7.

TELECOMMUNICATION WORKS
A. Scope of indoor communication work
B. Wiring works
C. Telephone terminal box
7. Telecommunication works

A. Scope of indoor communication work


(1) This includes the piping work from the terminal boundary to the terminal box for
central office line
(2) The outdoor telephone cable construction up to the terminal box for central office
line is excluded from this construction.
(3) When the above two matters differ from Indonesian regulations, Indonesia's
telecommunication regulations shall be prioritized.

B. Wiring works
(1) For indoor telephone wiring, use UTP cable as a type approved product.
(2) For wiring between the indoor terminal boxes, use a UTP cable of 0.5mm or more.
(3) The wires shall be put in after the wireway and box interior are thoroughly cleaned.
(4) Indoor communication cables shall be installed apart from indoor strong current
cables as follows. (However, if the indoor strong current wire is a cable, make
sure that it does not come into contact.)
① 60mm or more when the strong current wire is less than 300V
② 150mm or more when the strong current wire is 300V or more
(5) The telephone outlet installation height is 300mm from the center of the box. When
installed side by side with a heating socket, it shall be installed at a distance of
100~150mm.
(6) The insulation resistance between the indoor communication line and the earth and
indoor communication line shall be over 10MΩ with a DC 250V insulation
resistance measuring meter.
(7) Telephone and weak current wiring shall not be connected within the pipe.
(8) Separate by 150mm or more from the wiring of the heating part where the
temperature is 50℃ or higher.
(9) The telephone outlet uses the 8PIN modular jack (1 outlet type or 2 outlets type)
according to the Indonesian communication equipment standard.
C. Telephone terminal box
(1) The standard for the telephone terminal box follows the Indonesian standard.
(2) Telephone terminal box shall be manufactured of mild steel plates.
(3) Grounding terminal shall be installed in the telephone terminal box.
(4) It is to be ensured that the outer skin of the line is not damaged at the exit entrance
of the line.
(5) In the lead-in pipe, after the cable is installed, the pipe port (including the spare
pipe) shall be filled to prevent dew condensation.
(6) The wiring in the terminal box shall be arranged in an orderly manner.
(7) Each terminal in the terminal box shall be marked with the number for each circuit
and the number plate shall be attached inside the cover.
(8) During construction, the telephone terminal box is hardened in an appropriate way,
and the hardened plate is maintained until just before the finishing work.
(9) All equipment (PATCH PANEL, 110 BLOCK, FDF, etc.) installed in the telephone
terminal box and communication room use products approved by SNI and
Indonesia's communication equipment certification regulations.