GEN. FOUNDATION REQUIREM.

589.750/541.220 (net) MW on Gas/Fuel Oil


PROJECT : Combined Cycle Power Plant;
Meghnaghat; Bangladesh

SUMMIT MEGHNAGHAT II POWER


OWNER : COMPANY LIMITED

OWNER'S
ENGINEER : TRACTEBEL ENGINEERING PVT LTD

Sent to Owner for

GE POWER
Gas Power Systems

AP Doc Code QME/00/S/145b---000/EI/078

Document ID HTGG610357

Revision D Revision Date 2020-01-15

MK
Equipment Tag Number(s):

Sheet 0 / 13 Information Class, if applicable, on pg. 1 et sqq


DWG Number HTGG610357 Rev D Released 1/15/2020 Page 1 of 13

GE POWER HTGG610357
Resp. Dept.: Replaces: Revision: Doc Type: File no.:

9470 D EC
Prepared: Checked: Approved: Language: Page:

2019-12-04 doljedr 2019-12-18 wfurmans 2019-12-18 dgurazdo en 1 / 13

Export Controlled: Yes No ECCN: US origin : Yes No

Specification for Generator foundation requirements

Table of contents:

1 General .......................................................................................................................................... 2
1.1 Definitions ............................................................................................................................. 2
1.2 Foreseen application and purpose ........................................................................................ 2
1.3 Categories and criticality ....................................................................................................... 2
2 Form, fit and function requirements ................................................................................................ 2
2.1 Nature of the foundation ....................................................................................................... 2
2.2 Foundation requirements for anchoring system .................................................................... 2
2.3 Foundation requirements for rotor removal ........................................................................... 8
2019-12-18 EN Approved

2.4 Foundation requirements for cooling channels .................................................................... 11


Lng. Status

3 Notes ........................................................................................................................................... 13
3.1 Identification of changes ..................................................................................................... 13
Rev. Released
D
Type
EC
9470 HTGG610357
Dept. Document No.

© COPYRIGHT 2019 General Electric Company


All rights reserved. The information herein is Proprietary and Technically Exclusive content that is solely owned by General Electric
Company and/or its affiliates.Thus, it is being provided with the explicit expectation of restricted and privileged use. All persons or legal
entities receiving this information shall be deemed by the act of its receipt have contractually agreed to make no duplications, reproductions of
any nature by any means, modifications, disclosures, or use any portion of this material; except as is expressly authorized in writing by the
General Electric Company, and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 2 of 13

Revision: Page:
GE POWER
D 2 / 13
HTGG610357

1 General
This document provides input from the generator perspective to specify and design the
generator foundation for air-cooled machines and water and hydrogen-cooled generator W88
(50WT25E-138) type. These requirements are mentioned herein as a guidance and Generator
Engineering shall be contacted in case of missing or additional inquiries.

1.1 Definitions

1) Shall This word is used to indicate mandatory requirements strictly to be followed


in order to conform to the standard and from which no deviation is permitted.
2) Should This word is used to indicate that among several possibilities one is
recommended as particularly suitable, without mentioning or excluding
others; or that a certain course of action is preferred but not necessarily
required.
3) May This word is used to indicate a course of action permissible within the limits
of the standard.
2019-12-18 EN Approved

1.2 Foreseen application and purpose


Lng. Status

1) This specification applies to air-cooled generators of type A7x series (21Z and 23Z) and
water and hydrogen-cooled generator W88 (50WT25E-138) type.
Rev. Released

2) This specification defines the requirements for the Generator foundation from Generator
point of view in terms of design, construction and dimensions.
D

1.3 Categories and criticality


Type
EC

1) The information in this specification applies as a general rule.


2) All requirements of this specification have to be fully complied with. Where deviations are
9470 HTGG610357
Dept. Document No.

given, Generator Engineering shall be involved.

2 Form, fit and function requirements


Dimensioning is governed by the appropriate Generator and foundation outline drawing (MLI
A1B0 / B7G0). This specification describes the general outline conditions only.

2.1 Nature of the foundation


A differentiation is made between a steel and a concrete foundation. The foundation loading
data (standstill, operation and short-circuit) are given in Generator foundation loads plan (MLI
A1B1 / A1B3). The foundation constructor will build the foundation on the basis of this data,
taking into account the latest developments in turboset foundation design.

2.2 Foundation requirements for anchoring system

2.2.1 Description
The system consists of a long, pre-tensioned anchor, which his hold by a nut inside an anchor
box assembly. The anchor box assembly is embedded in the foundation. The assembly consists
of a pressure-plate, which itself transmits the anchor loads to the foundation. The anchor is
surrounded by a sleeve, which is connected to the pressure-plate. The entire assembly is seal-
welded. The nut shall be locked against rotation in the anchor box. The length of the anchor box
shall be designed to lower the anchor bolt below top of concrete level for generator installation.

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 3 of 13

Revision: Page:
GE POWER
D 3 / 13
HTGG610357

The detail of the generator anchoring system is shown in Generator and foundation outline
drawing (MLI A1B0 / B7G0).
The loads transmitted to the foundation are shown in Generator foundation loads plan (MLI
A1B1 / A1B3).
2019-12-18 EN Approved
Lng. Status

Anchor box with anchor bolt


Rev. Released

Figure 1. Example - Anchoring on A7x (WY..Z) generator


D
Type
EC

Nut with spherical seat


Generator frame
Washers with spherical seat
9470 HTGG610357
Dept. Document No.

Foundation support

Support plate
Seal frame Top of concrete level

Non-shrinking grout (6)

Steel plate with Foundation anchor bolt (7)


tapped holes M10
Sleeve (3)

Pressure-plate (2)

Nut (4)

Anchor box (1)

Anchor bolt and nut in


lowered position

Figure 2. Anchor box assembly with anchor bolt of A7x (WY..Z) generator

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 4 of 13

Revision: Page:
GE POWER
D 4 / 13
HTGG610357
2019-12-18 EN Approved
Lng. Status

Anchor box with anchor bolt


Rev. Released

Figure 3. Example - Anchoring on W88 (50WT25E-138) generator


D
Type
EC

Protective cover compl. Hex HD Screw


9470 HTGG610357

Special nut
Dept. Document No.

Support disc
Foot plate of generator
Bar
Foundation support
Foundation plate (5) Top of concrete level

Sleeve (3)

Foundation anchor bolt (7)

Pressure plate (2)


Nut (4)

Anchor box (1)

Figure 4. W88 (50WT25E-138) generator, Anchor box assembly with anchor bolt

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 5 of 13

Revision: Page:
GE POWER
D 5 / 13
HTGG610357

2.2.2 Division of responsibility and scope of supply


Generator specifies the required dimensions for the anchor box system from a generator
perspective. The foundation designer is responsible for determining the appropriate material
and the capacity of the foundation to resist the applicable loads.
Every part (refer to Figure 2 and Figure 4) is in the scope of the generator except the anchor
box assemblies (items 1, 2, 3, 4) and foundation plate (item 5). Foundation anchor bolts (item 7)
for generator, bearing pedestals (if exist), brush gear (if exist) and grout (item 6) can be supplied
on request by Generator, as per contractual requirements.

2.2.3 Material requirements


Bottom nut for the anchor bolt shall be supplied by the foundation designer. Material shall be
the following:
• 42CrMo5 1.7225 EN 10083-1, 91-02+A1, 96-08
• Minimum Yield Strength: 735MPa
• Tensile Strength: 900-1050MPa
• Elongation: Min 12%
2019-12-18 EN Approved
Lng. Status

Material for the anchor box and supports shall provide sufficient strength for the design
requirements. The material should as a minimum be EN 10025 S235 JR or equivalent.

2.2.4 Installation of embedded parts


Rev. Released

The arrangement of the foundation anchors is given by Generator and foundation outline
D

drawing (MLI A1B0 / B7G0).


Type
EC

The anchor box systems shall be installed in the foundation before concrete placement. This
system allows the site to install the anchor bolts shortly before the installation of the Generator
instead of at the time of foundation construction.
9470 HTGG610357
Dept. Document No.

Before positioning of anchor boxes in the defined location, a dimensional check shall be
performed to verify that the dimensions correspond with the design documents. The vertical
alignment of the anchor boxes is critical to generator installation. The tube and box shall be
aligned to provide a 90-degree angle with a tolerance of +/- 0.2 degrees:

Figure 5. Vertical alignment requirement of foundation anchor

Anchor boxes shall be positioned in the foundation prior to concrete placement. The anchor
boxes and other embedment’s shall be adequately braced prior to the concrete placement to
meet the location requirements specified below. During the concrete placement, care should be
taken to avoid entrapping air under the embedment. Entrapped air shall be removed by
mechanical means as necessary.
Before concrete placement, the anchor box locations shall be surveyed and recorded in the X,
Y, and Z directions.
Before concrete placement, the straightness of the anchor box shall be measured and recorded.
The generator embedment’s, including anchor boxes, shall located according to the locations on
the drawings.
 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 6 of 13

Revision: Page:
GE POWER
D 6 / 13
HTGG610357

(a)
(a)

(b)

(c), (d)

(e), (f), (g)

Figure 6. Embedded parts with tolerance requirements, A7x example


2019-12-18 EN Approved
Lng. Status

(e), (f), (g) (e), (f), (g)


Rev. Released
D
Type
EC

Figure 7. Vertical position (level of top of steel) of the center point of the fixed points, A7x series
(21Z and 23Z) generator
9470 HTGG610357
Dept. Document No.

Foundation steel plate (e), (f), (g) Foundation steel plate (e), (f), (g)

(a) (a)

Foundation steel plate (e), (f), (g)

Foundation steel plate (e), (f), (g)


(a) (a)

Support area for generator removal tools

Figure 8. Embedded parts with tolerance requirements, W88 (50WT25E-138) example

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 7 of 13

Revision: Page:
GE POWER
D 7 / 13
HTGG610357

(b)

(c), (d)

(b)
Figure 10. Brush gear
(b) foundation anchor (c), (d)
2019-12-18 EN Approved
Lng. Status

(c), (d)
Figure 11. Bearing
foundation anchor
Rev. Released
D

(e), (f), (g) (e), (f), (g)


Type
EC
9470 HTGG610357

Figure 9. Generator
Dept. Document No.

foundation anchor

Figure 13. Longitudinal guide Figure 12. Lateral guide

(e), (f), (g) (e), (f), (g)


(e), (f), (g) (e), (f), (g)

Figure 15. Support area for generator removal


tools
Figure 14. Axial shifting support

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 8 of 13

Revision: Page:
GE POWER
D 8 / 13
HTGG610357

The following tolerances shall be achieved after the concrete placement:


• (a) Horizontal position of the vertical axis of the anchor boxes: +/-5 mm
• (b) Inclination of the sleeve of the anchor box with vertical axis: 3 mm/m
• (c) Vertical position (level of top of steel) of the pressure-plate above the lower nut: +/-5 mm
• (d) Inclination of pressure-plate above the lower nut with horizontal axis (X and Y): 3 mm/m
• (e) Horizontal position of the center point of the fixed points: +/- 5 mm
• (f) Vertical position (level of top of steel) of the center point of the fixed points: +/- 5 mm
• (g) Inclination of fixed points with horizontal axis (X and Y): 3 mm/m

ATTENTION: All these tolerances are to be compliant after pour of concrete. Embedded parts
shall be installed with zero deviation from theoretical values before pour of concrete.

The top of the anchor box sleeve shall be set 15 mm (refer to Figure 16) above the final top of
2019-12-18 EN Approved

concrete elevation to avoid having concrete enter into the anchor box.
Lng. Status
Rev. Released

Top of concrete level


D
Type
EC
9470 HTGG610357
Dept. Document No.

Figure 16. Vertical position of top of the anchor box sleeve

The anchor box shall be covered during concrete placement and remain covered until the
anchor bolts are installed to avoid having water, concrete, or other material enter into the anchor
box.
ATTENTION: The anchor box assemblies shall not be filled with concrete or grout and shall
remain free of grout after installation of the anchor bolts.
After concrete placement the final anchor box locations shall be surveyed and recorded in the X,
Y, and Z directions. GE shall be informed of any deviations from the above allowable tolerances.

2.3 Foundation requirements for rotor removal

2.3.1 For Generators A7x, type WY..Z (generator terminals installed on the top of the generator
housing)
The foundation load requirements for the rotor removal (e.g. support structure, intermediate
rotor support) shall be specified project specific. The length to which the rotor is withdrawn is
defined as well project specific.

IMPORTANT:
Foundation pits shall preferably not be placed in the area of any rotor removal supports, or shall
be designed to carry the expected loads.

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 9 of 13

Revision: Page:
GE POWER
D 9 / 13
HTGG610357

2.3.2 For Generators A7x, type WX..Z (generator terminals installed on the bottom of the generator
housing)
These rotors are mainly removed using a crane and only need an intermediate support at the
NDE side before being finally lifted by the crane. Detailed process and additional foundation
load requirements for intermediate rotor support shall be specified project specific.

DE NDE
2019-12-18 EN Approved
Lng. Status
Rev. Released
D

Intermediate support
Type
EC

Figure 17. Example of intermediate support of rotor during rotor removal, A7x (WX..Z)
9470 HTGG610357
Dept. Document No.

2.3.3 For Generator W88 (50WT25E-138)

To remove the rotor from the generator


1) dismantling of appropriate components, see Figure 18
2) vertically lift of stator with rotor from the foundation, see Figure 19
3) placement of generator on lateral beams, see Figure 20
4) horizontally movement of stator with rotor to maintenance position, see Figure 20
5) removement of rotor from stator, see Figure 21

Detailed information about rotor removal and insertion procedure see drawing “Rotor Removal /
Insertion” MLI B8H0.

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 10 of 13

Revision: Page:
GE POWER
D 10 / 13
HTGG610357

Below there are presented main steps of rotor removal.


2019-12-18 EN Approved

Figure 18. Generator on foundation


Lng. Status
Rev. Released
D
Type
EC
9470 HTGG610357
Dept. Document No.

Figure 19. Vertical lifting of generator

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 11 of 13

Revision: Page:
GE POWER
D 11 / 13
HTGG610357
2019-12-18 EN Approved
Lng. Status

Figure 20. Generator in horizontal displacement to the maintenance position


Rev. Released
D
Type
EC
9470 HTGG610357
Dept. Document No.

Beams for generator lateral sliding

Figure 21. Rotor removal

2.4 Foundation requirements for cooling channels

2.4.1 Construction requirements for cooling channels inside the foundation, applicable for all
generators with an open ventilated brush gear arrangement are given in HTGG611746.

2.4.2 Generator cooler arrangement

2.4.2.1 For Generators A7x, type WY..Z (generator terminals installed on the top of the generator
housing)

The coolers are mounted in the generator frame. The generator frame is open at the bottom and
the change of direction of the air flow takes place within the foundation pit. Dimensions of the pit
shall be designed according to Generator and foundation outline drawing (MLI A1B0 / B7G0).

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 12 of 13

Revision: Page:
GE POWER
D 12 / 13
HTGG610357

2.4.2.2 For Generators A7x, type WX..Z (generator terminals installed on the top of the generator
housing)

The number and dimensions of the cooler varies, and depends on the generator length and
power output.
The cooler dimensions are specified in Generator and foundation outline drawing (MLI A1B0 /
B7G0).
Minimum height for cooler removal below the foundation table see dimension “g” in Figure 22.
Minimum height below the cooler see dimension “h” in Figure 22.
2019-12-18 EN Approved
Lng. Status
Rev. Released
D
Type
EC
9470 HTGG610357
Dept. Document No.

Type g [mm] h [mm]


WX21Z 600 1280
WX23Z 700 1280

Figure 22. Minimum height above and below cooler

2.4.2.3 For W88 (50WT25E-138) Generators (water and hydrogen-cooled)

The heat exchangers, which cool the hydrogen within the generator, are surface heat
exchangers with water as a cooling medium. Each cooler consists of numerous straight tubes
with fins on their outer surface to increase the cooling surface and consequently the cooling
efficiency. Four coolers are installed vertically within the middle part of generator (in 2 cooler
pockets, on left and right side of the generator). Inlet and outlet of water are in the bottom part
of coolers in the foundation.

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.

GE Proprietary Information - Class II (Internal) US EAR - NLR


Released for Construction - set by J. LAFARGE on 13-août-20
DWG Number HTGG610357 Rev D Released 1/15/2020 Page 13 of 13

Revision: Page:
GE POWER
D 13 / 13
HTGG610357

Cooler pocket Generator coolers

Figure 23. Generator coolers on W88 (50WT25E-138)


2019-12-18 EN Approved
Lng. Status
Rev. Released

3 Notes
D

3.1 Identification of changes


Type
EC

Revision Date Changes made


9470 HTGG610357

- 2006-08-18 First issue


Dept. Document No.

A 2008-02-05 Page 6, chapter 8: requirements on gravel pocket more clearly described


GE template used / Sections re-arranged / new sections:
2.2.2 Division of responsibility and supply
B 2018-02-27 2.2.3 Material requirements
2.2.4 Installation of embedded parts
3 Notes
C 2019-08-29 Information about the W88 (50WT25E-138) generator has been added.

D 2019-12-04 Figure 2, Figure 4 and Item 2.2.2 have been updated.

 COPYRIGHT 2019 General Electric Company All rights reserved. The information herein is Proprietary and Technically Exclusive content
of the General Electric Company and/or its legitimate affiliates.