You are on page 1of 30

VIETNAMESE STANDARD

TCVN 5307 : 1991

PETROLEUM STORAGE AND PETROLEUM PRODUCTS

DESIGN STANDARD

Page 1 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

PETROLEUM STORAGES AND PETROLEUM PRODUCTS – DESIGN STANDARD

This standard applies to the new construction design, improving and expanding
construction for petroleum storages and petroleum products (hereafter called petrol
storage).
This standard not applies to design of:
1. Oil – Fat storages.
2. LPG storages.
3. Temporary petrol storages at maximum period of 5 years.
4. Storages constructed in cave and underwater.
5. Other tanks with storage process component.

1. General

1.1. Must design the workshop and storages in petrol storage (petrol pump
station, oil drum loading room, analyzer room…) conform to the current
design standards of industrial enterprise.

1.2. Must design the utility conform to the current utility design standards of
industrial enterprise

1.3. Base on flashpoint temperature, petrol is classified into 2 classes:


Class I: Petrol with maximum flashpoint temperature of 450C.
Class II: Petrol with flashpoint temperature higher than 450C.

1.4. Base on the functions petrol storage is classified into two groups:
Group I: Including business storages and national reserves.
Group II :Including customer storages
Note: Group I petrol storages, which maximum volume of 100m3 and 500m3 are
used for containing the class I petrol and class II petrol respectively, are allowed to
design as the group II storages. In case of containing both group I and II, it is
permitted to exchange: 1m3 of class I petrol equal to 5m3 of class II petrol.

1.5. The petrol tank, the petrol drum storage could be designed above/under
ground or semi-aboveground as following stipulation:
Aboveground: The bottom of a tank or the foundation of a storage equal or
higher the lowest designed altitude in surrounding.
Underground: The bottom of tank or the foundation of a storage lays
underground and highest petrol level of tanks or the petrol level pouring from
all broken petrol drums lower than 0.2m (Within limit of 3m from tank or
enclosed walls) comparing with the lowest designed altitude.

Page 2 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

The aboveground tanks is regarded as a underground tank when their roofs


are covered by 0.3 m of soils and the tank walls are surrounded by 3m of soil
at minimum (calculated from tank wall to the foot of soil dam).
Semi- aboveground: The tank or storage laid underground at a half of their
height and highest petrol level of tanks or the petrol level pouring from all
broken petrol drums not higher than 2m comparing with the lowest designed
altitude

1.6. The house and petrol storage are classifiedinto 5 levels as in table 1 based
on the fire danger.

Table 1

Fire danger specification Houses, constructions and


Level
In process equipments in petrol storages

Manufactues related to the Tanks, storages, drums, gas


maintenance, loading-filling concentrated tanks, loading-filling
activities, producing petrol with construction, jetty pump stations, petrol
A flashpoint temperature lower drum and small can loading house,
than 280C. wasted water pump station, petrol
loading ground for petrol flashpoint
temperature lower than 280C.
Manufactures related to As above constructions for petrol
maintenance, loading - filling, flashpoint temperature from 280C to
B 450C.
producing petrol with flashpoint
temperature from 280C to 450C.
Manufactures related to Tank, lubricating oil drum storage,
maintenance, loading - filling, loading-filling construction, wasted water
producing that use inflammable pump station, loading ground of
solids, materials and liquids lubricating oil with flashpoint
C that have flashpoint temperature higher 1200C, solid
temperature higher than 1200C. lubricating oil maintenance storage,
transformer station that each
transformer has flubricating oil of 60kg
at minimum, material storage
Manufactures related to the Boiler station, machinery room of
processing of fireproof generate power station, forge and
substances and materials at welding workshop, repairing workshop,
flashpoint and melt state with drum cover manufacture, transformer
D
exothermal or sparking station that each transformer has
phenomenons and the flubricating oil of 60kg at maximum
manufacture of flashpoint solid
liquid and gas materials,
Manufacture related to Mechanical workshop, tool workshop,
processing of fireproof water pump station, congealment
Đ
substances and materials at machine.
cold state.

Page 3 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

1.7. Houses and constructions of level A and B, firewater pump station, oil
recovered tank in drainage system, cleaning station for tank truck and
carriage and drum cleaning by steam, oil sample storage, house for truck
scale must have minimum fireproof level of II.

1.8. The design of petrol storage must conform to the Vietnam standards in force,
such as: Design and construction standards for industrial enterprise, fire
protection and fighting standards for houses and constructions, Health and
Environmental standards, water source protection…

2. Design requirements for group I storage

2.1. Total grounds

2.1.1. The group I petrol storages are classified into 3 grades beased on capacity
stipulation in table 2

Table 2

STORAGE GRADE TOTAL STORAGE CAPACITY (m3)


I >50.000
II From 50.000 to 10.000
III < 10.000
Note: Storage capacity is capacity of tanks and total capacity of drums.

2.1.2. Firefighting distance from houses and constructions in petrol storage (include
loading-filling construction) of fire-explosion danger to the houses and
constructions of enterprises, public constructions, residential areas and the
near constructions must conform to the stipulations in table 3.

Table 3

Distance calculated from house


Houses, constructions and subjects
and construction in petrol storage
required to determine the distance
follows the storage grade (m)
I II and III
1 2 3
1. Houses and constructions of near 100 40
enterprises
2. Forest 20 20
- Big leaf 100 50
- Needle, grass
3. Storages of wood, coal, cotton cloth, 100 50
hay, straws, strip coal mine
4. Public railway: 100 80
- Railway station 80 60
- Loading-filling platform and branch of 50 40
railway
- Main railway

Page 4 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

Distance calculated from house


Houses, constructions and subjects
and construction in petrol storage
required to determine the distance
follows the storage grade (m)
I II and III
1 2 3
5. Public road:
- Grade I, II and III 50 30
- Grade IV and V 30 20
6. House and public construction of 150 100
residential area (60 for Grade III)
7. Petrol station 30 30
8. Airport
- Inside the limit of take off 2000 1000
- Outside the limit of take off 1000 1000
(500 of Grade III)
9. Electrical pole According to According to
electrical design electrical design
stipulation stipulation
Note:
1. The above distance is calculated from the straight lines between outfaces of
structures, houses and wall fences of constructions. In case of road, it is
calculated to the edges of roads. For the railway loading-filling constructions, it
is calculated to the center of railway.
2. When storage arranged in the forest must chop down trees as item 2.

2.1.3. Must arrange the petrol storage area at the place of lower attitude comparing
with the attitude of residental area, enterprise and railway around. In case of
higher attitude and the distance as in table 3 but under 150 m, it is required
to have a method of damp up for prevention or build the oil drainage of
breakdown event.

2.1.4. In case of petrol storage arranged inside the dike of a river, the distance to
the foot of dike for grade I and II storages and grade III storage must be
100m and respectively.
If the river of no dike or the storage arranged outside the dike then must
choose the place of no erosion and far from the highest water level with
minimum distance of 60m. This applied to all levels of storage.

2.1.5. In case of petrol storage arranged inside the dike and at downstream of a
river, must arrange them far from the port, hydropower plant, potable water
production, shipbuilding workshop and ship repairing workshop with the
minimum distance of 100m.
For river of no dike or the storage arrange outside the dike, the minimum
distance from the storage to the constructions above is 200m.
In case of petrol storage inside the dike and at upstream river, the minimum
distance distance from the storage to the constructions above is 200m

Page 5 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

For river of no dike and the storage arranged outside the dike, the minimum
distance must be chosen as follows:
1. 2000 m for grade I storage
2. 1500 m for grade II storage
3. 1000 m for grade III storage
For constructions that were not mentioned above, the distance will be
reduced by 30%.

2.1.6. Fire protection distance from petrol storage to the houses and constructions
inside the petrol storage area must conform to the stipulations in table 4.
Table 4
(m)
Distance from the storage
Houses and constructions required to According to storage grade
No.
determine the distance
I II and III
1 Jetty 75 50
2 Railway load/unload construction 30 20
3 Tank truck filling house, pump station, 30 15
valve plain, wastewater pump station,
petrol drum filling house, drum
maintenance and empty drum ground.
4 House and construction using opened
flame:
- To the group I petrol storage 50 40
- To the group II petrol storage 30 20
5 Firewater pump station, tank, pond or lake 40 40
for firewater (to manhole or fire hydrant)
6 Waste water processing construction:
- Calm lake, vaporized pond 30 30
- Decantation lake, selecting-floating 30 30
tank, deposit tank have minimum
capacity of 400 m3
- Decantation lake, selecting-floating 15 15
tank, deposit tank have capacity from
100m3 to 400m3
- Decantation lake, selecting-floating 10 10
tank, deposit tank have maximum
capacity of 100m3
7 Other house and constructions of the 25 20
storage
8 Power transmission line in the air Equal 1.5 height of pole
Note:

Page 6 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

1. For underground tank, the mark No. 5, 6 in table 4 will be reduced 25%,
others can be reduced 50%.
2. The underground tank is allowed to put near the underground petrol pump
station at minimum distance of 1 m.
3. The petrol pump station is allowed to arrange near the petrol tank at minimum
distance of 3 m.
4. The petrol pump with explosion-proof motor is allowed to put direct in tank
area.
5. Because of special conditions and considering the specific terrain, with the
sensible reasons and having the agreement of the Fire Department the
distance in table 4 is reduced up to 15%.

2.1.7. Fire protection distance from railway loading-filling construction, jetty, truck-
loading station, petrol pump station, valve ground, petrol drum loading
house, waste water pump station, waste water processing construction
(poluted petrol) to open flame workshop as follows:
- 40m and upwards for the class I petrol;
- 30m and upwards for the class II petrol

2.1.8. Distance from houses and construction of the petrol storage to loading-filling
construction for railway, road, waterway (except tank):
- Minimum of 15 m for class I petrol
- Minimum of 10 m for class II petrol
Allow putting the pump station took up oil from floating storage on mooring
buoy or the surface of jetty and put on jetty.

2.1.9. Distance from houses and construction to waste water processing


construction (decantation lake, oil recovered tank) is not less than 20m; in
case of to other works of waste wate processing construction, the distance is
not less than 10m.

2.1.10. Allow putting the drum storage near the railway and outside the construction
limit of the railway.

2.1.11. Distance between house and constructions that is not stipulatied in the
above items will be taken from table 5. When determining distance must
base on the fireproof level of either of two subjects above, and have the
production level conforming to the higher fire danger.

Page 7 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

Table 5

Production level Distance according to the fireproof of


Fireproof houses and constructions remaining (m)
used to determine
level
the distance I and II III IV
A and B I and II 10 12 15
C, D and Đ I and II 8 10 12
C, D and Đ III 8 12 14
C, D and Đ IV 12 16 18
Note: Because of special conditions and considering the specific terrain, with the
sensible reasons and having the agreement of the Fire Department the distances at
items 2.1.7, 2.1.8, 2.1.9, 2.1.11table 4 is reduced but not over 15%.

2.1.12. The houses and construction in petrol storage should be arranged follows
the stipulation in table 6.
Table 6

Area House and construction arranged in this area

1. Railway loading - filling Railway loading – filling station, pump station,


area compressor, oil interceptor tank, drum storage,
laboratory, office house and other construction related
to railway loading and filling

2. Waterway loading - Jetty, pump station, office house and other


filling area construction related to waterway loading and filling

3. Petrol storage area Petrol storage, vapour storage, heating equipment for
tanks, pump and compressor station

4. Retail loading area for Drum and small containing house, oil filler, pump
houses and production ward, drum storage, drum ground, truck loading and
construction weighting station,

5. House and utility Mechanical workshop, welding workshop, drum


construction cleaning shop, Generation and transformer station,
boiler station, warehouse, laboratory and other utility
constructions

6. Administration area Office house, garage, guardroom…

Page 8 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.1.13. Petrol storage constructed on slope hill and mountain must be put below the
neighboring construction or at the side of no construction. In case of putting
higher, must have the prevention method of breakdown storage and flowing
down to these constructions.

2.1.14. Must have a 6m wide road connect the petrol storage to the public road. In
case of connection length longer than 1000m, the road’s wide can be 3.5m
but must have a section of 6m wide and 12m to 16m long per each 250m for
car avoidance.

2.1.15. The petrol storage must be enclosed by fireproof material (fence) at the
minimum height of 2 m. The house and construction related to petrol storage
and loading/filling must be far form the fence at least 5 m.

2.1.16. The grade I and II petrol storage must have 2 entrances connecting to the
public roads. In case of grade III petrol storage, 1 entrance is permitted.

2.1.17. The firefighting road must be arranged around the tank farms, closed to the
constructions related to petrol loading – filling and storage. The minimum
road’s wide must be 3.5 m and be surfaced by fireproof material.
In special and reasonable case, with the consent of firefighting and fire
protection agency then not required the road surrounded the tank farm but
must build the road for firefighting facilities approach to the tank farm when
needed.

2.2. Petrol tanks

2.2.1. Petrol storage tanks must satisfy the following conditions:


- Tanks, foundation and isolating layer must be made of fireproof material.
- Must not put the glass level gauge on the tank wall for tank level
controlling. In case of necessary, must have the quick closed valve to
shut up the glass gauge to prevent breakdown. Breath valves of
underground tank must be put at the height of 2m at minimum from the
ground of tank fixing place.
Note:
1. Allow installing the glass level gauge for level controlling of small tanks, of which
the volume not higher than 100m3but must have the protection part to avoid
knocking.
2. Allow putting the breath valves closed to the topside of the aboveground tank’s
wall with volume lower than 100m3 but must be 2m far from the working place at
least.

2.2.2. Petrol tanks are arranged to groups or individual. The group volume must be
conform to the following stipulations:
a. Group tank with automatic or fixed firefighting system
 Not over 80,000m3 for the tank with floating roof or float for loose
prevention.

Page 9 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

 In case of fixed roof tank with free surface, not over 40,000m 3 and
80,000m3 for the class I and class II petrol storages respectively.
b. Group tank with mobile firefighting system
 Not over 40,000m3 for the class I petrol tank with floating roof or float for
loose prevention.
 In case of fixed roof tank with free surface, not less than 20,000m 3 and
not over 40,000m3 for the class I and class II petrol tanks respectively.
c. Total surface are of underground tank group and the surface are of one
underground tank must not be over than 14000 m2 and 7000 m2
respectively.
Note:
1. In case of aboveground tanks with capacity over than 1000 m 3, must be
arranged tanks into 1 or 2 rows in each tank group.
2. In case of underground tanks with capacity less than or equal to 100 m 3, allow
to be arranged in groups with total group capacity not over 5000 m3. In case of
aboveground tank, the group capacity must not be over than 500 m3 and 2500
m3 for the class I and class II petrol respectively.

2.2.3. Distance between two tanks or bullets is stipulated as follows:


 Equal to 0.75 time of diameter but not higher than 20m for the class I
petrol tank with floating roof or float for loose prevention.
 Equal to the diameter for the fixed roof tank with free surface, but not
higher than 30m and 20m in case of the class I and class II petrol tanks
respectively.
 Not stipulate the distance for the underground storage tank with
capacity under 100m3
Note:
1. In case of the group tanks with different diameter, the distance will be based
on the largest one.
2. The distance between two near semi - aboveground storage tanks will be
decreased 25% comparing with the above stipulations.
3. The distance between two class II petrol storage tanks will be decreased 50%
comparing with the above stipulations.

2.2.4. The minimum distance between two near underground storage tanks with
capacity over than 100 m3 is a meter.

2.2.5. Distance between two group storage tanks (from the closet walls of two
groups) must conform to:
 40m at minimum for the aboveground storage tank:
 20m at minimum for the aboveground storage tank with capacity less
than 100 m3
 20m at minimum for the semi - aboveground storage tank:

Page 10 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.2.6. Must build a dyke or walls around tank or group of tank as mentioned in item
a and b of clause 2.2.2 of this standard.
The soil dyke or wall must stand the hydrostatic liquid caused of overflow
petrol when the storage tank breakdown. The height of dyke or wall must be
higher than 0.2m comparing with level of oil overflow when the storage tanks
breakdown but not less than 1.0m.
In case of soil dyke, the minimum of dyke wide must be 0.5m; in case of the
concrete wall, minimum wall thickness must be 0.25m. Space between dyke
and tank must be enough for containing the oil of largest tank if breakdown.
Note: In a group of tank, if there is a tank or total capacity of tanks over than
20.000m3 then must build the sub-dyke or enclosed wall with the minimum height of
0.8m inner the main-dyke to separate tanks or tank group in such the total capacity
of this separated tanks must be smaller than 20.000m3

2.2.7. Minimum distance from wall of aboveground or semi-aboveground tanks to


the dyke or wall equals to a half of diameter’s tank at least. It’s not applied to
sub-dyke in a group. In case of aboveground storage tank with capacity less
than or equal 100m3, the minimum distance is 1.2m.

2.2.8. Must make the entrance road of tank group crossing to dyke by fireproof
material. Must have 4 and 2 opposite entrance roads for the tanks group and
separated tank respectively.

2.3. Petrol pipeline

2.3.1. The petrol pipeline can be installed aboveground or underground.


The aboveground or underground pipeline must be painted and coasted as
per Vietnamese standard 4090:1985.
The pipeline is arranged in tray made of fireproof material only in necessary
case and the tray bottom must be slopped down to a drain system.

2.3.2. The distance on the width from petrol pipeline to houses and constructions in
the petrol storage but not related to loading and filing works is stipulated in
table No. 7.

2.3.3. The distance on the height of aboveground petrol pipeline is stipulated as


follows:
 From ground level to bottom pipeline must be higher than 0.25m
 From road for walking to bottom pipeline must be higher than 2.2m
 From road for car to bottom pipeline must be higher than 4.5m
 From top of rail to bottom pipeline must be higher than 6m
The supports must be made of fireproof material

Page 11 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.3.4. Must install a shutdown valve at inlet pipeline outside dyke or walls before go
to the storage.

2.3.5. Must not arrange the petrol pipeline across ground of the house or
construction not related to petrol loading - filling.
Must no arrange the petrol pipeline with burring temperature lower than 45 0C
in the same trays with steam and hot water pipelines.
The petrol pipeline must be covered by protection pipe when passing
through a road. The diameter of protection pipe is higher 100mm than the
outside diameter of the petrol pipe (including a concrete coasting thickness)
at least.

2.3.6. Must be installed safety relief valves on the main pipeline in loading and
filling area.

2.3.7. Must install heating elastic equipment on process pipe. Heating insulation is
made of fireproof material.

2.3.8. Must put an underground process pipe at least 200mm from the top pipeline.

Table 7

Minimum distance from industrial


pipeline (m)
House, technologic construction
must be determined a distance
Underground and
Aboveground
in tray

1. Foundation of house and storage 3 (0.5)* 3


(excluding storage tank)

2. Petrol storage tank 3 4 (but not less than


depth of bottom tray
to tank foundation)

1 1.5
3. Foundation of fence, electricity pole,
loading and filling, communication
system

4 4 (but not less than


4. Rail center
depth of bottom tray
to rail foundation)

5. Road

 Made of macadam 1.5 1.5

Page 12 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

Minimum distance from industrial


pipeline (m)
House, technologic construction
must be determined a distance
Underground and
Aboveground
in tray

 Made of soil 1.0 1.5

6. Electricity ‘ pole foundation


 Lower 1KVA and outdoor 1.0 1.5
lighting
 1 – 35 KVA 5.0 5.0
 Upper than 35 KVA 10 10

7. Water pipeline 1.5 1.5

8. Heat pipeline 1.0 1.0

9. Cable lower 35KVA and 1.0 1.0


communication cable

Note: (*) is applied to a house with roof.

2.4. Fuel pump station

2.4.1. Fuel pumps can be put indoor or outdoor.


The distance from lubricant or petrol oil pumps to tank is at least 3.0m.

2.4.2. Fireproof level of petrol pump station must be Class II at least. Especially, a
grade III petrol storage, the roof of petrol pump station can be made of
fireproof material, and the pump room must not have ceiling.

2.4.3. The facilities in pump station can be included:


 Transformer with capacity less than 10 KVA.
 Electrical distribution facilities
 Cathodic protection
 Process controller
 Metering
 Ventilation
 Operation room
The operation room must be separated from the pump house by a close
fireproof wall

Page 13 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.4.4. The stipulations of valves that are installed on the facilities of pump station
are as follows:
 In case of grade I and II petrol storage, 6 pumps are the maximum
total pumps in station for pumping oil with flashpoint temperature less
than 1200C or not over 10 pumps for pumping oil with flashpoint
temperature equal or higher than 120 0C (this total pumps does not
include a stand-by pump, Vacuum pump and another pumps) .
 In case of grade III petrol storage, 10 pumps are the maximum total
pumps in station for pumping oil with flashpoint temperature less than
1200C. For the petrol with flashpoint temperature higher than 120 0C,
the total pumps is not be stipulated.
Beside the above stipulation, the valves must be put outdoor pump houses.

2.4.5. If necessary to build the house for valves outside the pump houses then the
valves house must be made of a fireproof material and fireproof level must
be 0.75 hour at least.
The ground for valves must have necessary slope and water drainage to
drain system.

2.4.6. The minimum distance between two neighbouring pumps (basing on a


centerline of pump) must be 1.0m. The minimum road’s wide between two
neighbouring pumps must be 0.7m.

2.4.7. Must install emergency shutdown valves (ESDV) at inlet and outlet pipeline
headers of pump station. The distance from ESDV to pump house is 10-50m.
If the valves of inlet / outlet pipeline and the valves of loading-filling pipeline
are arranged within these above distances then they can be used as the
ESDVs.

2.4.8. Must chock on the walls separated the pump rooms from another that the
pipelines cross to, to prevent petrol diffusing from pump house to others.

2.4.9. Electrical facilities in pump station must have a suitable explosion – proof
class.
In case of transferring many kinds of petrol with different flashpoint
temperature, must base on the petrol that has the lowest flashpoint
temperature to choose the explosion protection equipments.
Must build the fire-separated walls with fireproof class at least 0.75 hour to
separate the machinery room and the engine room in case of using non-
explosion – proof engine. The place of connecting the engine to pump must
be chocked to prevent petrol diffusing from pump room to the engine one.
Must not use a driving belt in pump station in case of pumping the petrol with
flashpoint temperature less than 450C.

2.4.10. The installation and maintenance equipments in pump station must be as


follows:

Page 14 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

 Pulley and support with loading capacity up to 0.5 ton.


 Pulley and motor-rail with loading capacity from 0.5 to 2.0 tons

2.5. Railway loading and filling constructions

2.5.1. Railway loading and filling construction must be arranged on a straight line.
Note: In case of class III petrol storage, if the loading and filling system is
equipped the facilities on a side then can be arranged in bend section with
the minimum radius of 200m

2.5.2. The constructions for railway loading and filling can be on one side or both
side and must be made of a fireproof material. The stairs at the front and end
of loading and filling area must be made of a fireproof material. If the
constructions are longer than 200m, must put stairs along the length of this
area and the distance between two stairs is less than 100m.

2.5.3. The length of railway loading and filling construction depends on the loading
and filling’s fuel volume, but this volume is not over the capacity of train tanks
that the locomotive can pull.

2.5.4. The distance from center rail in a loading and filling construction to a another
houses and constructions (exclude tanks) in the fuel storage must base on a
stipulation as per Table 8.

2.5.5. In case of petrol with flashpoint temperature less than 120 0C, the fire-
protection distance from the underground tank for residual oil interceptor to
the center of the railway must be 6 m at least. In case of equal or higher than
1200C, permit to arrange near the railway.

2.5.6. The minimum distance between the loading – filling constructions of class I
and class II petrol is 15m.

2.5.7. The branch length of railway loading – filling constructions must be longer
than 20m comparing with loading – filling construction in direction of
impasse.

2.5.8. The minimum distance between two loading – filling constructions on the
same railway branch and on the parallel railway must be 20 and 15m
respectively, and the minimum distance between the centers of two railways
must be 20m.

2.5.9. The minimum distance from the railway branch for engine driving carriages
to the railway loading - filling construction must be 20m and 10 m for class I
and class II petrol loading – filling construction respectively.
Must not use the railway belong to the petrol loading – filling construction for
the purpose of engine driving carriage.

2.5.10. Types of railway loading - filling construction as follows:


Closed type: having closed petrol pipeline system

Page 15 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

Opened type: having the petrol tray system beside or inner railways. The
petrol tray must be made of fireproof material.
In case of loading – filling construction for petrol with flashpoint temperature
less than 1200C, must apply the closed type. In case of flashpoint
temperature equal or higher than 1200C, must apply the opened type.
Table 8

Name of House and work Fireproof level Minimum distance (m)

1. Pump station I, II 8
III 12

2. House for filling to drums or I,II 15


small cans
III 25

3. Truck loading station I,II 20


III 30

4. Entrepôt tanks for truck loading


- Aboveground tank - 25
- Underground tank - 10

5. Ground for drum and small can I,II 15


storage
III 20

6. Waste water pump station and I,II 15


waste water processing system
III 25

7. House and another I,II 15


constructions

8. House and another work using I, II, III 40


opened flame

9. Measuring tanks - 25

10. Jetty - 30

Note:
1. Drum petrol warehouse is arranged beside the railway but must be out side
the safety limit for construction adjoining to the railway stipulated by Railway
Head Department.
2. Because of special conditions and considering the specific terrain, with the
sensible reasons and having the agreement of the Fire Department the
distance in table 8 is reduced up to 15%.

Page 16 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.5.11. Must put a ball valve on a pipeline connecting the railway loading - filling
construction to the petrol interceptor tanks.

2.5.12. Must install a ball valve on the petrol pipeline to railway loading - filling area
at a distance from 10 to 50m.

2.5.13. The design of the petrol loading-filling construction must ensure to drain off
all the surplus petrol in the loading-filling pipeline after stopping exchange.

2.5.14. The loading - filling ground area must be leveling and slope to drainage.
Must have the water drainage along the loading-filling construction and
connect to drain system.

2.6. Jetties and waterway petrol loading- filling construction

2.6.1. The jetties and waterway petrol loading- filling constructions must be made of
a fireproof material. The jetty must be wide enough for installing the petrol
pipelines and road for operation and maintenance activities.
If the offshore jetty with bridge connecting the bridge’s wide must conform to
the above requirements.
Must have a fence for protecting the jetty and facilities for ship arriving.

2.6.2. The minimum distance between two sea or lake jetties must be 150m and
100m for the loading – filling construction of class I and class II petrol
respectively but must not smaller than the length of maximum capacity ship.

2.6.3. The minimum distance between two jetties on the river must be 100m and
75m for loading – filling construction of class I or class II petrol respectively.

2.6.4. The minimum distance between sea or lake jetty for loading/filling and
military port or other jetties must stipulate the following:
 Class I petrol loading- filling jetty: 200m
 Class II petrol loading- filling jetty: 150m

2.6.5. The river jetty must put at lower section comparing with others construction
along the river and the minimum distance between them must follow the
stipulations:
 Distance to military or cargo ports: 1000m
 Distance to hydroelectricity plant, water supply plant: 300m
 Distance to another constructions (excluding the above constructions):
200m
In case of river jetty put at higher section comparing with other constructions
along river, the minimum distance between them must conform to the
following stipulations:
 To military port: 4000m
 To port, hydroelectricity plant, water supply plant: 2000m

Page 17 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

 To another construction (exclude above construction is mentioned):


800m
Note:
1. The distances as mentioned above are applied to the loading - filling
construction for class I petrol, and will be decreased 35% in case of class II
petrol.
2. In case of using for loading-filling services for the ships with load capacity
under 300 tons, the distances mentioned above will be decreased 50%

2.7. Drum and tank-truck oil loading areas

2.7.1. Drum and tank-truck oil loading areas can be arranged indoor or outdoor. If it
is arranged indoor, a minimum fireproof level of roof must be at level II.
The loading arms for class I and class II petrol can be arranged in the same
house or ground.

2.7.2. The distances from the truck-loading area to the houses and other
constructions (excluding tanker) must obey a stipulation in Table 9
Table 9

Name of House and work Fireproof level Minimum distance (m)


1. Truck weighting - 10
2. Warehouse for drums or I,II 10
small cans III 20
3. Fuel pump station I,II 10
III 20
4. Drum ground - 10
5. Waste water pump station I,II 15
and waste water processing III 20
system
6. House and other I,II 15
constructions III 20
7. House and another works I,II,III 40
with flame
8. Tank loaded by tank truck
 Aboveground tank - 15
 Underground tank - 8
9. Measurement tank - 10 (5)
10. Center rail - 20
11. Jetty - 20
Note:
1. The distance between brackets is used for a liquid, which a flashpoint
temperature is larger than 1200C.
2. Incase of a specially condition, status at field and suitable cause, the distances
which is showed in table No. 8, decrease about 15%.

Page 18 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.7.3. Drum and small can petrol loading are can be in roof or house but must have
the fireproof level II at least. The grade III storage in roof or house for loading
a liquid which a flashpoint temperature equal or higher than 120 0C, the
minimum fireproof level of roof or house must be level III at least.

2.7.4. Rooms for fuel loading to drums and cans can be arranged in the same
house but must obey a stipulations as follows:
 The class I petrol loading rooms must be separated to the class II petrol
loading rooms.
 The drum loading petrol rooms must be separated to a rooms for can
loading.
 Rooms or loading leaded petrol must be isolated from others
 The walls for separating must have the fireproof level at least for 1 hour
and must have the entrance on the outside wall. In case of entrance on
separated walls, the entrance must be automatic close with the fireproof
level at least for 0.75 hour and the doorstep of 0.15m high.

2.7.5. The class II petrol gauging tank with volume of 25m 3 is arranged at a closed
side of the walls of loading house for drum and other small cans with the
distance of at least 2m. Must arrange two petrol gauging tanks from each
other of at least 0.5m. The total capacity of a group of gauging tanks must
not higher than 200m3 and not required to have a dyke covered around the
tanks.
If the class I petrol gauging tank or group of gauging tanks with total capacity
higher than the above stipulation, or with the total capacity as stipulated but
arranged at the opened side of the walls of drum loading house, then they
must be arranged far from the drum petrol loading house at the distance as
the stipulation of petrol storage.

2.7.6. The class I petrol gauging tank with capacity lower than 25m 3 is arranged in
the drum and small can petrol loading house.

2.7.7. Require installing a block valve with the minimum distance of 5m on the
pipeline to the oil loading room for motor and drum and other small
containing things.

2.8. The petrol drum storage

2.8.1. The petrol drum storages must have a fireproof level as follow:
If the petrol flashpoint temperature lower than 120 0C or the house area over
300m2 then the minimum fireproof level must be level II. If the petrol
flashpoint temperature from 120 0C and upward or the area lower than 300m 2
then the minimum fireproof level must be level III.

Page 19 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.8.2. The petrol drum storage may be arranged together with petrol drum loading
room, but must have door and be separated by fireproof wall with fireproof
level for at least 1 hour.

2.8.3. The petrol drum storage must be divided into rooms by fireproof walls. The
containing capacity in each room as follow:
- Class I liquid: maximum of 100m3
- Class II liquid: maximum of 500m3
The containing capacity of storage:
- Class I liquid: maximum of 600m3
- Class II liquid: maximum of 3000m3

2.8.4. Allow putting together drums of class I liquid and drums of class II liquid, but
the total capacity and storage are not over 100m 3 and 600m2 respectively.

2.8.5. The door dimension of petrol drum storage must ensure the convenience for
means of transport but must not be smaller than the following stipulations:
The width and height of doors are 2.1m and 2.4m respectively. In case of
small storage with area under 50m 2, the width is 1.8m. The doors must have
the minimum fireproof level of 0.6 hour. The height of doorsteps must be
0.15m.

2.8.6. The floor of petrol drum storage must be made from the fireproof material,
have the necessary slop and trench to direct the flow to the drain water
system.
The width of doorstep must be 0.8m at minimum and made by fireproof
material.

2.8.7. When designing the petrol drum storage must satisfy the following
conditions:
- Manual drum arrangement not over 3 layers of drums
- If using brackets then one drum layer on each bracket. The width of
bracket not longer than of the long of drum in 2 times.
- Machinery arrangement: Can pipe up the drums of class I liquid but not
higher than 3 drum layers, if class II liquid then the limit is 5 drum layers.
- In the storage that the drums arranged in chain then the maximum width
of each chain is 2 rows of drums, the minimum path for drum rolling is
1.8m. The maximum path between two brackets is 1m.

2.8.8. Floors and platforms for drum loading/unloading to railroad cars and trucks in
the grade I and II storages must be made from fireproof materials. As to
grade III storage permit to make from flammable materials.

Page 20 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.9. The ground for drums and analyzer house

2.9.1. The grounds for both iron and wood drums must satisfy the following
conditions:
If the ground is 0.2m high, then must have the necessary slope for water
draining and the water drainage system around. The ground area must not
be larger than 400m2
In each ground, the drums are arranged in chains, the width of each chain is
not over 2 rows of drums. The height of chain is not higher than 2m. The
minimum path width between two chains is 1m.
The distance between two grounds is 5m at minimum, 10 grounds is
incorporated into group of grounds. The distance between two groups of
ground is 10m at least.

2.9.2. The roofs for drum maintenance must be made from the fireproof material
with the fireproof level of IV at minimum, and must satisfy the following
requirements:
In each roof, the drums are arranged in chains, the width of each chain is not
over 2 rows of drums. The minimum width of path between two chains for
machinery loading must be guaranteed but not smaller than 1.4m.
The minimum distance between structures of the roof to the top drum layer is
1m.

2.9.3. The vacant ground for drum of class II petrol must ensure the following
requirements:
If the ground of 0.2m high then must have the necessary slope for water
draining and the water drainage system around. The ground area must not
be larger than 400m2.
In each ground, the drums are arranged in chains, the width of each chain is
not over 2 rows of drums. The height of chain is not higher than the height of
two drum layers. The minimum path width between two chains is 1.4m.
- 6 grounds are incorporated into group of grounds. The distance between
two groups of ground is 10m at least.
- Fireproof roof is made for the ground of class II liquid drum.

2.9.4. Petrol analyzer house must have fireproof level of III at minimum. It is
allowed to arrange the analyzer room together in the same house with other
rooms but the analyzer room must be separated from others by fireproof
walls made with fireproof level of 1 hour at minimum and have separated
doors.
No arrangement the analyzer room in the house of A and B production class.

Page 21 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.9.5. Can arrange the separated rooms for compressor, gas generator, keeping oil
sample and other chemical for analyzing, but these room must be separated
by fireproof walls with fireproof limit of 1hour at least and have separated
doors at outside.

2.10. Water supply and drainage – fire protection and fighting system

2.10.1. The water supply and drainage system, the fire protection and fighting
system for petrol storage is designed conforming to the standards of urban
water supply / drainage, the standards of fire protection and fighting for
house and construction and the current state stimulations of industrial
sanitation.

2.10.2. The fire fighting system in the grade I and II storages are stimulated as
follows:
The fixed firefighting system for grounded storages that have the diameter
higher than 22m and the capacity from 5000m3 upward.
The mobile firefighting system for grounded storages that have diameter
maximum at 22m and the capacity under 5000m 3 as well as the ungrounded
and semi-ungrounded/grounded storages.
Use the mobile firefighting system as to grade III storage.
Note:
1. Fixed fire-fighting system is that all the equipments and facilities for fire fighting
are fixed installation to be a fully worked out system.
2. Mobile fire-fighting system is that apart of equipments and facilities for fighting
are fixed installation, but the main parts must be erected at the flaming place to
supply water

2.10.3. With storage of fixed roof or floating roof, must design the fixed water pouring
system if the height of the storage higher than 12m.

2.10.4. If the jetty does not have fighting system its own then can share the fire
fighting system of storages.

2.10.5. The calculation and arrangement of fire equipments for pump stations,
load/unload station, petrol drum storages and other constructions must be
coordinated with the fire fighting system arrangement of the storage in the
most sensible and economic way.
In case of installing the fixed firefighting system for the storages, must setup
the water pipes and fire hydrants along the load/unload constructions for
transportation by railway, waterway and truck loading station in order to
serve the mobile fire fighting facilities.

2.10.6. The storage using the mobile fire fighting system must follow the
stimulations:
Build up the water tank for water reserve or using the natural water in rivers,
lakes and ponds.

Page 22 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

The reserved water volume in the tank or from the nature must be enough
for the fire-fighting requirement but not lower than 100m 3.
For convenience, must have at least two fire hydrants to supply water to the
fire fighting facilities. The distance from the fire hydrant to the storage is
stimulated as follows:
- Less than 200m for fire fighting truck
- Less than 150m for the mobile fire fighting pump
In both cases, the distance must not less than 40m to the petrol storage and
20m to other houses.
Must build a road and ground beside the lakes or tank for firefighting facilities
taking water. Must take into account the highest and lowest water level when
designing the tank for water firefighting.

2.10.7. To stamp out the fire for the petrol tanks can use foam dissolved in
atmosphere. The standards of capacity of foam creating matter, required
time for stamp out a fire for petrol tanks and constructions are choosen
according to the stipulations of State.
The quantity of reserve foam is equal to three times of required foam for
stamping out the largest fire.

2.10.8. The watering flow for aboveground tanks (excluding the floating roof tanks)
must conform to the following stipulations:
 The firing tank is watering with flow of 0.5 litres per second for 1 m tank
diameter
 The tanks near the firing tank and in the distance limit that smaller or
equal to 2 times of firing tank diameter are watering with flow of 0.2litres
per second for 1 m tank diameter (watering only half of a diameter which
close to the firing tanks).
 Watering volume for the semi-aboveground tank is decreased 50% in
comparison with the aboveground tank.
 For underground tank (including firing tank and the one near firing tank),
the watering flow as follows:
- 10litre / second for tank with capacity from 100m3 to 1000m3
- 20litre/ second for tank with capacity from 1,001m3 to 5,000m3
- 30litre/ second for tank with capacity from 5,001m3 to 30,000m3
- 50litre/ second for tank with capacity from 30,000m3 to 50,000m3
 The watering time for firing and near firing tanks is at least 3 hours

Page 23 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.10.9. Firing water volume for all storages is equal to the highest water volume that
calulated to stamp out the fire for a greatest petrol tank, a petrol loading-
filling ground, or firefighting the indoor or outdoor of house.

2.10.10.After at least 48 hours must fill up water to lakes, ponds and tanks that used
for firefighting.
In the case of rare water sources then the duration time for water filling up is
96 hours.

2.10.11.The firefighting pump station is equiped the pumps for foam creating
substance and watering. When design and installation the pump station, the
number of standby pumps must conform to the temporary State stipulations
of fire protection and firefighting for houses and constructions
Note: The watering pump may be put at other room outside the firefighting pump
station.

2.10.12.Free pressure in the firefighting system of petrol storage is stipulated as


follows:
 Must be from 40 meter column of water to 60 meter column of water
before the foam creating equipment;
 Must be at least 10 meter column of water at the end of the firefighting
tap of the fixed watering equipment.
 Must be at least of 40 meter column of water at the head of mobile
firefighting equipments

2.10.13.Must arrange the waste water drainage system for collecting and processing
the waste water from the following sources:
 Floor cleaning water of houses and loading - filling constructions,
Cleaning water of vehicles, equipments and facilities for maintaining and
loading-filling activities, waste water of chemical laboratory.
 Waste water from the bottom of tanks
 Sprinkled water to tanks when firing
 Rain-water on the loading-filling ground, ground of the tanks area
Note:
1. Not put the waste water from hygiene areas to the drain system above.
2. Allow the rain water at the areas that are not affected by oil to flow to the normal
drain system.

Page 24 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.10.14.The waste water from the tanks and the equipment related to maintenance
and loading-filling of leaded petrol and the waste water of chemical
laboratory must be collected and drained into the separated drain system for
deleadinizing before fowing to the industrial waste water drainage system

2.10.15.The industrial waste water drain system for the grade I and II petrol storages
must be closed type. For the grade III petrol storages allow to be a opened
type.

2.10.16.Must arrange the stopped hole with the lowest water level of 0.25m at the
following places in the waste oily water drain system:
 At a joining to the petrol tank.
 At joining from loading-filling ground to the drain water pipeline.
 At joining from valve ground, pump station, laboratory, truck loading
station, drum loading house… to the drain water pipeline;
 At front and behind the oily water interceptor tank with distance of 10m at
minimum
 On the pipeline connect to the drainage system of railway loading-filling
construction with maximum distance of 50m between two holes.
 On the main drain water system with maximum distance of 400m
between two holes.

2.10.17.In front drain water pipe from tank area must arrange a safety valve in the
collecting hole near the dyke’s foot and at the separated walls’ foot on the
side near tanks area. The controls of the safety valves must arrange outside
or on the dyke.

2.10.18.Along the railway loading-filling construction must have drainage ditch, must
have a branch connecting to the drainage system around the stopped holes
at every 50m length.

2.10.19.Inside drum petrol filling house, petrol drum and small can storage must build
a drainage ditch connected to the tanks or holes outside to retrieve the
leaked and poured down petrol when loading and storage.

2.10.20.Allow design the oil interceptor and recover tank for local processing at each
part of the storage or common processing of the construction. The oil
interceptor and recover tank can be designed in opened or closed type.

2.10.21.Waste water in petrol storage must be treated conform to the requirements of


hygiene as stipulated in the Vietnamese standards of environmental
sanitation in force before flowing out.

Page 25 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2.11. Heat supply and ventilation

2.11.1. The design of heat supply and ventilation system for the petrol storage must
conform to the stipulation in the in force design standards of the heat supply
and ventilation system.

2.11.2. Only use the flollowing heat sourses in the petrol storages for oil warming up:
saturated steam, hot water or specialized electrical equipments

2.11.3. Must not install the heat supply pipe under the foundation of a workshops
which have explosion-fire dangers. In indispensable case, allow to install
heat supply pipes install at in/out way and entrance, but must put these pipes
in trench, fill up them by sand and cover by brick.

2.11.4. The design of ventilation system for houses and construction in petrol
storage must base on the properties of loading – filling and storage pertol
type in houses as well as the properties of these constructions to define air
exchange multiple arcodding to the stipulations in table 10.
Table 10

Name of petrol type loading-filling, Air exchange multiple in an hour


maintenance in hall or construction Without sulfur With sulfur
1. Oil with high sulfur content (the sulfur 6.5 10
content higher 2%).
13.5 8
2. Desulfurized Oil
6 13.5
3. Leaded petrol.
5.0 8
4. Petrol
7
5.Paraffin, diesel oil
3.5
6. Lubricating oil, grease ( without dissolve
5.5
matter)
Note:
1. In petrol drum and small can storages (not depending on the petrol type )
then air exchange multiple must not be smaller than 1 time per hour.
2. Air exchange multiple give above used for houses and constructions that
have the height of 6m. For lower houses, every 1m reduced in height , the
air exchange multiple must increase 16 percent.

2.12. Electrical, communication, automatic equipment

2.12.1. The installation of electrical, communication equipments in petrol storage


must choosen so that suiable with the installation environment of these
equipments.
Must use the copper core cables to conduct electricity to the equipments that
contact with petrol gas. The cable installation must confrom to the stipulates

Page 26 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

in government technical standards of safety on electrical equipment


installation and arrangement.

2.12.2. Must put the lighting system for protection, lighting system inside and outside
houses and construction related to petrol loading-filling and storage activities
conforming to the standard in force of natural and artificial lighting of the
government.
Must use flood-lights installed on poles outside the petrol storage for lighting.
Allow to combine the electrical lighting system with the lighting system for
roads in the storage.

2.12.3. The design of the direct lightning and electrostatic protection systems for
petrol loading-filling houses, constructions and storage must conform to the
provisional stipulates of design, execution and management of the lightning
protection system.

2.12.4. Must guarantee the safety requirements of fire-explosion protection for the
automatic mechanism and remote control equipments applied to petrol
loading-filling, storage and fire fighting in the petrol storage.

2.12.5. Must have the communication system between . For grade I and II storages
must have a trusted communication facilities to the nearest firefighting
agency and must had fire alarm system.
It is not necessary to have all the internal communication facilities but must
have the trusted communicate facilities to the nearest firefighting agency.

3. Design requirements for group II storage


(Not including the retail petrol stations)

3.1. Total capacity of the group II petrol storage include all inflammable and
burnable petrol types that were held in all kind of containers ( tank, drum and
other small cans stipulated in table 11)

Table 11

Common capacity of the storage ( m3)


Name of petrol type
Aboveground and semi aboveground Underground
Type I 1000 2000
Type II 5000 10000
Note:
1. When calculating the capacity of the petrol storage of both class I and II petrol,
then the convert calculation as follows: every 1m3 of class I petrol equivalent to
5m3 of class II petrol in case of aboveground storages, or equivalent to 2m 3 of
class II petrol in case of underground or semi aboveground storages.

Page 27 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

2. If the storages larger than the stipulations in table 11, then they are arranged
according to the stipulations for the group I storages of this standard.

3.2. Allow to arrange an area for petrol used for manufacturing directly in the
house and constructions having fireproof level of I and II but the capacity not
allow to exceed the stipulations in table 12.

Table 12

Container facilities Petrol capacity ( m3)


Type I Type II
1. Drums arranged in separated room with fireproof 10 50
walls and doors at outside walls
2. Drums arranged in house and construction of 1 5
manufacturing level D and Đ.
3. Aboveground tanks arranged in separated room Depending on the
fireproof walls and doors at outside walls manufacturing requirements
for 1 day and night but not
allow to exeed:
30 150
4. Underground tanks arranged in house Not allow 200
5. Tank put on support, leaning poles and fireproof 1 5
floor in houses of manufacturing level D and Đ
Note:
1. The petrol tank for engine testing station must be placed outside station at
distance of 10m towards the opened walls, and no stipulation towardsthe closed
walls.
2. The aboveground tanks with capacity larger 1m 3 containing class I petrol and
5m3 containing class II petrol, arranged in house must have pipeline connect to
underground tanks for breakdown at minimum distance of 1m and 5m toward the
closed walls and opened walls respectively. The capacity of tanks for breakdown
must not lower than 30% of total capacity of tanks and not lower than the capacity
of largest tank. Must arrange the ball valve on the pipeline at outside the house.
3. Allow to arrange the lubricant oil tanks with total capacity lower than 400m 3 and
not require pipeline and tanks for breakdown at the cellar of houses with fireproof
level of II used for metal rolling, thermal treating and other workshops.
4. Not allow to let out the inflammable and burning vapor directly in the house of
these tanks..

3.3. Allow to arrange the rooms related to petrol loading-filling and storage in the
same house with other rooms for:
 Storage the petrol drum or small tank;
 Reprocess lubricating oil equipment;
 Oil pump station;

Page 28 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

 Cleaning drum and heated emulsion equipments;


 Storage the empty drums…
The rooms for petrol pumps and drums must isolate from the remain rooms
by fireproof walls with fireproof level of 0.75 hour, the doors are opened from
the outside with fireproof level of at least 0.6 hour and doorstep height of
0.15m.

3.4. The distances from aboveground petrol tanks to houses and constructions in
the petrol storage must be conform to the stipulations in Table 13.
Table 13

House and construction required to The lowest distance depending


determine a distance on the class of petrol (m)
Class I Class II
1. Pump station, petrol drum and small can 10 8
loading house
2. Houses and grounds for petrol drums,
15 10
railway or truck loading station, weighting
house.
3. The electrical line in the air. According to stipulation of electrical
equipment installation
Note:
1. In case of underground tanks, the distances at item 1 and 2 in table is reduced 50%.
2. Not stipulate the distance between underground tank contained the petrol with
flashpoint temperature higher 1200c to the petrol pump station.

3.5. The minimum distances from petrol pump station and petrol drum storage to
the center of the railway of loading – filling construction are 10m and 8m for
class I and class II petrol respectively.

3.6. The distances from aboveground tank, petrol drum storage, petrol pump
station to the railway and road are taken not lower than the stipulations in
table 14.
Table 14

The lowest distance depending


Type railway or road on the class of petrol (m)
Class I Class II
1. To the center of the public railway 50 30
2. To the center of enterprise’s internal railway 20 10
3. To the edge of public road 10
4. To the edge of enterprise’s road 10 5

Page 29 of 30
Vietnamese Standard 5307 : 1991 Group H
Petroleum Storage and Petroleum Products – Design Standard

Note:
1. In case of underground tanks, the distances in table are reduced 20%.
2. If the tanks, pump stations, drum storages contained the petrol with flashpoint
temperature higher than 1200c then the above distances are not stipulated but must
be arranged outside the gabarit of the railway which are stipulated by the related
organizations .

3.7. Distances from aboveground tanks, underground tanks, petrol drum storage,
petrol pump station, petrol drum loading ground and loading-filling
construction to the constructions of the nearby enterprises are required to
conform to the clause 8.14 and 8.15 of Vietnam Standard 2622:1978.

Page 30 of 30