Inspection & Testing Requirements Scope:: Test and Inspection Per
Inspection & Testing Requirements Scope:: Test and Inspection Per
TEST AND INSPECTION PER: 01-SAMSS-035 & API Spec. 5L/ISO3183 & Specifications As Noted Below.
0020 X Raw Material Verification Per API 5L clause 8.3 Radiation levels Shall less than 100
Becquerel’s/gram".
0030 X Welding Procedure Specification / Procedure Qualification Per SAEP-352, Table 1 for Company approval
Records (including repair WPS/PQR)Approval
0050 X NDT Procedures and Personnel Verify valid personnel qualification and approved procedure.
0060 X X Manufacturing Procedure Qualification Test Per 01-SAMSS-035, All pipes shall be manufactured to PSL2
Requirements.
0020
0010
*** X X
In process inspection & test requirement
Heat Treatment
Specification Details / Notes:
Per 01-SAMSS-035
0020 X Cold Expansion Per 01-SAMSS-035, For SAW straight seam pipe and shall not
exceed 1.5% of the pipe circumference
0030 Chemical & Mechanical Requirements: Per 01-SAMSS-035,Company representative shall select the
product samples for chemical and mechanical testing. Testing
Frequency is per API 5L Table 18
0040 X X Chemical Composition, Heat and Product analysis Per 01-SAMSS-035 and API 5L. Extent of witnessing shall be
decided during the pre inspection meeting
0050 X X Mechanical Tests; Tensile, Fracture Toughness, Residual Stress, Per 01-SAMSS-035 and API Spec 5L/ ISO 3183, as applicable.
Hardness, Guided Bends, Extent of witnessing shall be decided during the pre inspection
meeting
0060 X X HIC Testing Per 01-SAMSS-035 Annex H (Only welded pipes ordered for
sour service) and IR010210. Not required for Seamless pipes
per SAES-L136
IR010700 Continued...
INSPECTION & TESTING REQUIREMENTS REVISION: 05/09/2011 CODE NUMBER: PAGE:
SAUDI ARAMCO FORM-175 REPLACES: 10/01/2009 IR010700 2 of 2
(1) VISUAL INSPECTION WITNESSING BY INSPECTOR (Note 1)
(2) CERTIFICATES / RECORDS TO BE CHECKED BY INSPECTOR
(3) CERTIFICATES / DATA TO BE PROVIDED BY VENDOR / SUPPLIER / MANUFACTURER
0090 X X Ultrasonic and Radiographic Testing Per 01-SAMSS-035 Annex E & K and API Spec 5L/ ISO3183
Annex E & K
0100 X X Pipe End NDE Per 01-SAMSS-035 and API Spec 5L/ ISO3183 Annex E & K.
Extent of witnessing shall be decided during the pre inspection
meeting
0030
0010
***
X
Final inspection & test requirements
Visual and Dimensional Inspection including Diameter, Wall
Specification Details / Notes:
Per 01-SAMSS-035 & API Spec 5L/ ISO 3183 See Note:3.
thickness, weight and length straightness Extent of witnessing shall be decided during the pre inspection
meeting
0030 X X Coating, Marking, API Monogram and shipment Per 01-SAMSS-035 and API 5L
0040 X X Product Material Test Certificate and Quality Data Dossier. Per 01-SAMSS-035
NOTES:
(1) May only be waived by the responsible Saudi Aramco, ASC, and AOC Inspection Offices.
(2) See form SA175 - 000003 for instructions on using this form.
(3) All pipes shall be visually examined and be free of defects..
End of IR010700