • Purchasing is responsible for •Vendor-Item Approval Records PO: Buyer, upon placing FST review of vendor issues that may impact
established selection & 9.1, 9.2, 9.3 • Vendor/Item Approval Program food safety
Quarterly
& Services maintaining records; approving raw •Proof of Insurance Certificate order, electronic signature
management of suppliers • Purchasing Requisition Program PO/PR upon placing orders
material, ingredient suppliers and •Vendor Food Safety/Quality System
program. Incoming materials • Program for Inspection of Incoming and
packaging; and outsourced process Reviews Purchase Requisition:
are inspected to verify Outgoing Trailers
providers. •3rd Party Audit Reports Buyer, upon placing
conformance to requirements.
• Logistics employees are •Vendor Performance Evaluation order, electronic signature
responsible for inspecting incoming Form
and outgoing trailers.

• Master Sanitation Program with


• Master Sanitation Schedule for
Schedules •
Grinding/Spice Re-cleaning
Sanitation Program Grinding/Spice Re-
• Master Sanitation
cleaning Department
Schedule for Packaging
• Sanitation Program - Logistics
• Master Sanitation Schedule for
The systems and practices to Departments Review and sign-off of
Set-Up Department
maintain clean, sanitary 4.1, 5.3, 5.4, 5.6, 5.7, 10.2, • Sanitation Program - Blending sanitation records by As schedule is completed (weekly,
Department Managers •Master Sanitation for the Flavor
Cleaning & Sanitation utensils, food contact surfaces 10.3, 10.4, 11.2, 11.3, 11.5, Department Department Managers monthly, quarterly, semi-annually, FST review for suitability and changes Annually
Sanitation Management Production Department
& facilities for safe food 12.4, 16.2, 16.3 • Sanitation Program - Set-up and Sanitation annually)
•Master Sanitation Schedule for the
manufacturing Department Management
Blending Department
• Sanitation Program - Flavor Production
•Master Sanitation Schedule for the
• Sanitation Program - Packaging
Receiving Department
• Procedures for Cleaning & Sanitizing
•Master Sanitation Schedule for
of Processing and Packaging Equipment
Shipping Department
& Utensils

Training Programs to ensure


that all employees have the • Corporate-Level and Temporary Personnel training records • Internal Audits • Quarterly Management review
• Human Resources
Training knowledge and skills to produce ISO 22000, 6.2.1, 6.2.2 Employee Training Guidelines Corporate training records • Personnel Performance • Minimum of Annual Evaluations FST review for suitability and changes Quarterly
• Department Managers
a safe/ quality products that • Departmental Training Checklists Department training records Reviews
meet regulatory requirements
Product Specifications Product Control Plans
To ensure product meets Production Batch sheets Testing Records
Product Testing and Approval ISO 9001 Quality Department Quality Management Weekly FST review for suitability and changes Semi-annually
specifications Test Protocols and Methods Completed Batch Sheets
Nonconforming Product Control Certificates of Analysis

R&D Department
Routing & Approval System for
Food Safety Team Routing & Approval records
Communication of New or Revised
Operations Design Control Project Records
The systems in place to ensure Products
Change Management 8.2, 8.3, 10.3 Quality New Ingredient Reqts. Form Project Manager Upon completion FST review for suitability and changes Quarterly
food safety through changes Routing System for Communication of
Regulatory Finished Goods Reqts. Form
Approved Design Control Projects
Logistics Management of Change Record
Change Management Procedure
Purchasing

To ensure employees meet food


Defined Hiring Protocols
safety/quality competence HR - hiring records
Pre-employment drug screening &
Employee Services Programs requirements. ISO 22000, 6.2.1, 6.2.2 Human Resources Employee application & pre-hire (confidential) FST review of re-occurring issues or issues
background check program Upon hire Annually
(Hiring/Personnel Practices) To ensure employee practices PAS 13.5, 13.6 Department Managers evaluations (confidential) GMP - Department occurring in multiple departments
Illness reporting policy GMP Monthly
are consistent with GMP GMP Audit reports Managers
cGMP Program
requirements

Review of testing results


To ensure water used in product City Water Monitoring Results by Quality Manager
Quality Department Water testing records Quality - Upon completion
Water Quality Program and for clearing meets 6.2 Water Testing Program Review of Maintenance FST review for suitability and changes Quarterly
Maintenance Maintenance records Maintenance - Weekly
requirements Water Filtration & Treatment Program Records by Maintenance
Manager

All employees are responsible to


To control evidence of conformity follow records requirements
4, 5, 6, 7, 8, 9, 10, 11, 12, Creating and Controlling Food Safety &
to requirements and evidence of Assigned employees are responsible Records Retention and Disposition
Records effective operation of the food
13, 14, 15, 16, 17, 18 Quality System Documentation, Records Internal Audit Program All audits Review of audit results Annually
for verification of records Table Matrix
safety management system ISO 22000, ISO 9001 and Data
Assigned employees are responsible
for records storage and disposition

To ensure testing equipment is Maintenance


Calibration Procedure Calibration records (internal & Maintenance
Calibration calibrated to ensure accurate ISO 22000, 8.3 Quality Department. Upon completion FST review for suitability and changes Semi-annually
Lab Procedures external) Quality Department
test results R&D Labs

To ensure all products are Specification Development and Revision


Specification Control: ISO 22000,4.2.2, 5.6.1, R&D Referene individual
prepared to customer Procedure Routing & Product Specification Sheets • Regulatory Dept.
a) Finished Product 7.3-7.10, 8.2, 8.4, 8.5 Quality Department Upon Receipt FST review for suitability and changes PRP evaluation
specification and regulatory Approval System for Communication of Production Batch tickets • Quality Management requirement
b) Manufacturing ISO 9001, 7.2, 7.5 XX Food Safety Team
requirements New or Revised Products Routing/Approval System Records

Flavors Process Control


Set-Up Process Control Blending
To ensure processes are under Process Control Grinding Process
ISO 9001, Department Managers Referene individual PRP evaluation
Process Control Plans control to ensure safe/quality Control Receiving Process Control, Reference to PRP Matrix Reference to PRP Matrix Reference to PRP Matrix requirement
Quarterly
ISO 22000, 7.3.5.2 Department Supervisors
products Packaging Process Control Shipping
Process Control
Distribution Center Process Control

Program to track customer Customer Complaint Records


complaints, take appropriate Complaint Summary Form
ISO 22000, 5.5.1 Corrective Action, Preventive Action and Customer Service Department FST review of the complaints and incidents for
Customer Complaint Process actions and determine if a Completed Corrective & CA/PA Team Weekly trends.
ISO 9001, 5.2, 7.2, 8.2 Complaint Procedure & Protocol Quality Department
potential food safety issue has Preventative Action Forms (including
occurred root cause analysis)

You might also like