Adhunik Metaliks Ltd BUSINESS PROCESS AML/BP/DRI/001
(A member of
Liberty Steel Group) PRODUCTION OF DRI
Department : DRI PLANT Process : DRI Production
Page 1 of 5
Source of input Responsibility / Receivers of output
(Predecessor processes at Input Process / Activity Control doc./ checkpoint Output
providers) Interaction (Subsequent processes)
Kiln Solid hot metal from Kiln WI for Use of produced less then 50% metallic Product - DRI
Cooling Through cooler Shit in charge Testing of DRI & Char
B Iron, AML/DRI/OPN/WI/15 By Product - Char
Plant Water Reservoir, Water for cooling activity Aspect/Impact analysis
Utility department
Sample collection Cooling discharge point
Shift in charge QC Inspection as per Annexure 01, AML/QA/CHEM/WI/63
- OK Material for I-bin /
- OK Material
Product House for
Product - DRI &
Cooler A In process inspection F/DRI/QA/IPI/01 screening and separation
By Product - Char Inprocess - Reject Material
inspection and - Reject Material to RM
testing
Reject Work instruction for handling of non-conforming product, Charging for reprocessing
AML/QA/CHEM/WI/20, Revisiting of FMEA, Doc. No.
AML/DRI/FMEA/01
OK Corrective and preventive action AML/F/DRI/07
Page 2 of 5
Source of input Responsibility / Receivers of output
(Predecessor processes at Input Process / Activity Control doc./ checkpoint Output
providers) Interaction (Subsequent processes)
Yes
Data analysis as per the documented
Sustenance plan process __________
Dispatch as per plan to Target
Dispatch to internal / external Internal / External
Dispatch Plan SMS / External customer Achieved? DRI Head / PPC Daily Analysis report, Monthly Analysis Report Dispatched Product
customer Customer
Daily Dispatch report, Monthly Dispatch Report
CAPA No Action Plan Report
WHRB Operation C
Aspect/Impact analysis
-After Burning Chamber(ABC)
Clean gas At chimney WI for ESP operation AML/DRI/OPN/WI/10, WI
Temperature Variation .
ESP operation for ESP Shut down AML/DRI/OPN/WI/11, WI for STEAM to CPP
- WHRB temp variation. Steam
WHRB & Waste gas ESP Operation (in case of Power Failure) 12 Clean Gas to air
Plant operator Clean Gas
Pollution system
-Improper Cleaning & Cooling Waste Dust
PM Schedule F/DRI/MECH/05, F/DRI/E&I/02 Waste Dust - Sinter plant
of Silo
Waste Gas.
SMP for SILO & ESP SMP/13
Efficiency:- 1) Conversion cost (Rs/MT), 2) Reduction in specific energy consumption, 3) Reduction in specific consumptions of consumables, 4) Reduction in specific consumptions of raw material
Effectiveness:- 1) Compliance to DRI Plan, 2) Overall Equipment Effectiveness
Note: Targets as per Role and Objective document
Risk / Opportunity
Risk / Opportunity Description Existing Control Probability Severity Risk Score Action Plan KAM / Target date
Revision History
1 14-Apr-21 Reviewed and revised to make it more elaborated A.K MALLIK K.K PRADHAN K.K PRADHAN Ratan Jhankar Ray
0 1-Mar-21 Initial Preparation A.K MALLIK K.K PRADHAN K.K PRADHAN Ratan Jhankar Ray
Revision no. Revision no. / Date Description (Reason for Change) Prepared by Reviewed by Approved By (HOD) Issued by (MR)
Page 3 of 5
Risk Assessment Criteria Matrix for AML
Conseq
Insignificant Minor
1. Operational Efficiency
1. Confined Impacts impacted but not pervasive
Measure 1 2
Will be almost a routine feature
Almost every month/ quarter within the 5 > 90% 5 10
Certain
immediate next month
3.Adverse Publicity 3.Significant CEO involvement (or relevant 3. Significant impact on Shareholders
entity management group)
4.Impacts on Operational Capabilities 4. Serious reputation implication 4.Fundamental demise of key personnel
5.Requires intervention by relevant entity 5.Catastrophic business continuity
Management Group exposure
3 4 5
15 20 25
12 16 20
9 12 15
6 8 10
3 4 5
Consequence ( Quantitative)
Minor Moderate High Extreme
3 to 5 % of Revenue > 10% of Revenue
3 to 5 % of Cost > 10% of Cost
3 to 5% of PAT > 10% of PAT
3 to 5% of Total Assets > 10% of Total Assets
10 15 20 25
8 12 16 20
6 9 12 15
4 6 8 10
2 3 4 5