INVOICE SUMMARY

Project: Construction Supervision of Yabelo-Metagefersa-Shakiso Road Project Contract:3 Dermi-Kinticha-Shakiso


Invoice No.
Client: The Director General
Ethiopian Roads Authority Period from
P.O.Box 1770, Addis Ababa to

Consultant: Associated Engineering Consultants Bank :Commercial Bank Of Ethiopia Date


P.O.Box 41780 Addis Ababa Branch :Finfine
Tel. (011) 5530002-04, Fax (011) 5514589 Acc. No.:1000001814226 Project No.

Total Previous This Total


Description
Contract (Birr) Months (Birr) Invoice (Birr) To date (Birr)

Fees 17,877,559.00 3,054,998.85 461,527.00 3,516,525.85

Reimbursable ( Construction Period ) 10,910,800.00 3,150,640.00 185,655.00 3,336,295.00

Contingency (15%) 4,318,253.85

Total 33,106,612.85 6,205,638.85 647,182.00 6,852,820.85

VAT 15% 4,965,991.93 930,845.83 97,077.30 1,027,923.13

Overtime Payment 285,042.73 189,134.49 474,177.22

VAT 15% 42,756.41 28,370.17 71,126.58

Accommodation Paid By ERA as per the Request of the Contractor 2,412,800.00 527,000.00 2,939,800.00

VAT 15% 361,920.00 79,050.00 440,970.00

Accommodation Deducted From Contractor's IPC 0.00 0.00 0.00

Accommodation To be Deducted From Contractor's IPC 2,774,720.00 606,050.00 3,380,770.00

Total Due on This Invoice 38,072,604.78 13,013,723.82 2,173,863.96 11,806,817.78

Prepared by: Associated Engineering Consultants ………………………………………………………………..

Payment Checked by: Counterpart Engineer ………………………………………………………………………

Reviewed and Checked by: Senior / Lead Engineer ……………….……………………………………………


Approval Certified by: ERA Team Leader ………………………………………………………………….………

Approved by: ERA Director ( South Region ) ………………………………………………………………………


INV-DKS-11

October .01, 2021


October.31, 2021

November 18, 2021

S/71/NCB/RP/GOE/2012

Amount
Remaining (Birr)

15,112,762.94

7,886,865.00

4,318,253.85

27,317,881.79

4,097,682.27

31,415,564.06
INVOICE BREAKDOWN

Project: Construction Supervision of Yabelo-Metagefersa-Shakiso Road Project Contract:3 Dermi-Kinticha-Shakiso


Invoice No. INV-DKS-11
Client: The Director General
Ethiopian Roads Authority Period from October .01 2021
P.O.Box 1770, Addis Ababa to October.31 2021

Consultant: Associated Engineering Consultants Date November 18, 2021


P.O.Box 41780 Addis Ababa
Tel. (011) 5530002-04, 0911 505420

Contract Rate Contract Amount Preceding Months This Invoice Total to Date Amount Remaining
Description
Unit Amount (Birr) Qty Amount (Birr) Qty Amount (Birr) Qty Amount (Birr) Qty Amount (Birr) Qty Amount (Birr)
Fee ( Construction Period )
Resident Engineer Month 39,500.00 36 1,422,000.00 9.13 360,635.00 1.00 39,500.00 10.13 400,135.00 25.87 1,021,865.00
Assistant Resident Engineer Month 30,600.00 32 979,200.00 0.99 30,294.00 1.00 30,600.00 1.99 60,894.00 30.01 918,306.00
Senior Pavement / Material Engineer Month 34,000.00 33 1,122,000.00 6.84 232,560.00 1.00 34,000.00 7.84 266,560.00 25.16 855,440.00
Senior Structural Engineer Month 8,000.00 13 104,000.00 1.30 10,400.00 0.03 240.00 1.33 10,640.00 11.67 93,360.00
Senior Geotechnical Engineer Month 8,000.00 11 88,000.00 1.49 11,920.00 0.16 1,280.00 1.65 13,200.00 9.35 74,800.00
Senior Highway Engineer Month 8,000.00 11 88,000.00 2.62 20,960.00 0.23 1,840.00 2.85 22,800.00 8.15 65,200.00
Senior Quantity Surveyor Month 31,630.00 32 1,012,160.00 2.23 70,534.90 1.00 31,630.00 3.23 102,164.90 28.77 909,995.10
Senior Surveyor Month 28,467.00 36 1,024,812.00 8.78 249,940.26 1.00 28,467.00 9.78 278,407.26 26.22 746,404.74
Senior Claims Expert Month 8,000.00 11 88,000.00 0.50 4,000.00 - - 0.50 4,000.00 10.50 84,000.00
Senior Environmentalist Month 8,000.00 11 88,000.00 1.48 11,840.00 0.03 240.00 1.51 12,080.00 9.49 75,920.00
Senior Hydrologist/Hydraulic Engineer Month 8,000.00 11 88,000.00 2.55 20,400.00 0.16 1,280.00 2.71 21,680.00 8.29 66,320.00
Senior Road Safety & Safety Audits Specialist Month 8,000.00 9 72,000.00 0.13 1,040.00 - - 0.13 1,040.00 8.87 70,960.00
Right of Way Management Specialist Month 21,630.00 36 778,680.00 3.81 82,410.30 1.00 21,630.00 4.81 104,040.30 31.19 674,639.70
Gender Specialist Month 21,630.00 36 778,680.00 6.39 138,215.70 1.00 21,630.00 7.39 159,845.70 28.61 618,834.30
Pavement/Material Engineer Month 21,630.00 30 648,900.00 5.81 125,670.30 1.00 21,630.00 6.81 147,300.30 23.19 501,599.70
Highway Engineer Month 21,630.00 30 648,900.00 - 1.00 21,630.00 1.00 21,630.00 29.00 627,270.00
Structural Engineer Month 21,630.00 30 648,900.00 - 1.00 21,630.00 1.00 21,630.00 29.00 627,270.00
Quantity Surveyor Month 21,630.00 30 648,900.00 - - - - - 30.00 648,900.00
Surveyor-1 Month 21,630.00 30 648,900.00 7.36 159,196.80 1.00 21,630.00 8.36 180,826.80 21.64 468,073.20
Surveyor-2 Month 21,630.00 30 648,900.00 - 1.00 21,630.00 1.00 21,630.00 29.00 627,270.00
Claims Expert Month 21,630.00 30 648,900.00 - - - - - 30.00 648,900.00
Environmentalist Month 21,630.00 30 648,900.00 - - - - - 30.00 648,900.00
Laboratory Technician-1 Month 17,630.00 34 599,420.00 7.13 125,701.90 1.00 17,630.00 8.13 143,331.90 25.87 456,088.10
Laboratory Technician-2 Month 17,630.00 34 599,420.00 7.13 125,701.90 1.00 17,630.00 8.13 143,331.90 25.87 456,088.10
Material Inspector Month 17,630.00 34 599,420.00 5.81 102,430.30 1.00 17,630.00 6.81 120,060.30 27.19 479,359.70
Structural Inspector Month 17,630.00 32 564,160.00 6.00 105,780.00 1.00 17,630.00 7.00 123,410.00 25.00 440,750.00
Inspector Of Works-1 Month 17,630.00 34 599,420.00 3.44 60,647.20 1.00 17,630.00 4.44 78,277.20 29.56 521,142.80
Inspector Of Works-2 Month 17,630.00 34 599,420.00 3.44 60,647.20 1.00 17,630.00 4.44 78,277.20 29.56 521,142.80
Draftsperson Month 17,630.00 32 564,160.00 4.52 79,687.60 1.00 17,630.00 5.52 97,317.60 26.48 466,842.40
Secretary Month 17,630.00 36 634,680.00 6.39 112,655.70 1.00 17,630.00 7.39 130,285.70 28.61 504,394.30
Sub total 1 17,684,832.00 2,303,269.06 461,527.00 2,764,796.06 14,920,035.94
Contract Rate Contract Amount Preceding Months This Invoice Total to Date Amount Remaining
Description
Unit Amount (Birr) Qty Amount (Birr) Qty Amount (Birr) Qty Amount (Birr) Qty Amount (Birr) Qty Amount (Birr)
Reimbursable ( Construction Period )
Resident Engineer Day 600.00 1,080 648,000.00 251 150,600.00 31 18,600.00 282 169,200.00 798 478,800.00
Assistant Resident Engineer Day 450.00 960 432,000.00 29 13,050.00 31 13,950.00 60 27,000.00 900 405,000.00
Senior Pavement / Material Engineer Day 500.00 990 495,000.00 207 103,500.00 31 15,500.00 238 119,000.00 752 376,000.00

Senior Structural Engineer Day 300.00 390 117,000.00 - - - - - 390 117,000.00


Senior Geotechnical Engineer Day 300.00 330 99,000.00 4 1,200.00 - - 4 1,200.00 326 97,800.00
Senior Highway Engineer Day 300.00 330 99,000.00 10 3,000.00 - - 10 3,000.00 320 96,000.00
Senior Quantity Surveyor Day 450.00 960 432,000.00 68 30,600.00 31 13,950.00 99 44,550.00 861 387,450.00
Senior Surveyor Day 405.00 1,080 437,400.00 258 104,490.00 31 12,555.00 289 117,045.00 791 320,355.00
Senior Claims Expert Day 300.00 330 99,000.00 3 900.00 - - 3 900.00 327 98,100.00
Senior Environmentalist Day 300.00 330 99,000.00 4 1,200.00 - - 4 1,200.00 326 97,800.00
Senior Hydrologist/Hydraulic Engineer Day 300.00 330 99,000.00 10 3,000.00 - - 10 3,000.00 320 96,000.00
Senior Road Safety & Safety Audits Specialist Day 300.00 270 81,000.00 - - - - - 270 81,000.00
Right of Way Management Specialist Day 140.00 1,080 151,200.00 116 16,240.00 31 4,340.00 147 20,580.00 933 130,620.00
Gender Specialist Day 140.00 1,080 151,200.00 193 27,020.00 31 4,340.00 224 31,360.00 856 119,840.00
Pavement/Material Engineer Day 140.00 900 126,000.00 175 24,500.00 31 4,340.00 206 28,840.00 694 97,160.00
Highway Engineer Day 140.00 900 126,000.00 - 31 4,340.00 31 4,340.00 869 121,660.00
Structural Engineer Day 140.00 900 126,000.00 - 31 4,340.00 31 4,340.00 869 121,660.00
Quantity Surveyor Day 140.00 900 126,000.00 - - - - - 900 126,000.00
Surveyor-1 Day 140.00 900 126,000.00 223 31,220.00 31 4,340.00 254 35,560.00 646 90,440.00
Surveyor-2 Day 140.00 900 126,000.00 - 31 4,340.00 31 4,340.00 869 121,660.00
Claims Expert Day 140.00 900 126,000.00 - - - - - 900 126,000.00
Environmentalist Day 140.00 900 126,000.00 - - - - - 900 126,000.00
Laboratory Technician-1 Day 140.00 1,020 142,800.00 216 30,240.00 31 4,340.00 247 34,580.00 773 108,220.00
Laboratory Technician-2 Day 140.00 1,020 142,800.00 216 30,240.00 31 4,340.00 247 34,580.00 773 108,220.00
Material Inspector Day 140.00 1,020 142,800.00 175 24,500.00 31 4,340.00 206 28,840.00 814 113,960.00
Structural Inspector Day 140.00 960 134,400.00 181 25,340.00 31 4,340.00 212 29,680.00 748 104,720.00
Inspector Of Works-1 Day 140.00 1,020 142,800.00 105 14,700.00 31 4,340.00 136 19,040.00 884 123,760.00
Inspector Of Works-2 Day 140.00 1,020 142,800.00 105 14,700.00 31 4,340.00 136 19,040.00 884 123,760.00
Draftsperson Day 140.00 960 134,400.00 138 19,320.00 31 4,340.00 169 23,660.00 791 110,740.00
Secretary Day 140.00 1,080 151,200.00 193 27,020.00 31 4,340.00 224 31,360.00 856 119,840.00
Accommodation- Engineer's Key Staffs MM 30,000.00 36 1,080,000.00 19.17 575,100.00 - - 19.17 575,100.00 16.83 504,900.00
Accommodation- Engineer's Intermediate Staffs MM 24,000.00 42 1,008,000.00 6.35 152,400.00 - - 6.35 152,400.00 35.65 855,600.00
Accommodation -Engineer's Support Staffs MM 22,500.00 30 675,000.00 17.04 383,400.00 - - 17.04 383,400.00 12.96 291,600.00
Surveying Equipment For the Engineer's Staffs Month 85,000.00 6 510,000.00 2.35 199,750.00 - 2.35 199,750.00 3.65 310,250.00
Head office Support Month 19,000.00 36 684,000.00 9.55 181,450.00 1.00 19,000.00 10.55 200,450.00 25.45 483,550.00
Production Of Report Month 15,000.00 36 540,000.00 9.00 135,000.00 1.00 15,000.00 10.00 150,000.00 26.00 390,000.00
Communication Cost Month 12,000.00 36 432,000.00 9.55 114,600.00 1.00 12,000.00 10.55 126,600.00 25.45 305,400.00
Insurance cost LS 400,000.00 1 400,000.00 1 400,000.00 - 1.00 400,000.00 - -
Sub total 2 10,910,800.00 2,838,280.00 185,655.00 3,023,935.00 7,886,865.00
Contract Rate Contract Amount Preceding Months This Invoice Total to Date Amount Remaining
Description
Unit Amount (Birr) Qty Amount (Birr) Qty Amount (Birr) Qty Amount (Birr) Qty Amount (Birr) Qty Amount (Birr)
Fee (Defect liability Period )
Resident Engineer Month 39,500.00 2 79,000.00 - - - - 2 79,000.00
Senior Quantity Surveyor Month 31,630.00 1 31,630.00 - - - - 1 31,630.00
Senior Surveyor Month 28,467.00 1 28,467.00 - - - - 1 28,467.00

Senior Claims Expert Month 8,000.00 1 8,000.00 - - - - 1 8,000.00


Senior Environmentalist Month 8,000.00 1 8,000.00 - - - - 1 8,000.00
Senior Hydrologist/Hydraulic Engineer Month 8,000.00 1 8,000.00 - - - - 1 8,000.00
Senior Road Safety & Safety Audits Specialist Month 8,000.00 1 8,000.00 - - - - 1 8,000.00
Right of Way Management Specialist Month 21,630.00 1 21,630.00 - - - - 1 21,630.00
Sub total 3 192,727.00 0.00 0.00 0.00 192,727.00
Total 28,788,359.00 5,141,549.06 647,182.00 5,788,731.06 22,999,627.94

Prepared by: Associated Engineering Consultants ……………………………………………………


PERSONNEL ATTENDANCE RECORD

Project Construction Supervision of Yabelo-Metagefersa-Shakiso Road Project Contract:3 Dermi-Kinticha-Shakiso

Period from October .01 2021 INV-DKS-11


to October.31 2021 31 Date November 18, 2021

Days Total
Position Name 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 P T HL SL HQ
Resident Engineer Mulualem Ergogo Gadisso P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Assistant Resident Engineer Amare Merkebu P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Senior Pavement / Material Engineer Daniel Abreha Kahesay P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Senior Structural Engineer Abiyou Awoke Adgeh HQ - - - - 1
Senior Geotechnical Engineer Yared Bayou Gebreyes HQ HQ HQ HQ HQ - - - - 5
Senior Highway Engineer Ezra Mersha Sahele HQ HQ HQ HQ HQ HQ HQ - - - - 7
Senior Quantity Surveyor Salahadin Assefa Yimam P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Senior Surveyor Motuma Dereje Regassa P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Senior Claims Expert Ahmed Mohamedali Sherif - - - - -
Senior Environmentalist Arebo Sambi Gojam HQ - - - - 1
Senior Hydrologist/Hydraulic Engineer Bisrat Temesgen Mehari HQ HQ HQ HQ HQ - - - - 5
Senior Road Safety & Safety Audits SpeciaShimeles Tesfaye - - - - -
Right of Way Management Specialist Alelegn Assefa Haile P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Gender Specialist Daniel Tumiso Arkiso P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Pavement/Material Engineer Nebiyou Endrias Kifle P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Highway Engineer Israel Woldetsdik Agafari P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Structural Engineer Mohamed Abdo Teha P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Quantity Surveyor - - - - -
Surveyor-1 Nikodimod Fekede Demessie P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Surveyor-2 Bereket Asebir Abreha P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Claims Expert - - - - -
Environmentalist - - - - -
Laboratory Technician-1 Mifta Arebo Hassen P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Laboratory Technician-2 Esubalew Ayele Alemu P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Material Inspector Mesele Betru Tefera P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Structural Inspector Yemaneh A/mariyam Zeweldi P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Inspector Of Works-1 Daniel Muluneh Chaine P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Inspector Of Works-2 Tadiyos Legesse Arega P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Draftsperson Biruk Alemu Achomo P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -
Secretary Helina Wasihun Assefa P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 - - - -

Legend
P= Present on site
NP= Not present on site
HQ= At head quarter for project's work
HL= Holiday
PERSONNEL ATTENDANCE & SURVEING EQUIPMENT RECORD

Project Construction Supervision of Yabelo-Metagefersa-Shakiso Road Project Contract:3 Dermi-Kinticha-Shakiso


RATE
Period from October .01 2021 Accommodation- Engineer's Key Staffs 1,000.00
to October.31 2021 Accommodation- Engineer's Intermediate Staffs 800.00
Accommodation -Engineer's Support Staffs 750.00

Position Name Days Total


Calculation
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 P
Resident Engineer Mulualem Ergogo Gadisso P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 31,000.00
Assistant Resident Engineer P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 31,000.00
Senior Pavement / Material Engineer Daniel Abreha Kahesay P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 31,000.00
Senior Structural Engineer Abiyou Awoke Adgeh - -
Senior Geotechnical Engineer Yared Bayou Gebreyes - -
Senior Highway Engineer Ezra Mersha Sahele - -
Senior Quantity Surveyor Salahadin Assefa Yimam P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 31,000.00
Senior Surveyor Motuma Dereje Regassa P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 31,000.00
Senior Claims Expert Ahmed Mohamedali Sherif - -
Senior Environmentalist Arebo Sambi Gojam - -
Senior Hydrologist/Hydraulic Engineer Bisrat Temesgen Mehari - -
Senior Road Safety & Safety Audits SpeciShimeles Tesfaye - -
Right of Way Management Specialist Alelegn Assefa Haile P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 31,000.00
Gender Specialist Daniel Tumiso Arkiso P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 31,000.00
Pavement/Material Engineer Nebiyou Endrias Kifle P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 24,800.00
Highway Engineer Israel Woldetsdik Agafari P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 24,800.00
Structural Engineer Mohamed Abdo Teha P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 24,800.00
Quantity Surveyor - -
Surveyor-1 Nikodimod Fekede Demessie P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 24,800.00
Surveyor-2 Bereket Asebir Abreha P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 24,800.00
Claims Expert - -
Environmentalist - -
Laboratory Technician-1 Mifta Arebo Hassen P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 23,250.00
Laboratory Technician-2 Esubalew Ayele Alemu P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 23,250.00
Material Inspector Mesele Betru Tefera P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 23,250.00
Structural Inspector Yemaneh A/mariyam Zeweldi P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 23,250.00
Inspector Of Works-1 Daniel Muluneh Chaine P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 23,250.00
Inspector Of Works-2 Tadiyos Legesse Arega P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 23,250.00
Draftsperson Biruk Alemu Achomo P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 23,250.00
Secretary Helina Wasihun Assefa P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 31 23,250.00
TOTAL 527,000.00
For the Consultant : …………………………………………. For the Contractor : ………………………………………….
Jul-21
Project : Dermi Kinticha Shakisso Road Project

Hourly Rate
based on basic Regular Public
No. Name Title Salary Working Day Night Weekend Holiday Amount
1 Mulualem Ergogo Resident Engineer 170.45 50.00 30.00 - 20,880.13
2 Dereje Kurabachew Assistant Resident Engineer 136.36 50.00 30.00 - 16,704.10
3 Daniel Abreha Senior Pavement / Material Engineer 79.55 - - -
4 Salahadin Assefa Senior Quantity Surveyor 99.43 50.00 30.00 - 12,180.18
5 Motuma Dereje Senior Surveyor 99.43 50.00 30.00 - 12,180.18
6 Alelign Assefa Right of Way Management Specialist 59.66 50.00 30.00 - 7,308.35
7 Daniel Tumiso Gender Specialist 39.77 50.00 30.00 - 4,871.83
8 Nebiyu Endrias Pavement/Material Engineer 39.77 50.00 30.00 - 4,871.83
9 Israel W/tsadik Highway Engineer 37.10 50.00 30.00 - 4,544.75
10 Mohammod Abdo Structural Engineer 37.10 50.00 30.00 - 4,544.75
11 Quantity Surveyor - - - -
12 Nikodimos Fekede Surveyor-1 28.98 50.00 30.00 - 3,550.05
13 Surveyor-2 37.10 50.00 30.00 - 4,544.75
14 Claims Expert - - - -
15 Environmentalist - - - -
16 Mifta Arebo Laboratory Technician-1 28.98 - - -
17 Esubalew Ayele Laboratory Technician-2 28.98 50.00 30.00 - 3,550.05
18 Mesele Betru Material Inspector 28.98 50.00 30.00 - 3,550.05
19 Yemaneh A/Mariam Structural Inspector 37.07 50.00 30.00 - 4,541.08
20 Daniel Mulualem Inspector Of Works-1 28.98 50.00 30.00 - 3,550.05
21 Tadios Legesse Inspector Of Works-2 28.98 50.00 30.00 - 3,550.05
22 Biruck Alemu Draftsperson 28.98 50.00 30.00 - 3,550.05
23 Hilina Wasihun Secretary 28.98 50.00 30.00 - 3,550.05
Total OT 122,022.25
Overhead ( 40% ) 48,808.90
Profit ( 15% ) 18,303.34
Total 189,134.49
Project : Dermi Kinticha Shakisso Road Project

Hourly Rate
based on basic Regular Public
No. Name Title Salary Working Day Night Weekend Holiday Amount
1 Mulualem Ergogo Resident Engineer 170.45 -
2 Dereje Kurabachew Assistant Resident Engineer 142.05 -
3 Daniel Abreha Senior Pavement / Material Engineer 79.55 -
4 Salahadin Assefa Senior Quantity Surveyor 99.43 -
5 Motuma Dereje Senior Surveyor 99.43 -
6 Alelign Assefa Right of Way Management Specialist 59.66 -
7 Daniel Tumiso Gender Specialist 39.77 -
8 Nebiyu Endrias Pavement/Material Engineer 39.77 -
9 Highway Engineer - -
10 Structural Engineer - -
11 Quantity Surveyor - -
12 Nikodimos Fekede Surveyor-1 28.98 -
13 Surveyor-2 - -
14 Claims Expert - -
15 Environmentalist - -
16 Mifta Arebo Laboratory Technician-1 28.98 -
17 Esubalew Ayele Laboratory Technician-2 28.98 -
18 Mesele Betru Material Inspector 28.98 -
19 Yemaneh A/Mariam Structural Inspector 37.07 -
20 Daniel Mulualem Inspector Of Works-1 28.98 -
21 Tadios Legesse Inspector Of Works-2 28.98 -
22 Biruck Alemu Draftsperson 28.98 -
23 Hilina Wasihun Secretary 28.98 -
Total OT 0.00
Overhead ( 40% ) 0.00
Profit ( 15% ) 0.00
Total 0.00
Monthly Intermittent Staff Activity Report
Project: Dermi Kenticha Shakisso
Reporting Month: August 2021

Period
No. Position Description of Activities Carried out Office Site
Start Date End Date Start Date End Date

1 Structural Engineer

Comment on revised Geometric Design Drawing Km170+700-242+590- and Comment


2 Geotechnical Engineer on revised final quality assurance manual for design AEC/DKS/RE-192/21 & 24/Aug/21 26/Aug/21
AEC/DKS/RE-193/21

3/Aug/21 3/Aug/21
Peer meeting design team on overall commented & pending issues

3 Highway Engineer Era 2014 Ec Planning meeting 19/Aug/21 19/Aug/21

Comment on 6th drawing submission and Highway engineer peer to peer meeting on
23/Aug/21 26/Aug/21
Aug 25

4 Claim Expert

Review Final Environmental & Social Management Plane and Review on revised final
5 Environmentalist environmental & social Impact assessment (ESIA) report
26/Aug/21 31/Aug/21

Comment on draft Hydrology/Hydraulic Design Report Dermi-Km198+000 and review


6 Hydrologist revised final Hydrology/Hydraulic Design Report Km222-242 AEC/DKS/RE-184/21, 9/Aug/21 20/Aug/21 23/Aug/21 25/Aug/21
AEC/DKS/RE-185/21,

7 Road Safety